Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SAIMM
    A Quantitative Method for Selecting Renewable Energy Projects in the Mining Industry Based on Sustainability

    By M. Mostert

    Mining companies sponsor a range of non-core, corporate social responsibility projects to adhere to social and labour plans and environmental management prerequisites that form part of a mining licenc

    Jan 1, 2014

  • SAIMM
    Stability evaluation of room-and-pillar rock salt mines by using a flat jack technique – A case study

    By M. Z. Emad, N. Abbas, Y. Majeed

    Room-and-pillar mining is commonly employed for the extraction of rock salt in undergroundmines. Pillar stress is a major concern in these mines as it is directly related to stability and mineralrecov

    Jun 5, 2023

  • SAIMM
    Dimensioning of Tunnels in Swelling Rock

    By P. Wittke-Gatterman

    ABSTRACT: A three dimensional constitutive law for swelling rock is presented. It can be applied to the osmotic swelling of mudstone as well as to the swelling of rocks containing anhydrite. It descri

    Jan 1, 2003

  • SAIMM
    Fan-Structure Shear Rupture Mechanism as a Source of Shear Rupture Rockbursts

    By B. G. Tarasov

    This paper proposes the further development of a recently identified shear rupture mechanism (fan mechanism) that elucidates a paradoxical feature of hard rocks ? the possibility of shear rupture prop

    Jan 1, 2014

  • SAIMM
    Dp3 Tunnels Section

    Power Point Presentation

    Jan 1, 2007

  • SAIMM
    The use of mixed integer linear programming for long-term scheduling in block caving mines

    By G. van Hout, D. Rahal

    Caving is a mass mining method that is normally applied to large, low grade orebodies because of its low production cost and high capacity. However, equipment breakdown and poor draw management can ca

    Jan 1, 2003

  • SAIMM
    The Use Of Cusums As A Tool To Aid In The Interpretation Of Slope Monitoring Data With Specific Examples From An Operating Open Pit Mine

    By P. A. Lilly, W. Sarunic

    In most cases, slope movement monitoring data are collected on a temporal basis and displacement or velocity is plotted against time in order to assist the engineer to make judgements about slope beha

    Jan 1, 2006

  • SAIMM
    The Use And Applicability Of Flow Models To Quantify Intermine Flow In The Western Witbank Coalfields

    After the closure of collieries, they naturally start to fill up with water. As a result, hydraulic gradients develop between them and different hydraulic pressures are exerted onto peripheral areas o

    Jan 1, 2005

  • SAIMM
    New Approach to Evaluate the TOWS Matrix and its Application in a Mining Company

    By I. Cerny, M. Vanek, J. Hubácek

    "SWOT analyses and the closely related TOWS matrix are frequent starting points for an organization to develop its strategy. The paper deals with the evaluation of the TOWS matrix and presents three n

    Dec 1, 2018

  • SAIMM
    Estimation of Rock Strength From Quantitative Assessment of Rock Texture

    By C. A. Ozturk

    The compressive strength of rock (sc) has an important effect on design of structures in rock engineering. Compressive strength can be determined in the laboratory using the uniaxial compressive stren

    Jan 1, 2014

  • SAIMM
    Seismic Hazard In Western Australian Mines

    A Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western

    Jan 1, 2004

  • SAIMM
    Pushback 8 South ? A Case Study In Pit Slope Management

    By P Knight, P A. Walker, H E. Speight

    Pushback 8 South is the final cut back on the south wall of the East Pit at BHPBilliton?s Mt Whaleback iron ore mine in the Pilbara region of Western Australia. Development of the cutback commenced i

    Jan 1, 2006

  • SAIMM
    The Rehabilitation Of Impala No. 1 A Ventilation Shaft - Introduction

    By A. Bothma

    The Impala No. 1A ventilation shaft is located approximately 15 kms north of Rustenburg and is accessed via the R510road from Rustenburg to Northam/Thabazimbi. This situation is shown on the location

    Jan 1, 2001

  • SAIMM
    Alarm and evacuation systems in underground mining

    By J. L. Fuentes-Cantillana, Á. Rodríguez, P. Morillo

    Evacuation operations from work places in the case of an emergency are the key to minimising the effects of catastrophic type accidents such as fires, explosions, cave-ins, floods, etc. The correct pl

    Jan 1, 2003

  • SAIMM
    Value Creation In The Resource Business - Synopsis

    By J. M. Garcia

    This paper highlights several management practices from the oil and gas industry to support the proposition that financial performance in the finite, non-renewable resource business relates more to up

    Jan 1, 2011

  • SAIMM
    Translocation of an Endangered Succulent Plant Species From Sandstone Outcrops Earmarked for Coal Mining

    By E. Harris

    Frithia humilis is an endangered succulent plant species. Its distribution range overlaps with the coal fields of Mpumalanga and it is therefore threatened by opencast mining activities in particular.

    Jan 1, 2014

  • SAIMM
    Increasing Capacity And Productivity In The Metals Markets Through Pneumatic Conveying And Process Injection Technologies - The Southern African Institute Of Mining And Metallurgy

    By Mark Coleman

    Pnuematic Conveying and Process Injection Technologies have been implimented in the metals markets for the last 40 years and have consideribly improved the productivity and the performance of many pro

    Jan 1, 2008

  • SAIMM
    4.2 Woods -Quality Control Procedures at Gold Fields Ghana Limited, Tarkwa Mine

    By Reginald N. Boryor, Steven D. Woods

    1.0 Introduction ?Low grade, high tonnage, open pit gold mine. ?Gold bearing Tarkwaian conglomerates. ?Reverse Circulation percussion drilling (25m X 25m grid). ?Composite 1m intervals, logged a

    Jan 1, 2005

  • SAIMM
    Special General Meeting

    A Special General Meeting of the Institute was held in Kelvin House, Johannesburg on Wednesday, 29th September, 1971. The President, Prof. D. D. Howat opened the meeting at 9.55 a.m. The Preside

  • SAIMM
    Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc - Summary

    By K. Nong, H. F. Fuls

    The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl

    Jan 1, 2007