Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground "CIM Connect 2025"

    By Karl Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Oct 1, 2024

  • CIM
    The influence of processing parameters on TLP joining of Inconel 617 alloy

    By R. A. L. Drew, J. P. Immarigeon, F. Jalilian, M. Jahazi

    In the present work TLP bonding of Inconel 617 is investigated. The influence of the main processing parameters i.e. time and thickness of the interlayer were studied with optical and scanning electro

    Jan 1, 2004

  • CIM
    Improving Underground Mining/Ore Extraction Projects ROI Through Process Control (097a598a-a331-4ffc-b2c8-3b163e1e8ae3)

    By Charles Tkaczuk

    Key issues ? No business tool has greater potential to effect change and enhance profitability than process control. ? Successful businesses see process control as an integrated engineered system,

    May 1, 2004

  • CIM
    Drill Maintenance Process Improvements: Brunswick Mine

    By Steven Doyle

    Presentation Outline ?Introduction to Brunswick Mine ?Mining Needs and Drilling Trends ?Maintenance Program ?Back to Basics ?Results ?Additional benefits Introduction Xstrata Zinc Brunswick

    Nov 1, 2011

  • CIM
    Bankable Feasibility Studies ( and other terms)

    By Reinis Sipols

    AGENDA ? Introduction ? Definitions and Key features ? PEA - Preliminary Economic Assessments ? PFS ? Preliminary Fesibility Studies ? FS ? Feasibility Studies ? Costs and Risks ? Cash Flow, Ec

    May 1, 2013

  • CIM
    Aging effects in 319 alloys

    By N. R. Andrade-Gonzalez

    The present work was performed on four alloys containing Al-6 2 wt pct Si-3 5 wt pet Cu, with magnesium in the range of 0.02-0 40 wt pct, and strontium in the range of 0-165 p p m Tensile bars were ca

    Jan 1, 2004

  • CIM
    Modeling of Shales in Salt-Hydrocarbon Systems

    By M. R. Hudec, M. A. Nikolinakou, P. B. Flemings

    "We model the shale response to the large deformations associated with salt bodies, and we identify the implications of the stress changes for hydrocarbon exploration. We employ both the static and ev

    Jan 1, 2015

  • CIM
    The Influence of Shotcrete on Fluorspar Flotation and its Removal by Sensor Based Sorting

    By H. Wotruba, J. Heizmann

    "The use of shotcrete is a mandatory means for rock support and therefore for safety in many underground mining operations. If shotcrete gets into the flotation feed though, it can negatively influenc

    Jan 1, 2016

  • CIM
    History lessons

    By Robert B. Parsons

    "In this period of improved metal prices and reported profits, valuable lessons should be recalled from the 1970s when a similar cycle lured the federal and provincial governments into thinking that t

    Jan 1, 1989

  • CIM
    The Uncertainty Modeling Process

    By Jason Mewis

    Jason Mewis is the founder and president of ENGCOMP, a consulting engineering firm in Saskatoon Saskatchewan focusing on the mining sector. He has over 17 years of experience working on projects for t

    May 1, 2013

  • CIM
    Precious Metals in the Sudbury Ores and Their Recovery

    By C. Langer

    Although the existence of precious metals, particularly those of the platinum group, in the nickel ores in the Sudbury district has been known for a good many years- almost as long as the ore deposits

    Jan 1, 1927

  • CIM
    Analysis of Availability and Utilization of Dragline for Enhancement of Productivity in Surface Mines ? A Case Study

    By Mousa Mohammadi

    Due to operational advantage of dragline in simultaneous excavation and back-filling, the equipment has gained vast importance in open-pit mining. Besides, absence of auxiliary haulage units and a myr

    Aug 1, 2013

  • CIM
    Laboratory Investigation of Hydraulic Fracture Growth through Weak Discontinuities with Active Ultrasound Monitoring

    By James Kear, Romain Prioul, Robert G. Jeffrey, Andrew P. Bunger, Dimitry Chuprakov

    "Unconventional gas and geothermal reservoirs are typically naturally fractured and therefore the challenging problem of hydraulic fracture (HF) growth through naturally fractured rocks is an importan

    Jan 1, 2015

  • CIM
    Understanding Single Particle Breakage Event to Evaluate the Effect of Applied Strain Rate

    By Fatemeh Saeidi, Luis Marcelo Tavares, Malcolm Powell, Mohsen Yahyaei

    "Understanding a single breakage mechanism is fundamental to the development of breakage testing techniques appropriate for mechanistic modelling of any breakage equipment. In the light of this insigh

    Jan 1, 2016

  • CIM
    Application of Advanced Directional Drilling and Artificial Permeability Creation for In-Situ Recovery of Minerals

    By K. R. Brown, P. L. Krawchuk

    In-situ recovery (ISR) is under increased investigation as a viable methodology for the extraction of minerals in ore bodies that may be uneconomic to mine by traditional methods or for resources situ

    Jan 1, 2019

  • CIM
    Volcanogenic massive sulphide deposits of the Noranda Cauldron and Shield Volcano, Quebec

    By Harold L. Gibson, David H. Watkinson

    "Volcanogenic massive sulphide deposits of the Noranda Camp cur throughout the Noranda Shield Volcano but are concentrated and along the margins of the Noranda Cauldron. The deposits are realized alon

    Jan 1, 1990

  • CIM
    The Mount Polley alkalic porphyry copper-gold deposit, south-central British Columbia

    By D. Gorc, T. M. Fraser, Z. T. Nikic, R. Pesalj

    "Mount Polley is an alkalic porphyry copper-gold deposit of Lower Jurassic age within the Quesnel terrane in south-central British Columbia. The silica-saturated Mount Polley intmsive complex is assum

    Jan 1, 1995

  • CIM
    Kennecott Utah Copper Smelter Rebuild Over 11 Million Tonnes of Concentrate Smelted

    By D. Janney

    Kennecott's Utah Smelter commenced operations in June 1995 utilizing Outokumpu Flash Smelting (FSF) and Kennecott-Outokumpu Flash Converting (FCF) technology. After some initial teething and equi

    Jan 1, 2007

  • CIM
    Application of Ultra-Wide Band (UWB) Radar in Detecting Unexpected Utility Lines in Open Cut Operations

    By J. Zou

    Open-cut method is most widely used for shallow utility lines installation. In urban areas, unexpected utility lines buried underground potentially turn open-cut construction into a highly risky opera

    Aug 1, 2013

  • CIM
    Along-channel water and thermal management for PEMFCs

    Proper water and thermal management is essential for obtaining high performance of Proton Exchange Membrane Fuel Cells (PEMFCs). A steady, two-dimensional water and thermal management model was develo

    Jan 1, 2005