The Effect of Lifter Design on the Alumbrera's SAG Mill Performance: Design Expectations and Optimization

Canadian Institute of Mining, Metallurgy and Petroleum
Mark Sherman Raj Rajamani M. Dennis
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
12
File Size:
884 KB
Publication Date:
Jan 1, 1999

Abstract

"The two Alumbrera 36ft (10.97m)dia. SAG mills were sized, using the FDW ""Grindpower 'I program, to treat an average of 1852 tph each. This paper describes how modelling of the shell lifter design, using the Millsoft program, identified milling inefficiencies caused by poor charge motion. This explained the ""as built"" circuit's inability to achieve the throughput rates predcted by the circuit's designer. Use of the Millsoft program to design a new, dramatically different lifter configuration, in conjunction with a different approach to variable speed drive utilization, has resulted in an improved charge motion and a 30% increase in hard ore milling rates. The new lifter design has allowed the designer's predicted average throughput rates to be achieved.IntroductionThe Alumbrera project grinding circuit consists of two 36ft dia. X 17ft EGL, 13 500 kW, variable speed, gearless drive SAG mills coupled to four 20ft dia. X 30ft EGL, 6 000 kW fixed speed, gear driven, ball mills. The circuit is configured as two identical grinding aisles, each consisting of one SAG mill and two ball mills. No pebble crushing circuit was installed due to the expected absence of a critical size fraction in the first years of production. However, the grinding circuit layout does incorporate space for a pebble crushing retrofit. At present, only about 5% - 10% of the new mill feed reports as trommel oversize and is recycled back to each SAG mill using a water cannon.The circuit was designed to be ball mill limited and to treat the four major Alumbrera ore types at rates varying between 68 000 tpd, and 89 750 tpd, depending on ore hardness. Average throughput rate, and hence nominal design rate, for the grinding circuit was 80 000 tpd (1 852tph per line at 90% availability)."
Citation

APA: Mark Sherman Raj Rajamani M. Dennis  (1999)  The Effect of Lifter Design on the Alumbrera's SAG Mill Performance: Design Expectations and Optimization

MLA: Mark Sherman Raj Rajamani M. Dennis The Effect of Lifter Design on the Alumbrera's SAG Mill Performance: Design Expectations and Optimization. Canadian Institute of Mining, Metallurgy and Petroleum, 1999.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account