Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building SupportBy Scott M. Doehla
A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of
Jan 1, 2008
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Soil Mixing Treatment of Marginal Soil for Railway Construction and MaintenanceBy Charles M. Wilk
"Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o
Jan 1, 2017
-
Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to InundationBy Adel M. Hanna, Ibrahim M. Mashhour
"Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou
Jan 1, 2015
-
Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?By Franz-Werner Gerressen, Manfred Schoepf
"Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,
Jan 1, 2015
-
Session 22 "Compaction Grouting and Limited Mobility Grouting"By Allen Cadden
The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n
Feb 10, 2003
-
Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile SpliceBy John C. Ryan
The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa
Jan 1, 2010
-
Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown MicropilesBy M. Meckkey El Sharnouby
In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und
Jan 1, 2011
-
Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)By George Piscsalko
Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,
-
Effects of Installation Parameters of Drilled Displacement Piles on In Situ Stress Conditions in Stiff ClaysBy Alexander Scheuermann, Martin D. Larisch, David J. Williams
"Drilled displacement piles (DDP) have been used around the world for decades as foundation elements for structures and embankments. Typically the pile toes are designed to penetrate into stiff or den
Jan 1, 1900
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable SoilsBy Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain
"An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i
Jan 1, 2015
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005
-
Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - SynopsisBy William F. Loftus
When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea
Jan 1, 1996
-
A Proposal For Construction Of The Pile Load-Settlement Curve Based On Results Of Cone Penetration Tests ? SynopsisBy A. Tejchman
On the site of building of a new flyover founded on piles the comprehensive "in situ" investigations were carried out. The subsoil conditions under each of 15 supports were very differentiated. Using
Jan 1, 2010
-
Some Experiences In Construction And Design Of Stone Column Reinforced Ground ? SynopsisBy C. W. Sheng
In this paper conventional construction procedure is briefly described for the installation of stone columns in soft ground in China. A viewpoint concerning the mechanism of ground improvement by use
Jan 1, 2010
-
Pier Design And Construction In Water Bearing Soils ? SynopsisBy C. N. Baker
The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig
Jan 1, 2010
-
Behaviour Of Model Pile Group Under Axial Monotonic LoadingBy A. Le Kouby
We present in this paper the results of a parametric study carried out in a calibration chamber on instrumented model piles. The aim is to point out group effect on piles within a group through their
Jan 1, 2006