    Application of Updated Joint Detection Algorithm for the Analysis of Drilling Parameters of Roof Bolters in Multiple Joints Conditions

    By Jamal Rostami, Asok Ray, Samer S. Saab Jr., Wenpeng Liu

    Ground instability, such as roof or rib failures, is one of the most serious and frequent safety hazards that occur in underground mining, tunneling, and underground construction. The ground-related p

    Jan 1, 2017

  • SME-ICGCM
    Progress in Managing the Geotechnical Aspects of Longwall Face Recovery

    By David Hill

    "End of panel longwall face recovery is almost certainly the most involved recurring geotechnical problem faced by operators, with major loss potential should problems occur. The paper presents Austra

    Jan 1, 2010

  • SME-ICGCM
    Improved Roofbolting Methodologies: Reducing Hydraulic Fracture of Strata

    By David W. Evans

    "Induced hydraulic fracture of strata during roof bolt installation is a potentially prevalent, but masked phenomenon within the underground coal industry. Previously reported resin testing programs (

    Jan 1, 2015

  • SME-ICGCM
    Constraint Is The Prime Variable In Pillar Strength

    By Clarence O. Babcock

    Since Vicat in 1833, the width to height ratio of a mine pillar has been taken as the fundamental variable in pillar design. From work in the laboratory by many investigators testing rock, Coal and co

    Jan 1, 1984

  • SME-ICGCM
    Evaluation of the Impact of Standing Support on Ground Behavior in Longwall Tailgates (8a8cef19-7d7c-417d-83e0-31858c1152c5)

    By Thomas Barczak

    Longwall mines typically use some form of standing support for secondary roof support in longwall tailgate entries. Although there have been several new support products developed for this application

    Jan 1, 2005

  • SME-ICGCM
    Comparisons Of Active Versus Passive Bolts In A Bedded Mine Roof

    By Steve P. Signer

    A study of rock support interaction mechanics was conducted by the U.S. Bureau of Mines at the Jim Walter Resources No. 7 Mine, Brookwood, AL. Bolt loads and entry deformation were monitored at four s

    Jan 1, 1993

  • SME-ICGCM
    The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - Introduction

    By Robert C. Speck

    Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo

    Jan 1, 1981

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003

  • SME-ICGCM
    Spreading of Ground Pressure Fluctuation in the Gob

    By Katya V. Babenko, Victor V. Nazimko

    We address the problem of the stochastic nature of ground pressure manifestation. Stress distribution in a rock mass and ground irreversible movement are governed with a set of random factors that aff

    Jan 1, 2017

  • SME-ICGCM
    Dynamic Failure in Coal Seams: Implications of Coal Composition for Bump Susceptibility

    By Arthur Miller, Andrew Weakley, Heather E. Lawson

    "IntroductionDynamic failure events in an underground coal mine, or “bumps,” are defined as “the sudden, violent bursts of coal from a pillar or pillars or a block of coal, resulting in a section, the

    Jan 1, 2015

  • SME-ICGCM
    Probabilistic Approach to Coal Pillar Design

    By Ben Fahrman

    The classical approach to engineering design involves the purely deterministic calculation of the factor of safety, the ratio of strength to stress. The factor of safety is an easy calculation to perf

    Jan 1, 2013

  • SME-ICGCM
    Fully Grouted Torque Tension Bolts Successfully Support Pittsburgh Seam Longwall Gate-roads

    By John Kucish

    Roof bolting in the Pittsburgh Coalbed takes many forms today: coupled partially grouted bolts, fully grouted rebar, passive cable bolts, tensioned cable bolts, and torque tension rebar. The Federal N

    Jan 1, 2005

  • SME-ICGCM
    Topography and Coal Seam Initial Stress Estimation: a Sensitivity Study

    By Jeffrey K. Whyatt

    Estimation of the initial vertical stress carried in a coal seam is an important first step in virtually all methods of evaluating the required size of pillars in coal mines. Such estimates are a triv

    Jan 1, 2011

  • SME-ICGCM
    Spatial Trends In Rock Strength - Can They Be Determined From Coreholes? (51393e91-3e75-4a8d-ac36-e107a993fe35)

    By Christopher Mark

    Mine planning for a new reserve is based on information obtained from exploratory coreholes. A critical component of an exploration program is the geotechnical evaluation. Poor assumptions about roof

    Jan 1, 2004

  • SME-ICGCM
    Strata Control Advances At Jim Walter Resources, Mining Division

    By Eddie Martin

    Jim Walter Resources, Mining Division, employs the retreat longwall mining system as the primary method of coal production. The strata control aspects of developing and maintaining roadways for retrea

    Jan 1, 1988

  • SME-ICGCM
    Influence of Structural Stress Concentration and Structural Irregularity on Longwall Gateroad Roof Control

    By Daniel Su

    Following several roof falls in the E3 longwall development of a Consol Pennsylvania Coal Company underground coal mine, an underground roof geology reconnaissance program consisting of twenty-nine 20

    Jan 1, 2002

  • SME-ICGCM
    Review of Evaluation and Design of Secondary Support Performance in Longwall Ventilation Entries

    By Erik Westman, Benjamin Mirabile

    "Quantitative evaluation of secondary support performance in longwall tailgates in U.S. coal mines was introduced with the U.S. Bureau of Mines (USBM) Wood Crib Performance Model. This model evaluated

    Jan 1, 2018

  • SME-ICGCM
    Basic Procedures for Monitoring and Modeling Abandoned Underground Coal Mines for Safety Due to Uncontrolled Closures: Case Study of Verdinho Mine, Santa Catarina State, Brazil

    By Selmar A. Oliveira

    "Safe mine closure is an important step in the mining lifecycle. Plans for safe and efficient closure should begin at the inception of mining. Ideally, closure occurs when the reserve has been deplete

    Jan 1, 2017

  • SME-ICGCM
    Pillar Design - Continuous Miner Butt Section And Longwall Development Sections

    By Lawrence R. Artler

    The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"

    Jan 1, 1984

  • SME-ICGCM
    Analysis of Extensometer Data from a Room Widening Experiment Designed to Induce a Roof Fall

    By Dennis R. Dolinar

    Roof falls, even of supported roof, still constitute a major hazard in underground mines. However, associated with any fall or instability is a pattern of roof movement. Therefore, the National Instit

    Jan 1, 1997