Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Integrating Rock Impedance and Blast Design: A Mode-Based Approach to Fragmentation Efficiency and Nox control

    By Francisca Tapia, Jorge Blázquez, Paulo Couceiro, Patricio Vergara, Luis Manriquez, Luis Martínez, Juan Navarro

    Efficient energy transmission is critical for effective rock fragmentation in open-pit blasting. However, in zones with highly fractured or soft rock, mismatches in acoustic impedance between the expl

    Jan 26, 2026

  • ISEE
    Ground Reaction Time Measurement and Modelling for Improved Blast Outcomes

    By Richard Turnbull

    Maules Creek mine is an open cut coal near Boggabri in the Gunnedah Basin of New South Wales, Australia. The mine is currently operating at an annualised run rate of 9.5Mt of saleable coal. The plan i

    Jan 1, 2018

  • ISEE
    Bingham Canyon Mine-Blasting Through and Next to Active Underground

    By Robert Cefalo

    Drill and Blast Engineer Abstract In 2019, the Bingham Canyon Mine, owned by Rio Tinto Kennecott Utah Copper Company, mined through the active underground that dewaters the pit. The active underground

  • ISEE
    Use of Explosives to Protect a Native Westslope Cutthroat Trout Population In the South Fork Madison River, Montana

    By Jeff Hiedeman, Clint Sestrich, Christopher Hyle

    Westslope Cutthroat trout have declined in distribution and abundance across their range and currently occupy about 59% of their historic habitat. Due to hybridization with non-native species such as

    Jan 1, 2011

  • ISEE
    Damage to Rock: Near Field Seismic Models Revisited

    By Santiago Gómez, Pablo Segarra, José A. Sanchidrián

    In this paper, differences between the industry-standard Holmberg-Persson (H-P) approach and a semi-analytical vibration prediction model called full-field solution (FFS) are analized. The analysis is

    Feb 1, 2020

  • ISEE
    Blast design optimization system to improve mining downstream operations by adapting the explosive energy to the rock mass based on drill monitoring data

    By P. Couceiro, J. Navarro

    A new methodology to perform selective blast designs by adapting the explosive energy, hole by hole (or in the hole), to the rock properties as a combination of their strength properties through the X

    Jan 1, 2024

  • ISEE
    Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction

    By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe

    Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the

    Jan 1, 2013

  • ISEE
    Blast Vibration Effects Upon a Deep Injection Well and the Reduction of Ground Vibration Over Depth

    By Jeffrey A. Straw, Joseph P. Jr Shinko

    Ground vibration produced by blasting operations within South Florida, due to saturated soil conditions, generates surface vibration waves that may be measurable over distances of 3 - 5 miles from the

    Jan 1, 1994

  • ISEE
    Demolition of Churchill House in Belfast, Ireland

    By Dick Green

    During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of

    Jan 1, 2006

  • ISEE
    Blasting Effects of a Non-Pressure Liquid Tank Task 662

    By David S. Shatzer, Michael R. Purcell

    Current world events have demonstrated the use of commercial vehicles, other unconventional modes of transportation and unusual materials as explosives or incendiary weapons, affecting commerce, disru

    Jan 1, 2004

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025

  • ISEE
    Electronic Detonator and Modern Non-Electric Shocktube Detonator Accuracy

    By Joshua Hoffman, William Chad Wedding, Braden Lusk

    The emergence of electronic detonators as viable products for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to tim

    Jan 1, 2011

  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    Pioneering with Medium Diameter Lifters

    By Luke Thornton, Jack Janssen

    An unconventional drill pattern is used in an aggregate quarry to reduce pioneering costs. The site is the Iron Mountain Quarry, Granite Falls, WA., an aggregate quarry with an annual production of in

    Jan 1, 1997

  • ISEE
    Tigerwin - A Windows PC Code for Computer Explosives Performance

    By Ed O'Connor, Per-Anders Persson, Manhong Zhou

    This chapter deals with the concepts of shock waves and detonation waves together, because a detonation wave is really a shock wave, supported by the explosive reaction that the shock wave ignites and

    Jan 1, 1997

  • ISEE
    Confiner Strength and Thickness Effects on Detonation Characteristics of Emulsion Explosives

    By D. Lynn Gordon, Larry B. Weston, Michael W. Manhart, Patrick R. Bowden, Michael W. Redmond

    Study of confinement effects on detonation characteristics and subsequent fitting form development as a function of confiner strength and thickness.

    Feb 1, 2020

  • ISEE
    Tehachapi, CA, Double-Track Project, Rock Slope Design and Excavation

    By Thomas Pallua, William C. Gates

    "Two major railroad companies have identified several segments along the railroad corridor betweenTehachapi and Bakersfield, Kern County in California that require construction of a second track to im

    Jan 1, 2017

  • ISEE
    Vibration Effects on Underground Concrete Structures

    By Frederick Kuhnow

    In open pit blasting, energy is released and transmitted through the geology. Negative effects can impact operations and can affect mine production. This paper presents recommendations for blast desig

    Jan 1, 2014

  • ISEE
    Improving Quarry Production Rates by Reducing Bucket Fill Time

    By Elliott Giles

    "Measuring a blast’s performance based on the bucket fill time or “diggability” has always been achallenge due to the subjectivity generally involved. The diggability of a blast is often based onopini

    Jan 1, 2016

  • ISEE
    Comparison of Ground Vibrations vs. Frequencies to Strain Rates from Blasting Operations at the Tennessee Capitol Corridor in Nashville, TN

    By William Gates, Gabe McClain, Thomas Pallua, Joe Schrank

    The Tennessee Capitol Corridor connects the Cordell Hull Building (CHB) to the State Capitol, which isa 232-foot-by-124-foot (71 x 38 m) structure in Nashville that includes porticoes built from local