    Diaphragm Walls for Seepage Control and Remediation: Three Case Histories

    By Fabio Santillán, Mario Mauro, Raffaella Granata

    "This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis

    Jan 1, 2016

  • DFI
    Site Development and Foundation Planning for a Wastewater Treatment Plant Expansion

    By Steven R. Ahlfield, Ali Ghandeharioon

    A wastewater treatment plant commissioned in 1978 is undergoing a major expansion. Planning various phases of the 8-hectare expansion at this site requires an understanding of the site response during

    Jan 1, 2019

  • DFI
    Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. Introduction

    By Edmund Cardoza

    In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil

    Jan 1, 1994

  • DFI
    Ground Improvement by Dry Concrete Columns

    By Tatiana Tronda

    "The territory of Belarus is characterized by nonhomogeneous ground conditions. In some cases soft ground layers can reach tens of meters in depth. Application of piles and other conventional foundati

    Jan 1, 2016

  • DFI
    Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction

    By Aaron Evans, Chu E. Ho, Tom Richards

    "This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet

    Jan 1, 2016

  • DFI
    Accuracy of Low-Strain Pile Integrity Test Results

    By Mahesh Hingorani

    Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv

    Jan 1, 2019

  • DFI
    Rocky Mountain Arsenal Section 36 Lime Basin Soil Remediation Project – Seepage Barrier

    By A. David Miller, Douglas M. Barber

    "The Rocky Mountain Arsenal was used by the military to produce chemical warfare agents and incendiary munitions for use during World War II and later by private companies for the production of indust

    Jan 1, 2015

  • DFI
    Cost Effective Excavation Support in Seattle

    By Richard D. Luark, Fernanda S. Madrona

    Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure

    Jan 1, 2019

  • DFI
    130 M Deep Bored Piles – A New Superlative

    By Vijay Kumar, Serhat Baycan, Karsten Beckhans

    For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep

    Nov 1, 2022

  • DFI
    Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of Shanghai

    By Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu

    "This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber

    Jan 1, 2015

  • DFI
    A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in Turkey

    By Arash Khosravifar, Amalia Giannakou

    "Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d

    Jan 1, 2017

  • DFI
    Augercast Piles - History And Advancements

    By Larry Rayburn

    Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout

    Jan 1, 2005

  • DFI
    Efficient Torque-Installed Pile Use in Southern California

    By Jason Buenker, Molly Winston

    Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp

    Jan 1, 2019

  • DFI
    Dam Wall Toe Stabilisation Using Mass Soil Mixing Techniques

    By David W. Martel, Tom George

    "As part of the regional water authority review and upgrade of local dams a 35m x 5m x 3m wet soil mixed block was required for stabilisation of a dam wall toe in remote Victoria, Australia. Remote ac

    Jan 1, 2015

  • DFI
    Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control

    By Rudolph P. Frizzi

    Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou

    Jan 1, 2005

  • DFI
    Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London

    By Shields H. Arup

    The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi

    May 1, 2022

  • DFI
    An Unique Formula for the Stone-Column Group Efficiency

    By Abhijit Saha

    "The stone columns improve the performance of foundations on soft and loose soil due to the ability of composite ground to sustain increased structural loads under reduced settlements. The interaction

    Jan 1, 2015

  • DFI
    Frustum Confining Vessel (FCV) For Investigation of Deep Foundation Performance

    By Abolfazl Eslami, Masoud Zare, Ali Asadi, Ali Abrang

    "Physical small scale models for study of deep foundations can be performed in simple chambers (1g), calibration chambers (CC), and centrifuge apparatus (ng) which involve some limitations and difficu

    Jan 1, 2015

  • DFI
    Drilled Shaft Acceptance Criteria Based Upon Thermal Integrity Profiling

    By Garland Likins, Gray Mullins, George Piscsalko

    "Quality control of drilled shafts is greatly dependent upon the practices of the site personnel. For drilled shafts cast under slurry, inspection of the hole prior to concreting is very difficult or

    Jan 1, 2016

  • DFI
    Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl Tests

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD

    The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval

    Oct 1, 2022