Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Subsidence Prediction Influence Assessment and Damage Control

    By Y. Luo

    An extensive subsidence research program conducted by the authors has greatly improved the accuracy and the capabilities of subsidence prediction under complicated mining and surface conditions. The t

    Jan 1, 1997

  • SME-ICGCM
    Analysis on the Dynamics of Mining Subsidence in Range of a Product Transmission Overhead Line

    By Axel Preusse

    A high advance rate of the longwall face increases inevitably the mining dynamics within the rock and on the surface. Measures to limit the mining dynamics are the adjustment of the face advance rate

    Jan 1, 2003

  • SME-ICGCM
    The Design of Room and Pillar Mining Systems in the UK

    By Graham Daws

    State of the Art Room and Pillar mining techniques have been employed at two coal mines in the UK in the last two years. This paper describes the design of pillars and rockbolted support systems for R

    Jan 1, 1998

  • SME-ICGCM
    Some Structural Aspects Of Designing The Shield Supports

    By S. S. Peng

    This paper presents a convenient way for the preliminary design of the shield supports. The locus equations which are applicable for all kids of shield supports are derived. These equations facilitate

    Jan 1, 1982

  • SME-ICGCM
    Stability And Control Of Immediate Roof Of Fully Mechanized Coal Face

    By S. Y. Liu

    Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t

    Jan 1, 1990

  • SME-ICGCM
    Application Of Seismic Tomography For Assessing Yield Pillar Stress Conditions

    By Michael J. Friedel

    The fundamental problems associated with ground control reflect the inability of mining personnel to "see" the development of anomalous conditions. Toward this end, the U. S. Bureau of Mines is invest

    Jan 1, 1993

  • SME-ICGCM
    Some Technical Considerations When Mining Under Bodies Of Water

    By John W. Fredland

    Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun

    Jan 1, 1982

  • SME-ICGCM
    Hazard Mapping Combining Geostatistical Modeling Of Coal Mine Roof Quality Ratings With Numerical Modeling Of Stress Data

    By J. Riefenberg

    U.S. Bureau of Mines (USBM) researchers are developing a personal computer-based hazard mapping system for use in underground coal mines. Hazard mapping is rapidly gaining interest as delineating area

    Jan 1, 1994

  • SME-ICGCM
    A Case Study of Bolt Performance in a Two-entry Gateroad

    By Stephen P. Signer

    This paper presents the results of a case study conducted in a two-entry gateroad in a coal mine where excessive roof deformation and bolt loading resulted in failure of many roof supports. The instru

    Jan 1, 1998

  • SME-ICGCM
    Pillar Design - Continuous Miner Butt Section And Longwall Development Sections

    By Lawrence R. Artler

    The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"

    Jan 1, 1984

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    Influence of Structural Stress Concentration and Structural Irregularity on Longwall Gateroad Roof Control

    By Daniel Su

    Following several roof falls in the E3 longwall development of a Consol Pennsylvania Coal Company underground coal mine, an underground roof geology reconnaissance program consisting of twenty-nine 20

    Jan 1, 2002

  • SME-ICGCM
    A Practical and Efficient Steel King Beam Structure Design Methodology at Slope Bottom Intersections

    By Stankusm John C., Xiaoting Li

    "Quantitatively identifying the load on a steel king beam set is a complicated issue in designing the king beam structure at the slope bottom area. From an engineering perspective, understanding the n

    Jan 1, 2018

  • SME-ICGCM
    Mine Panel Collapse - Two Case Studies

    By Hanjie Chen

    A mine panel collapse may occur when pillar sizes are too small or the surrounding rock strata (roof or floor) yields. After a small pillar fails, its loading is rapidly transferred to adjacent pillar

    Jan 1, 1999

  • SME-ICGCM
    Polymer Membrane Liners In Underground Coal Mines - Ground Control For The Millenium?

    By David C. Laurence

    in March 1999, the School of Mining Engineering at the University of New South Wales carried out a series of underground trials using " Evermine", a South African developed two-part water based polyme

    Jan 1, 2000

  • SME-ICGCM
    Development Of Stress Measurement Techniques In Bump-Prone Coal For Safety Decisions

    By Eric G. Zahl

    Researchers at the Spokane Research Laboratory of the National institute for Occupational Safety and health are evaluating stress and displacement measurements in a longwall coal mine. The objective i

    Jan 1, 2000

  • SME-ICGCM
    Evaluation Of Surface Subsidence Potential Along A Pipeline Due To Abandoned Coal Mine Works

    By Thomas L. Vandergrift

    With the inevitable expansion of homes, businesses, and infrastructure in coal mining regions, the potential for future subsidence above abandoned mines is of increasing concern. Of particular concern

    Jan 1, 2000

  • SME-ICGCM
    Pillar Design In Bump-Prone Deep Western U.S. Coal Mines (e849bf38-924c-4a19-8729-5910f69616a3)

    By N. P. Kripakov

    This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north-central Utah coalfiel

    Jan 1, 1992

  • SME-ICGCM
    Calculating the Mining-Induced Horizontal Deformation Indices

    By Krzysztof Tajdus

    In Europe, horizontal strain is a primary parameter for estimating building hazard resistance. Other measured indices, like curvature, are less important, since in most cases of European excavation de

    Jan 1, 2011

  • SME-ICGCM
    Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method

    By Hideki Shimada

    A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages

    Jan 1, 2001