Search Documents

  • SME
    Geotechnical Exploration For The H-3 Highway Trans-Koolau Tunnel

    By Lee W. Abramson, William H. Hansmire

    The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val

    Jan 1, 1989

  • CIM
    Systematic and Integrative Ore Characterization of Massive Sulfide Deposits: An Example from Voisey’s Bay Ni-Cu-Co Ovoid Orebody, Labrador, Canada

    By P. J. Sylvester, D. H. C. Wilton, R. I. Wheeler, M. A. E. Huminicki, D. Evans-Lamswood

    "Systematic characterization of the mineralogy of massive sulfide ore deposits can provide valuable insights into ore genesis and metallurgical processing that would not be apparent otherwise. We desc

    Jan 1, 2012

  • SAIMM
    A Glimpse Of Pyrometallurgy At Wits University

    Keywords: Pyrometallurgy, Wits University, research Wits Metallurgy celebrated its centenary in 2004. The department has been at the forefront of education and research and has contributed greatl

    Jan 1, 2006

  • CIM
    A New Method for the Stabilization of Arsenic from Enargite Concentrates

    By R. Barbaroux, B. Dubreuil, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "As conventional, base or precious metal ores are being depleted worldwide, the mining industry is being faced with an increasing exploitation of arsenical sulfidic ores. Enargite is a common example.

    Jan 1, 2017

  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • CIM
    Is Your Management Control Loop Functioning

    By John D. Campbell

    "IS YOUR MANAGEMENT CONTROLLOOP FUNCTIONINGMineral processors make use of hundreds of control circuits in their mills, process plants, smelters and refineries, to optimize throughput and recovery and

    Jan 1, 1985

  • IOM3
    Crown pillar risk assessment - planning aid for cost-effective mine closure remediation

    By T. G. Carter, R. I. Miller

    First, the influence of variation in the

    Apr 1, 1995

  • NIOSH
    OFR-97(1)-77 Development Of A Conveyor-Type Cross Pit Overburden And Material Handling System - Revision -1

    By L. J. Defferding

    This report documents the work performed by Battelle-Northwest and its sub-contractors in Phase I of a project to develop a cross pit conveyor system for the Bureau of Mines. The conveyor system des

    Jan 1, 1976

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963

  • SAIMM
    Relating High-Resolution Tilt Measurements To The Source Displacement Of An M2.2 Event Located At Mponeng Gold Mine

    By P. Share

    As part of JAGUARS (JApanese-German Underground Acoustic emission Research in South Africa), high-resolution tiltmeters were installed during 2007 at Mponeng gold mine, South Africa, in an attempt to

    Oct 1, 2013

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • AUSIMM
    The History of Ore Treatment Processes in Broken Hill

    WHEN mining and treatment first started at Broken Hill only oxidised ores were available. These ores were rich in silver and lead-the silver mainly existing as chloride and the lead as carbonate.Treat

    Jan 1, 1928

  • IIMP
    Sistemas de información en planta

    By José Arango

    La Planta Hidrometalúrgica de Cerro Verde tiene como objetivo alcanzar la máxima calidad en cada uno de sus procesos operativos. Para ello, desarrolla un diseño que permita la transformación del contr

    Jul 17, 2000

  • SAIMM
    Hatch Developments In Furnace Design In Conjunction With Smelting Plants In Africa

    By R. Sullivan, K. Joiner, B. Emery, M. de Vries, F. A. Stober, L. R. Nelson, J. M. A. Geldenhuis

    Keywords: Pyrometallurgy, smelting, converting, furnace design, furnace retrofit, high-intensity smelting, copper coolers, plate coolers, waffle coolers, tap-blocks, lower sidewall air-cooling, wall h

    Jan 1, 2006

  • DFI
    Pile Monitoring, Testing, And Data Processing: New Developments And Remaining Issues

    By Alain E. Holeyman

    After scoping out the objectives of this general report, the report reviews the three assigned main themes addressed by the papers submitted to the session: pile monitoring, testing, and data processi

    Jan 1, 2006

  • AUSIMM
    The Effect of Particle Size on the Activation and Flotation of Sphalerite

    By Kelsall D. F, Trahar W. J

    The size by size batch flotation behaviour of copper activated sphalerite from synthetic mixtures with quartz was determined. In terms of recovery of sphalerite, the size fractions could be grouped in

    Jan 1, 1975

  • AUSIMM
    Late Metamorphic Structural Zones in the Otago Schist: Prospective Hosts for Gold Mineralisation

    By M Begbie, R J. Norris, D J. MacKenzie

    The Otago Schist is crossed by numerous deformation zones that formed in the latter stages of metamorphism and uplift of the metamorphic belt. These deformation zones are long (tens of km) linear feat

    Jan 1, 2005

  • SAIMM
    Building A Database For The Prediction Of Phases In Pt-Based Superalloys

    By L. A. Cornish, S. N. Prins, R. Süss

    The work is being done using the Thermo-CalcTM software, and the database is being built up by obtaining good thermodynamic descriptions of all of the possible phases in the system. The database suppl

    Jan 1, 2006

  • AUSIMM
    The Effect of Roll Speed, Electrode Voltage, and Electrode Position in High Tension Separation

    By Hudson S. B

    With a particular electrode configuration, and a particular combination of electrode voltage and roll speed, a relatively small increase in electrode voltage, or a relatively small decrease in roll sp

    Jan 1, 1962

  • DFI
    The Design Of Deepwater Wharves Which Are In The Complex Geological Conditions Of Pearl River Estuary

    By F. W. Liang

    The geology of pearl River estuary belongs in strong weathered rock quaternary geological systen, so the conditions are complication. Since 80's we built the first deepwater wharf of Shenzhen chi

    Jan 1, 1991