Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The FHWA Geotechnical Program for 2017

    "Every year during the Transportation Research Board (TRB) Annual Meeting in Washington D.C., the Federal Highway Administration (FHWA) National Geotechnical Team (NGT) takes time to talk about what w

    Jan 1, 2017

  • DFI
    An Investigation Of Pile Foundations Installed During The Late 19th And Early 20th Century For Re-Use In Building Support

    By Scott M. Doehla

    A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of

    Jan 1, 2008

  • DFI
    Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - Introduction

    By Joram M. Amir

    During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital

    Jan 1, 1999

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017

  • DFI
    Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance

    By Charles M. Wilk

    "Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o

    Jan 1, 2017

  • DFI
    Experimental Investigation on Drag Load Acting on Single End-bearing Piles in Collapsible Soil due to Inundation

    By Adel M. Hanna, Ibrahim M. Mashhour

    "Collapsible soil is known as one of the difficult soils, which possesses considerable strength when it is dry and significantly reduced when inundated. In practice, in case of a thick layer, pile fou

    Jan 1, 2015

  • DFI
    Diaphragm Walls for Infrastructure Projects how to Deal with Complex Demands?

    By Franz-Werner Gerressen, Manfred Schoepf

    "Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. It can be anticipated that,

    Jan 1, 2015

  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003

  • DFI
    Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile Splice

    By John C. Ryan

    The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa

    Jan 1, 2010

  • DFI
    Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown Micropiles

    By M. Meckkey El Sharnouby

    In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und

    Jan 1, 2011

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles (6922d0e7-932e-4be1-a810-c6fa95777bc9)

    By George Piscsalko

    Quality control of drilled shafts and ACIP piles is greatly dependent upon the practices of the site personnel. In many applications it is difficult to properly inspect the shaft prior to concreting,

  • DFI
    Effects of Installation Parameters of Drilled Displacement Piles on In Situ Stress Conditions in Stiff Clays

    By Alexander Scheuermann, Martin D. Larisch, David J. Williams

    "Drilled displacement piles (DDP) have been used around the world for decades as foundation elements for structures and embankments. Typically the pile toes are designed to penetrate into stiff or den

    Jan 1, 1900

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • DFI
    New Ground Freeze Method for Groundwater Cutoff below Foundation Excavations in Permeable Soils

    By Daniel W. Mageau, Larry W. Applegate, Aaron K. McCain

    "An innovative method of ground freezing was successfully tested to create a “dry” excavation condition for a new building foundation at a site in downtown, Miami, Florida. The subsurface conditions i

    Jan 1, 2015

  • DFI
    Secant Pile Walls - A Consistent Approach to Risk Management

    By Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling

    "Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn

    Jan 1, 2005

  • DFI
    Innovative Methods Of Dealing With Contaminated Soils In Drilled Shafts - Synopsis

    By William F. Loftus

    When high capacity diameter pipe piles are driven open-ended into the underlying bedrock, the material gathered inside the pipe often must be excavated to allow concrete to be placed within, in a clea

    Jan 1, 1996

  • DFI
    A Proposal For Construction Of The Pile Load-Settlement Curve Based On Results Of Cone Penetration Tests ? Synopsis

    By A. Tejchman

    On the site of building of a new flyover founded on piles the comprehensive "in situ" investigations were carried out. The subsoil conditions under each of 15 supports were very differentiated. Using

    Jan 1, 2010

  • DFI
    Some Experiences In Construction And Design Of Stone Column Reinforced Ground ? Synopsis

    By C. W. Sheng

    In this paper conventional construction procedure is briefly described for the installation of stone columns in soft ground in China. A viewpoint concerning the mechanism of ground improvement by use

    Jan 1, 2010

  • DFI
    Pier Design And Construction In Water Bearing Soils ? Synopsis

    By C. N. Baker

    The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig

    Jan 1, 2010