Helical Piers with Grouted Shafts -A Case HistoryBy Jr. D'Angelo, Michael M. Blendy, Shawn Downey
"A grouted helical pile was used to support new buildings in the reconstruction of a large residential development. Foundation options were complicated by urban fill underlain with variable alluvial s
Jan 1, 2005
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005
-
Evaluation Of Existing P-Y Models For Caliche Based On Numerical Analysis Of Raiders Stadium Lateral Load TestsBy Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan
Numerical lateral load analysis based on the beam on Winkler foundation (BNWF) model (i.e., the p-y method) is a simple, and widely used tool to predict lateral responses of drilled shafts from field
Oct 1, 2022
-
Steel Innovation: Changing the Economics of Below Grade FoundationsBy Dean Abbondanza
"Below grade foundation design has construction issues that above grade foundations do not. These cost factors are dependent on soil conditions and vary by region, but for the most part, the process r
Jan 1, 2005
-
Blast Densification Of Fine TailingsBy Brian W. Wilson
A case study is presented that describes the design and implementation of a combined blast densification and deep dynamic compaction program which was undertaken to improve the foundation soils for a
Jan 1, 2010
-
Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling TechniquesBy Huw Williams
"Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi
Jan 1, 2005
-
Evaluating Installation Disturbance of Helical Anchors in Clay from Field Vane TestsBy John Erikson, Alan J. Lutenegger, Nicholas Williams
"In order to evaluate the level of disturbance produced in clays during installation, a series of single-helix and multi-helix anchors were installed at a test site consisting of a stiff overconsolida
Jan 1, 2017
-
Practical Construction Considerations for Runway Extension and Taxiway Expansion over Soft/Organic Soil Using a Column Supported Load Transfer PlatformBy Brian T. Nereson, Michael C. Penney
"This technical paper was prepared to describe the general process by which the authors designed a column-supported load transfer platform (LTP) for support of asphalt-paved runway and taxiway embankm
Jan 1, 2016
-
Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity AnalysisBy Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe
The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc
Jan 1, 2017
-
Resonance Pile Driving with Zero Ground VibrationBy Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
The Secret to DewateringBy Gregory M. Landry
"There is an old joke at Moretrench that defines dewatering as “that element of an underground construction project, which, when disregarded, will generate the low bidder.” Sigmund Freud wrote that al
Jan 1, 2017
-
Pile Driving Hammers In Centrifuge Modelling - SynopsisBy Daniel Levacher
Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install
Jan 1, 1996
-
Geotechnical Monitoring Of Deep Shoring Adjacent To Train InfrastructureBy Jakub Szary
Excavation and shoring adjacent to the above-grade Gilmore train station and elevated guideway was undertaken in 2019. A perimeter secant pile cut-off wall was constructed to a depth 37 m (121 ft) bel
Sep 1, 2022
-
Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)By Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in
May 11, 2007
-
Deep Drilling at Mica Dam, British ColumbiaBy Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer
"Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow
Jan 1, 2017
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A RampBy Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
Development of Environmental Double Pile (EDP) for Improvement of Contaminated Soft GroundBy Hyunsuk Yoon, Kiho Lee, Juhyng Lee, Younghoon Jung, Junboum Park
"The environmental double pile method is presented as a device to improve the engineering properties and to clean up contamination of low-permeability soil. This method is one of the novel technologie
Jan 1, 2005
-
Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And ConstructionBy David R. Sutfin, Joseph Lodde
110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method
Jan 1, 2019
-
A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty GroundBy H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi
"In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe