Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Canadian Precambrian Shield

    By J. E. Gill

    "The name 'Canadian Shield' is used for a vast area; largely in northeastern; Canada; underlain by Precambrian rocks. The part in Canada has an area; of about 1; 790; 000 square miles. Extensions in G

    Jan 1, 1954

  • CIM
    Westar Mining Ltd.-an overview of operations in southeast British Columbia

    By L. B. Hale

    "Introduction This paper will discuss the current operations of Westar Mining Ltd. and give a brief history of the company and of the Crowsnest Pass area. Westar is an integrated company involved in m

    Jan 1, 1985

  • CIM
    Towards an Agenda for Change: The Work and Results of MMSD North America

    By R. Anthony Hodge

    1. Today?s Reality: Voisey?s Bay EIA Activities of the Canadian Environmental Assessment Agency The Tulsequah Chief Decisions The Bank of Montreal The World Bank World Business Council on Susta

    May 1, 2002

  • CIM
    Remediation of Abandoned Lignite Mines in East Germany - Technical, Environmental, and Social Challenges

    By M. Kuyumcu

    After German reunification the mining industry in former East Germany was profoundly restructured. Beside privatization of profitable companies the public sector took over responsibility for the minin

    Aug 1, 2013

  • CIM
    Geological Environments for PGE-Cu-Ni Mineralization in the East Bull Lake Gabbro-Anorthosite Intrusion, Ontario

    By D. C. Peck, James. R. S., Chubb. P. T.

    "Abstract -The East Bull Lake gabbro-anorthosite intrusion is one of several Early Proterozoic layered matie intrusions occurring along the Southern Province - Superior Province boundary in the Ellio

    Jan 1, 1993

  • CIM
    The Ecstall Story: The Underground Mine .

    By John Ramsay, Frederick A. Edwards, J. Eric Belford, Clarence V. Amyotte

    "DEVELOPMENT of the underground mine is carried out from a main ramp driven from surface to the 800 and 1200 levels and from a shaft sunk to 3050 ft. Sub-levels at approximately 100-ft vertical interv

    Jan 1, 1974

  • CIM
    Flocculation of froth flotation tailings from a coal washery

    By H. A. Hamza

    An experimental study of the settling characteristics of a washery effluent originating as tailings from a froth flotation circuit was undertaken by using a systematic approach to select the most appr

    Jan 1, 1979

  • CIM
    Investigation of Geomechanical Mechanisms Contributing to Valley Closure Subsidence Effects – A 3D Numerical Modelling Approach

    When underground extractions occur beneath or in close proximity to valleys and other forms of irregular surface topographic features, the observed vertical subsidence at the base of the valley is les

    Jan 1, 2015

  • CIM
    Recent Developments in Preconcentration Using Dense Media Separation

    By W. Tse, D. Wong

    Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run of mine ores at relatively coarse particle sizes prior to additional milling and benefi

    Jan 1, 2014

  • CIM
    Engineering and Construction Of Plant and Wharf Facilities

    By F. S. Thurner

    "This paper describes the engineering and construction activities of the ""design-build"" project awarded to the joint venture of Foundation-Comstock-Janin for the construction of the plant and wharf

    Jan 1, 1976

  • CIM
    The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant Operation

    By P. Kawulka

    An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p

    Jan 1, 1978

  • CIM
    Block Stability Analysis of Left Bank Slope of Beihetan Hydropower Station in Jinshajiang River, China

    By G. Rong, W. Du

    Stability of some potential unstable blocks in the left bank slope of Baihetan hydropower station is evaluated in this paper using the three-dimensional (3D) limit equilibrium method. The Baihetan hyd

    Jan 1, 2015

  • CIM
    CSR Adoption in the Global Mining Industry: Explaining Convergence and Divergence

    By Hevina S. Dashwood

    This paper proposes to build on my previous research (Dashwood 2012), which analyzed how and why the norm of sustainable development became institutionalized in the global collaborative corporate soci

    Aug 1, 2013

  • CIM
    Electromagnetic Responses to Massive Sulfide Ore Systems of Various Morphologies and Conductivities

    By A. H. Mumin, A. Prikhodko

    "This paper provides an understanding of interpreting and evaluating airborne time domain electromagnetic (TEM) surveys as applied to massive sulfide exploration. Variations in the conductive morpholo

    Jan 1, 2018

  • CIM
    Geology of the Cargill Township Residual Carbonatite-associated Phosphate Deposit, Kapuskasing, Ontario

    By Reno Pressacco

    Abstract- Agrium Inc. is a world leader in the production, distribution, and marketing of agricultural products and services in both North America and Argentina. The new phosphate mine and mill comple

    Jan 1, 2001

  • CIM
    The Influence Of Plastic Anisotropy And Damage On The Crack Propagation Behaviour Of Zr-2.5nb Pressure Tube Material

    By B. W. Williams

    The crack propagation behaviour of Zr-2.5Nb pressure tube material was studied through comparison of the measured behaviour with the predicted response from finite element analysis. Three-dimensional

    Jan 1, 2010

  • CIM
    Preparing a Long-Lasting Environmental Impact Statement

    By Glen A. White

    The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi

    May 1, 2004

  • CIM
    An Overview of the Design, Construction, Commissioning and Early Years of Operation of the SAG/Ball Mill Grinding Circuit at Phu Kham Copper, Gold Operation in Laos

    By J. B. Hadaway

    The operation at Phu Kham commenced design and construction in early 2006 and was commissioned in May 2008. This paper will examine and discuss the project from the inception of flow sheet development

    Jan 1, 2012

  • CIM
    Some Geological Aspects of the Sydney Coalfield with Reference to their Influence on Mining Operations

    By T. Binnert Haites

    INTRODUCTION NUMEROUS examples of troubled zones, interfering with the normal development of coal seams, have been cited in the literature. From a geological point of view they can be subdivided into

    Jan 1, 1951

  • CIM
    Pilot Plant Evaluation of a Hybrid Biological Leaching-Pressure Oxidation Process for Auriferous Arsenopyrite/Pyrite Feedstocks

    By I. Dymov, W. Phillips

    A process has been evaluated, on a continuous pilot plant scale, to treat refractory gold arsenopyrite/pyrite concentrates. The process consisted of biological leaching to partially oxidise sulphides,

    Jan 1, 2004