    United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And Communication

    By Giovanni A. Bonita

    The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir

    Jan 1, 2006

  • DFI
    The Effect Of Vertical Pile Loading On Subsequent Lateral Behaviour

    By A. Lyndon

    Vertical and lateral load tests were carried out on two 13 m deep bored cast-in-place instrumented piles, socketed into weathered sandstone. The first pile, 1200 mm in diameter, was loaded vertically

    Jan 1, 1989

  • DFI
    Fundamental Tests On The Performance Of High Capacity Pin PilesSM

    By Donald A. Bruce

    Pin Piles are small diameter, bored, cast-in-place piles used to underpin structures. They were first employed over 40 years ago in Italy, and have been used in the U.S. since the late 1970's. Ho

    Jan 1, 1993

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • DFI
    Case Histories, Part 2 - Etudes De Cas, Partie 2 - Gallery Towers, Melbourne: Successful Approach To Difficult Piling Contract Management

    By Mario Aiezza

    This paper outlines the results of a relationship developed during the design and construction of the foundations for the Gallery Towers project in Melbourne. Both the builder and the piling contracto

    Jan 1, 2002

  • DFI
    Temporary Secant Wall For A Subway Rehabilitation Project In An Urban Environment

    By Vincent Tirolo

    Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre

    Jan 1, 2003

  • DFI
    The World In Steel Sheet Piling ? Synopsis

    By M. Dondelinger

    This paper presents a comprehensive review of steel sheet piling including internationally manufactured hot rolled sections, their history, applications, installation and driving techniques. The di

    Jan 1, 2010

  • DFI
    Three Case Histories Comparing Impact And Vibratory Driven Pile Resistances In Marl

    By Gregory J. Canivan

    Three test pile programs were conducted in Charleston, South Carolina to evaluate differences in bearing resistance due to installation methods. The tested piles were installed with impact hammers and

    Jan 1, 2002

  • DFI
    Sand Compaction Piles ? Synopsis

    By A. Holeyman

    The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ

    Jan 1, 2010

  • DFI
    Uplift Capacity Of Drilled Piers In Clay - Synopsis

    By Braja M. Das

    Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat

    Jan 1, 1987

  • DFI
    Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile System

    By Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer

    "The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of

    Jan 1, 2017

  • DFI
    The Use Of Stone Columns On Settlement And Liquefaction Susceptible Soils

    By Ivan Jackson Madura

    The new Paradisus Coco Beach Resort in Rio Grande (PR) is located on an old swamp area, which has been filled with relatively clean to silty sands. The swampy deposits consists of organic silts, peat

    Jan 1, 2002

  • DFI
    Technical Visit

    By the courtesy of Metropolitana Milanese (Milan Underground), roost of the delegates visited on April 12, 1991 the tunnel of "PORTA VENEZIA" STATION of MILANO RAILWAY LINK. The "PORTA VENEZIA" ST

    Jan 1, 1994

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • DFI
    Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation

    By Guan Jichang

    An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t

    Jan 1, 1991

  • DFI
    Bored Piles With Base Preloading By Grouting - The Polish Experience

    By Bolestaw A. Ktosihski

    Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr

    Jan 1, 2006

  • DFI
    Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case History

    By R. Heath Forbes

    The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted

    Jan 1, 2011

  • DFI
    Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985

    By Donald J. Murphy

    Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in

    Jan 1, 1986