Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mineral Sands Resource Security – Underpinning Market Share in a Global Growth Context

    By R Kjar

    Globally, it is anticipated that the mineral sands industry will enter a period of short supply. Demand for both titanium dioxide and zircon is forecast to continue increasing, with new projects neede

    Oct 5, 2011

  • AUSIMM
    Characterisation of In Situ Gold Particle Size and Distribution for Sampling Protocol Optimisation

    By I M. Platten, Y Xie

    Sampling protocols that are designed to suit the mineralisation style will result in a reduction of the nugget effect and hence resource risk. The a priori need for all sampling programs is the effect

    Jan 1, 2008

  • AUSIMM
    Elaine Dorothy Cu-Au (REE-U) Skarn Deposit

    By P Sha

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Elaine Dorothy Cu-Au (REE-U) skarn deposit in the Mt Isa Inlier, Queensland, Australia

    Mar 18, 2015

  • AUSIMM
    Development of a new beneficiation plant for recovery of iron and apatite concentrates through wet tailing dams

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    With the declining of high-quality hematite and magnetite iron ore reserves and the increasing accumulation of material resulting from mining and beneficiation operations that appear as lowquality dep

    Aug 24, 2022

  • AUSIMM
    Bulk Low-Grade Mining at Mount Charlotte Mine

    By M F. Lee

    Although the Mt Charlotte gold resource was discovered in 1893, it was only in 1954 that geologists correctly interpreted drill data and defined a large low-grade orebody. The mine has been a large, l

    Jan 1, 2000

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    Efficiency improvement of Jalal Abad beneficiation plant by concentrate quality enhancement and tailings recovery

    By M Lak, R Amiri, A Haratian, M Asghari, S Haji

    In recent years, due to advances in designing of various magnet assemblies, a wide range of magnetic materials with different properties can be concentrated. Jalal Abad iron ore beneficiation plant, w

    Nov 8, 2021

  • AUSIMM
    Directional Blasting Rock Cutting Technology

    By W Z. Liu, Q Q. Shi, H T. Yang, X L. Zhang

    In order to improve the cutting blasting effect of dimension stone mining, the water coupling directional cutting blasting technology was put forward. Based on the test apparatus and special charge co

    Aug 24, 2015

  • AUSIMM
    Characterisation of Gold Ores by X-Ray Computed Tomography – Part 2: Applications to the Determination of Gold Particle Size and Distribution

    By S C. Dominy

    For any gold deposit-based geometallurgical study, the collection and processing of representative samples for gold grade and recovery tests is critical. Sampling protocols should be designed to suit

    Sep 5, 2011

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
  • AUSIMM
    Rock Texture and BWi Relationships, El Teniente Ore Deposit, Chile

    By M Oyarzún

    Direct relationships between rock texture and BWi (grindability index) have been established based on geological and metallurgical information supported by optical microscopy observations, gathered fr

    Sep 5, 2011

  • AUSIMM
    Support structure design for rock burst damage restraint initiated by a low-intensity seismic wave

    By E Kabwe, M Karakus

    Deep hard rock underground mines tend to experience high stress as such drives exhibit dynamic responses attributed to a rock burst variant (strainburst). This dynamic behaviour is difficult to predic

    Nov 29, 2022

  • AUSIMM
    Quantifying the energy efficiency transformation at Cadia due to HPGR crushing

    By J Seppelt, G S. Lane, E Wang

    Newcrest’s Cadia concentrator operated from 1998 to 2012 with a traditional SABC grinding circuit treating Cadia open pit ore. The Cadia comminution circuit was well characterised through surveys and

    Aug 29, 2018

  • AUSIMM
    A Practical and Rigorous Approach for Integrating Sustainability Principles into Decision-Making Processes at Minerals Processing Operations

    By D Tuazon, M Powell, M Ziemski, G D. Corder

    Although mining companies have made broad corporate-level commitments to adopt sustainability, there continue to be problems when attempts are made to adopt higher-level sustainability aspirations and

    Jul 10, 2012

  • AUSIMM
    School of Mines ù Past, Present and Future

    Although the mining of metals was well established by the time of the Roman Empire mining skills did not really advance greatly for many centuries. Miners did not have the scientific knowledge to dist

    Jan 1, 2002

  • AUSIMM
    Hydraulic Fracturing as a Cave Inducement Technique at Northparkes Mines

    By R G. Jeffrey

    The Northparkes, Endeavour 26 orebody is a porphyry copperûgold deposit and comprises a moderately to well jointed rock mass characterised by gypsum veining, the intensity of which decreases with dept

    Jan 1, 2000

  • AUSIMM
    A Dynamic Ore Reserve Calculation and Accounting System for a Stratiform Orebody

    By Jaczkowski B

    The lower orebody (LOB) at Chingola Divi- sion of Nchanga Consolidated Copper Mines Limited (NCCM) accounts for approximately 30 per cent of the total copper production for the company. The uniform

    Jan 1, 1977

  • AUSIMM
    Selection of an Optimum Truck and Shovel Fleet Based on Effective Flat Haul and Capacity Constraint Modelling

    By P Hagan, S Campbell

    A study was undertaken using various methodologies to determine the optimum loading and hauling configuration for different haul routes at Callide Mine, a coal mine located in central Queensland. The

    Sep 18, 2012

  • AUSIMM
    Dewatering the Bowmans Trial Pit

    By Waterhouse J. D, Harris B. M

    This paper briefly describes the construction in 1979/80 of a 70m deep trial open pit coal mine near Bowmans S.A. and describes more fully the hydrogeological aspects of the exercise. The primary p

    Jan 1, 1981