Monitoring Auger Cast in Place Pile Construction and Testing in Hard Clay (c1a730a8-7e87-4cd7-85b2-336e4f7995da)By Onur Guvener, Kalaiarasi Vembu, C. Vipulanandan
"Installation procedure and the quality of the material used in the construction have significant effects on the behavior of the Auger Cast in Place (ACIP) piles. In this study, Installation and curin
Jan 1, 2017
-
A Soil Quake Davisson Offset Method For Drilled FoundationsBy Michael Perlow Jr
A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall BuildingBy Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016
-
Alternative Binder For Ground Improvement To Reduce Co2 FootprintBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
The Sandbukta-Moss-Såstad (SMS) project is a part of the Intercity development project, which is part of the largest transport project in Norway, consisting of 270 km of new double-track rail. The SMS
May 1, 2022
-
High Capacity Hollow Core Bar PilesBy Lawrence F. Johnsen, Felix Ferrer, Dino Tomasetti, Cassandra A. Wetzel
"A 17 story building was constructed at the Brooklyn Navy Yard on a site with a long history of development. Most recently the site supported a dewatering well and craneway to service two adjacent dry
Jan 1, 2017
-
A Case Study, Design Change from Spread Footing to Drilled ShaftsBy Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal
"This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi
Jan 1, 2016
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical IslandBy Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Use Of Geospatial Project Information Management Systems On Diaphragm And Secant Pile WallsBy Andrew Higgins, Jamey Rosen
This presentation will demonstrate some recent advancements in the applications of Project Information Systems (PIMS) technology to seepage barrier walls in the context of evolving Owner Specification
May 1, 2022
-
Innovative Micropile Retrofi t of an Existing StructureBy Kenneth R. Chadwick, Thomas J. Tuozzolo, Terence P. Holman
"Micropiles are often installed to retrofit existing foundations that experience distortion and to underpin structures prior to future construction. The Dublin Road Pump Station project is an example
Jan 1, 2008
-
Ground Improvement Using Stone Columns To Mitigate Liquefaction, Reduce Settlements And To Increase Safe Bearing Capacity Of In-Situ Soils – A Case StudyBy Venkata Krishnaiah Yeddala, Sai Vivek Adari, Suresh Kumar Velugu
Assam cancer care foundation (ACCF) proposed the construction of hospitals and related facilities across 18 locations in the state of Assam-India. Tezpur is one among the 18 locations of Assam with hi
Nov 1, 2022
-
Design Build of the New NY Bridge FoundationsBy Leykam Chris J., Jacobs Scott. A.
"Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze
Jan 1, 2016
-
Comparison Of Large Plate Load Test Result With Predicted Deformation In Deep Vibro Techniques Treated Ground For Iron Ore Stockpile Yard In VietnamBy Leong, William. Chong, Kam Weng
Deep Vibro Techniques namely Vibro Compaction (VC) and Vibro Replacement (VR) are widely used in ground improvement to densify sands and strengthen cohesive soils. This paper describes the application
Nov 1, 2022
-
Metro Rome Line “C” - Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni - Line “A”By Giulia M. B., Ferruccio Cribari, Alessandro Bertero, Eliano Romani, Roberto Sorge, Francesca Casini
"The use of Artificial Ground Freezing (AGF) to form earth support and seepage control barrier systems has had applications worldwide. These cover a variety of construction problems, including the for
Jan 1, 2016
-
Installation of Secant Pile Wall in Rock Adjacent to Fragile BuildingBy Chu E. Ho, Alfredas Daugiala, Nicola Ebanks
"The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr
Jan 1, 2016
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New ConstructionBy Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off WallBy Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney
"Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly
Jan 1, 2017
-
130 M Deep Bored Piles – A New SuperlativeBy Vijay Kumar, Serhat Baycan, Karsten Beckhans
For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep
Nov 1, 2022
-
State-of-the-Art Rock Socket Analysis and Design for Laterally Loaded Drilled ShaftsBy Aly Mohammad, Dongyi Yue
"The design of rock sockets for drilled shafts and piles proves to be a challenge for the Design Engineer. The magnitude of loads on the shaft and the behavior of the rock are critical in determining
Jan 1, 2005
-
Sustainable Products For Geotechnical WorksBy Marcus Daubner, Karsten Beckhaus, Florian Bauer
The construction industry can and needs to contribute to a more sustainable world. Accordingly, geotechnical works potentially have a significant share. In this context, Bauer understands “sustainable
May 1, 2022