A Case History of the Crusher Level Development at Henderson

The Australasian Institute of Mining and Metallurgy
K W. Keskimaki W D. Rech
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
10
File Size:
2584 KB
Publication Date:
Jan 1, 2000

Abstract

As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was nearly two kilometres beneath the surface, bringing all of the challenges of rock stress and heat that come with mining at these depths. Though many mines operate at these depths, the development of the infrastructure necessary to support a 36 000 tonne per day caving operation brought some unique challenges to the development mining activity. The issues handled include: finding experienced staff for a æfast trackÆ development program; rock bursts and ground conditions; inflow of 50 degree centigrade water; acceleration of the project completion; large diameter raise boring and difficult muck handling.
Citation

APA: K W. Keskimaki W D. Rech  (2000)  A Case History of the Crusher Level Development at Henderson

MLA: K W. Keskimaki W D. Rech A Case History of the Crusher Level Development at Henderson. The Australasian Institute of Mining and Metallurgy, 2000.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account