Understanding Coal Ash Quality ParametersBy E. C. Winegartner
In producing and selling coal, the coal company is faced with many different parameters by which the quality of its product is evaluated. One type, which we choose to call the economic parameters, inc
Jan 1, 1975
-
Uranium Mill Waste Disposal ? IntroductionBy Robert G. Beverly
The presence of radioactivity in uranium mill wastes has resulted in somewhat unique waste disposal methods. In addition to the common problems of disposing of large quantities of solid wastes, neutra
Jan 1, 1968
-
Comminution Circuits -Getting The Work You're Paying ForBy C. A. Rowland
The rising costs for and the possibility for limited availability of electrical energy are emphasizing the continual conflict faced in the selection of comminution circuits used in preparing ores for
Jan 1, 1977
-
Multi-objective mathematical programming framework for integrated oil sands mine planning and tailings disposal optimizationBy Hooman Askari-Nasab, AHLAM MAREMI, EUGENE BEN-AWUAH
In oil sands mining, tailings are voluminous unwanted byproducts generated from extracting the desired mineral from the mined ore. Dyke construction and backfilling activities require well-managed tec
-
Palabora - Changing To Meet The Challenge Of The 80's (d5b5051e-9d5f-4235-982c-36a6ba44fe75)By J. P. Gliddon
Since 1980 a number of significant changes have been introduced at Palabora in an effort to off-set the effects of reduced product price and increased unit cost of inputs. These changes and improveme
Jan 1, 1987
-
The Karst Asbestos Deposit Gallatin County, Montana Recent Developments And ProblemsBy Charles M. Hauptman
The Karst asbestos deposit, discovered seventy years ago, is 32 miles south of Bozeman in southwestern Montana. The deposit is about one-half mile west of the Gallatin River which flows in a deep V-sh
Jan 1, 1971
-
In Situ Determination Of Methane Gas In Utah Coal Mines (A Case History)By V. J. Hucka
Coal, which was discovered in Utah in 1849, covers about 18% of the total area. Production in 1981 vas more than 14 million tons. However, some Utah coal mines are quite gassy. If longwall face techno
Jan 1, 1983
-
Flotation Improves Coal Quality And Simplifies Fine Coal Flowsheet At Vesta ? IntroductionBy J. P. Morgan
The Vesta Preparation Plant of the Jones & Laughlin Steel Corporation is located on the Monongahela River, eight miles south of Brownsville, Pennsylvania. This plant is capable of cleaning 2400 NT/hr
Jan 1, 1962
-
Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?By Giuseppe M. Gaspari, Tamara Kondrachova
Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area bet
Jun 13, 2021
-
Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022By Justin Kolster, Donald Benjamin, Kyle White
Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re
Dec 1, 2022
-
Control Of Artesian Ground Water In Strip Mining Phosphate Ores - Eastern North Carolina - IntroductionBy John M. Hird
Texas Gulf Sulphur Company's Lee Creek Mine has opened a major phosphate mining district in the Central Coastal Plains of North Carolina (Fig. 1). The ore deposit as it is now known was roughly o
Jan 1, 1970
-
Past And Present Trends For Mine Power SystemsBy John A. Dunn
The history of underground coal mining has developed through the years from a manual digging and loading process to the highly mechanized pro- cess that it is today through the use of electric power.
Jan 1, 1964
-
Results of Discrete Event Simulation in a Large Open Pit Mine (01b83ee3-82e5-44b3-a9e0-f828c81066c7)By S. R. Dindarloo
"Truck-shovel systems are the dominant material loading and haulage machinery in open pit mining operations. Optimal selection, sizing, and allocation of this capital intensive equipment is highly des
Jan 1, 2015
-
Overcoming Preconceptions For A Successful launch Of Autonomous HaulageBy James Humphrey
There is a natural resistance to change in any form. When it comes to implementing a game-changing technology like autonomous haulage on an operating mine site, the resistance can at times appear insu
-
Effect of combined mechanical and ultrasonic milling on the size reduction of talcBy Diler Katircioglu-Bayel
This study aims to investigate the effect of combined mechanical and ultrasonic milling on the size reduction of talc. First, the talc sample was wet-ground in a stirred media mill for five different
-
Impact of operating parameters on the breakage process of talcBy Diler Katircioglu-Bayel
The effects of the operating parameters of media filling ratio, solid mass fraction, grinding media size and grinding time on the stirred media milling of talc were studied. The findings were assessed
-
Empirical formulae for determining pressure drop across a 20-layer flooded-bed scrubber screenBy Adam Levy, Thomas Novak, Sampurna Arya, Joseph Sottile, Kozo Saito
The use of a woven wire-mesh screen as part of a flooded-bed dust-scrubbing system is popular in the underground coal mining industry. It is used in combination with a demister (mist eliminator) to re
-
Down but not out: Coal industry rallies at 2013 PCMIA/SME meetingBy Emily Wortman-Wunder
While the mood at the 2013 annual joint meeting between the Pittsburgh Coal Mining Institute of America (127th Annual Meeting) and SME Pittsburgh Section (68th Annual Off-the-Record Meeting) in Canons
Jan 1, 2014
-
Use of a new insertion apparatus for improving the performance of friction rock stabilizersBy EREN KOMURLUR, ATILA GURHAN CELIK, IBRAHIM GUNES
In this study, laboratory and site studies were performed to investigate the usability of a new insertion apparatus designed for the split-set type of friction bolts. The new apparatus decreases the f
-
The Evolution Of Fine Refuse Disposal At WIDCOBy Thomas M. Lynberg
WIDCO is a surface coal mine located near Centralia, Washington. The WIDCO preparation plant processes over 7 million tons of run- of-mine coal each year with a product yield averaging 72%. In the jig
Jan 1, 1981