Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Some Practical Applications of Fundamental Sinter Research

    By W. E. Davies

    "This paper is the sequel to that on Developments in Sintering Efficiency delivered by Davies and Mitchell at the International Ore Dressing Congress, Stockholm, 1957. Attention is drawn to the fundam

    Jan 1, 1960

  • CIM
    The Impact of Tonnage Oxygen on Steelmaking at Stelco

    By F W. Irwin

    In recent years, a number of significant developments have occurred in the steel industry which are no-table and of general interest. This paper is confined to the steel-melting phase of the business.

    Jan 1, 1965

  • CIM
    Giant's Milling Operation

    By H. E. Pawson

    Giant Yellowknife is located 600 air miles north of Edmonton on the north shore of Great Slave Lake in the Northwest Territories. In its 24 years of operation some 7,730,000 tons of ore have been trea

    Jan 1, 1973

  • CIM
    Tantalum, Niobium, and Titanium Coating for Biocompatibility Improvement of Stainless Steel Dental Implant

    By M. H. Fathi

    The aim of this work was to prepare the metallic coatings on 316L stainless steel dental implant and evaluate the corrosion characteristics and thus the biocompatibility of the uncoated and metallic c

    Jan 1, 2007

  • CIM
    Mechanical properties of 3XX aluminum alloy test bars from the ASTM B108 and a modified mould in as-cast and heat-treated conditions

    By D. Emadi

    The ASTM B108 Mould and a Modified Mould were used to cast test bars under a variety of conditions: mould and pouring temperatures, mould coating and tilt. Mechanical properties were determined in the

    Jan 1, 2004

  • CIM
    The Handling Of Sour Well Fluids In The Pincher Creek Field

    By C. Stamberg, W. McGuire, R. C. Carlson, L. W. Vollmer

    "The selection of materials and pre-cautionary measures for handling natural gas and condensate containing aqueous hydrogen sulphide are presented. Based on the results of a pilot production test and

    Jan 1, 1960

  • CIM
    Economical Manufacture of Quality Lime (caec3a53-9812-4761-a5b0-5c17ff14588a)

    By Victor Azbe

    Azbe System of Controlled Calcination To obtain good and cheap lime there are certain fundamental requirements that need to be satisfied. These are : (1) Proper combustion of fuel and steady suppl

    Jan 1, 1946

  • CIM
    Increasing the Capacity of Existing and New Exothermic Autoclave Circuits

    By G. M. Dunn

    Pressure leach autoclave circuits are employed in the leaching of ores, concentrates, mattes, alloys and intermediates for the recovery of metals into solution. Once the metals are extracted into solu

    Jan 1, 2004

  • CIM
    On-Stream Measuring of Mineral Concentrations in Slurries Using LIBS Results

    By Olli Haavisto, Lauri Koresaar, Navid Khajehzadeh

    In recent times sustainable minerals processing is an important topic in research. Sustainable mining is linked with efficient use of energy and human resource in all process stages including benefici

    Jan 1, 2016

  • CIM
    The Mobilization and Potential “In-Autoclave” Recovery of Gold during Pressure Oxidation and Leaching of Auriferous Sulfide Materials

    By J. -C. Parisien-La Salle, D. Blais, G. P. Demopoulos

    "In this work the dissolution, precipitation and adsorption behaviour of gold in acidic iron sulphate media containing small amounts of chloride ions is investigated via batch laboratory tests and OLI

    Jan 1, 2012

  • CIM
    Blasting Effect Analyses on Millisecond Blasting Model Tests with Multiturn Vertical Blastholes

    By Qin-yong Ma, Jing-shuang Zhang, Bo Han, Pu Yuan

    In order to improve the utilization rate of blasthole and blasting effect in vertical shafts, 5 kinds of millisecond blasting model tests with three circle vertical blastholes have been conducted in v

    Jan 1, 2015

  • CIM
    Faults Affecting the Northeast Thelon Basin: Improved Basement Constraints from Source Edge Processing of Aeromagnetic Data

    By Vicki Tschirhart, Bill Morris, McMaster University

    A new method for mapping faults within basement rocks underlying the Thelon Formation and glacial overburden was developed and tested in the Aberdeen Sub-basin. This method utilizes newly acquired aer

    Jan 1, 2013

  • CIM
    Automatic (Mechanical) Coal Sampling

    By T E. Tibbetts

    This paper deals with coal sampling in general and with mechanical coal sampling in particular. The necessity of obtaining representative samples is emphasized. Other sections of the paper are devoted

    Jan 1, 1965

  • CIM
    Development of Corrosion-Resistant Low Alloy Steels for Commercialization

    By B. Voyzelle

    The deterioration of highway and bridge infrastructure has received considerable attention in recent years because of the billions of dollars needed for repair and rehabilitation. A major factor contr

    Jan 1, 2005

  • CIM
    The Shortage of Engineers -Are We Working on the Solution or Are We Part of the Problem?

    During the past decade, the miner-al industries have been faced with an increasing shortage of engineers. The point has now been reached where the shortage may be termed critical. This shortage may be

    Jan 1, 1965

  • CIM
    Suggested Criteria for the Custody Transfer Design of Automatic Installations

    By K. H. Kretzschmar, M. A. Smith

    A brief review of the rapid growth of ACT in Western Canada is presented. It is remarked that this rap-id growth has been accompanied by a heterogeneous approach to design. A more rational and consist

    Jan 1, 1960

  • CIM
    The Effect of Lifter Design on the Alumbrera's SAG Mill Performance: Design Expectations and Optimization

    By Mark Sherman, M. Dennis, Raj Rajamani

    "The two Alumbrera 36ft (10.97m)dia. SAG mills were sized, using the FDW ""Grindpower 'I program, to treat an average of 1852 tph each. This paper describes how modelling of the shell lifter design, u

    Jan 1, 1999

  • CIM
    A Structured Approach to Conducting Site Risk Reviews

    By T. Gonzales, S. Thakurdin

    The conducting of risk reviews is an essential activity in ensuring safe operating conditions, both during project design phases and for existing facilities. The following paper presents a structured

    Jan 1, 2019

  • CIM
    Numerical Investigation of Seismic Events Associated With Hydraulic Fracturing

    By M. B. Dusseault, A. Pirayehgar

    "There is concern that hydraulic fracturing (HF) near an existing critically stressed fault could trigger slip and generate a seismic event of significance. To this end, a mathematical discontinuum mo

    Jan 1, 2015

  • CIM
    Remarks Deposits ? on Some Sulphide Volcanic Extrusivest

    By G G. Suffel

    T HESE remarks on the occurrence of strata-bound massive sulphide deposits are submitted be-cause the writer recently visited the principal Cyprus deposits (in January, 1965) and has also a back-groun

    Jan 1, 1965