Search Documents

  • ISEE
    Case Examples of Sensor Coupling Effect on Blast Vibration Measurement and Charge Weight Scaling Plot

    By Gabsoo Kim, Rulin Yang, Dave Kay

    Blast vibration data, such as PPV are usually scattered. In many cases, plots of PPV versus the charge weight scaled distance are so scattered that useful trends from different blast designs cannot be

    Jan 1, 2014

  • AUSIMM
    Petrographic Evidence Relating to Movement on the Thackaringa-Pinnacles Fault, Broken Hill District

    Although the pattern of metamorphic zones south of the Thackaringa-Pinnacles Fault is much obscured by polymetamorphism, displacement of the orthopyroxene isograd by the fault agrees with the displace

    Jan 1, 1965

  • CIM
    An In-Plant Test of Sphalerite Flotation without Copper Activation

    By Q. Zhang, J. A. Finch

    "Sphalerite flotation in the absence of copper activation at moderately alkaline pH has been observed in laboratory studies. An in-plant test of this observation was conducted at Kidd Creek Mine LTD.

    Jan 1, 1992

  • AUSIMM
    Operating Experience with Gasification Plant, Morwell

    Yallourn brown coal and its characteristics have been the subject of innumerable papers and discussions. The Lurgi process adopted for the production of Towns gas by the gasification of brown coal has

    Jan 1, 1960

  • AUSIMM
    Trends in Mineral Dressing Research at Mount Morgan

    The purpose of this paper is to outline some aspects of the experimental worlr that has been carried out in the mineral dressing laboratory at M'ount. Morgan during recent years.The subject matte

    Jan 1, 1952

  • NIOSH
    IC 7355 Geophysical Abstracts 123 October-December 1945 - With An Index To Abstracts 120-123

    8186. Aquilina, C. Determinazioni relative di gravita eseguite nel 1939 (Relative Determinations of Gravity Made in 1939), Ric. Ingegn, Rome, vol. 10, 1942, pp, 6376. In 1939, the author made a sur

    Jan 1, 1946

  • CIM
    Enterprise Optimization Releasing Value Through Better Planning Decisions

    By Gerald Whittle

    What is Enterprise Optimization? Releasing value through better planning decisions: Philosophy, Methodology, Software The key to 5% -35% increase in enterprise value (NPV) The culmination of 25 yea

    May 1, 2010

  • NIOSH
    RI 9643 - Full-Scale Testing Of The Float Dust Deposition Meter

    By Robert A. Cortese, Henry E. Perlee

    Coal dust and float coal dust, produced during normal mining operations, in underground coal mines, are carried from the point of origin downstream by the ventilating air, where it deposits on the sur

    Jan 5, 1998

  • SME
    Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

    By J. Davies

    This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long

  • SME
    Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, Arizona

    By A. L. Williamson, G. Savci

    Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can

    Jan 1, 2002

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • NIOSH
    OFR-13-76 Development Of A Fluorescent Cap Lamp System ? 1.0 Introduction

    Prier to the date of this contract, Ocean Energy had developed and demonstrated a high efficiency fluorescent caplamp which operated from a standard 4 volt miner's caplamp battery. This unit prod

    Jan 1, 1975

  • AUSIMM
    Pressure Leaching of Thackaringa Cobalt-bearing Pyrite

    A massive cobalt-containing pyrite orebody occurs in banded albite-quartz-biotite rocks at Thackaringa, some 30 km SW of Broken Hill. Because of the world-wide shortage of cobalt during the late 1970s

    Jan 1, 1983

  • AUSIMM
    The Mining Licensing Regime - Current Developments

    By D A. Edmunds

    The most important development that has been taking place recently relating to mining operations in New Zealand would generally be regarded as being the Resource Management Law Reform. This has been w

    Jan 1, 1988

  • SME
    Brightwater Conveyance System Will Expand Seattle?s Wastewater Treatment

    By John E. Newby

    Washington?s King County is constructing a new regional wastewater treatment facility, called Brightwater, in response to growth in the greater Seattle region. Planning conducted in the late 1950s ide

    Jan 1, 2007

  • SAIMM
    On the surface noxious gas emissions from old iron mines

    By D. Grabowski, Z. Pokryszka

    A study carried out in the iron basin of Lorraine (North-East of France) highlighted the existence of under-oxygenated and noxious gas emissions (carbon dioxide, radon…) in vast built-up areas related

    Jan 1, 2003

  • AUSIMM
    Planning Disposal of Mine Wastes in New Zealand

    The main factors which influence disposal of mine waste under New Zealand conditions are identified and discussed: namely, geological conditions which produce soft weather-sensitive waste, wet and col

    Jan 1, 1986

  • AUSIMM
    The Blackwater Mine at Waiuta - Exploration Options

    The Reefton Goldfield on the West Coast of the South Island of New Zealand was a significant gold producing area between 1860 and 1951. During this period it produced approximately 2.1 million ounces

    Jan 1, 1992

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • ISEE
    Blast Assessment and Optimization with Respect to the Control of Environmental Effects

    By Frank Sames

    The control of the environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations

    Jan 1, 1997