Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Bureau of Mines Diesel Research Highlights

    The goal of the Bureau of Mines, U. S. De- partment of the Interior, diesel engine research program is to reduce exhaust emissions and mini- mize the risk of fires and explosions caused by the use o

    Jan 1, 1988

  • AUSIMM
    The Mineral Equation

    It is my pleasure to deliver the first Keynote Address to the first joint conference between The Australasian Institute of Mining and- Metallurgy and The American Institute of Mining, Metallur- gic

    Jan 1, 1978

  • AUSIMM
    Piercement Structures Formed by Metamorphic Mobilisation of the Broken Hill Orebody

    The interfaces between the Broken Hill ore lenses and the enclosing wallrocks are, on a broad scale, parallel to metamorphic layering in the wallrock gneisses and quartzites. In detail, however, the c

    Jan 1, 1976

  • AUSIMM
    Strata Movement Associated WIH Longwall Mining

    By Hughson B

    A multi-wire borehole instrumentation system was used to monitor strata movement caused by a retreating longwall face at the Ellalong Colliery, situated in the Lower Hunter Valley in New South Wal

    Jan 1, 1987

  • AUSIMM
    Crushing and Screening Operations at Bougainville Copper Limited

    By Koginmo V. I

    The concentrator at Bougainville Copper Limited has an annual throughput of 48.2 million tonnes/year producing approximately 175,000 tonnes copper, 16.1 tonnes gold, and 50 tonnes silver. Convention

    Jan 1, 1988

  • AUSIMM
    Understanding the Kegold Electrode

    By Wright D. C

    The operation of the cyanide-sensitive Mintek/TB1 kegold electrode was studied in the laboratory, with regard to equilibration time and drift, the effects of pH, stirring, salinity, dissolved oxygen

    Jan 1, 1996

  • AUSIMM
    Towards a Solid Waste Disposal Strategy: The Rundle Oil Shale Project

    By Cutler JL

    At the present stage of the Rundle oil shale project planning, with depressed world oil prices, early development of the resource is unlikely. However, this postponement is being used to carry out

    Jan 1, 1987

  • AUSIMM
    Performance of Electrodes Containing Brown Coal Char in Alumina Reduction

    By Graham JW, Cullen GV

    edicted increase in, Aluminium production and the possibility of a diminishing supply of petroleum coke for anode electrodes in alumina reduction cells makes it desirable to find alternative electrode

    Jan 1, 1970

  • AUSIMM
    Charging Patterns, Size Distribution and Velocity Profiles in a Stock Column

    By Nightingale RJ

    A column (50 cm 4) provided with a bell charging mechanism and a rectangular perspex insert was used to investigate the inter-relationship between charging pattern, size analysis and velocity profile

    Jan 1, 1975

  • AUSIMM
    Feasibility of Narrow Vein Mining Using a Mechanical Rock Splitter

    By S Planeta

    The use of explosives in underground mining has its drawbacks, particularly in the case of thin or narrow vein type deposits. Due to that, there is a need to develop more discriminative and safe rock-

    Jan 1, 2003

  • AUSIMM
    Blasthole Diameter and its Effect on Explosive Distribution

    A good blasting result is largely achieved by putting the right amount of explosive in the right place and firing it in the right sequence. The best blast design in the world will not break the roc

    Jan 1, 1990

  • AUSIMM
    Recent Improvements to Operations and Control of Pasminco Metals - BHAS Zinc Plant

    By Nolan D. P, Balales M

    Over the last two years work has been undertaken within the Pasminco Metals - BHAS Zinc Plant to improve the efficiency and maintain the production capacity of the operation. The work has centred up

    Jan 1, 1993

  • AUSIMM
    Stratigraphy and Mineralisation of the Upper Paleozoic Rocks, East Nelson

    Permian ultramafic and associated rocks form a belt in East Nelson and contain widespread, but minor, chromite and copper mineralisation and some mining was carried out last century. Since mining ceas

    Jan 1, 1977

  • AUSIMM
    The Mineralogy of Platinum Group Elements in Ophiolite Peridotite, New Caledonia

    In the Massif du Sud ophiolite complex platinum group elements occur predominantly as ultrafine-grained inclusions of rutheniridosmine, laurite and iridosmine. These form primary inclusions less th

    Jan 1, 1989

  • AUSIMM
    A Modular Expert System for Diagnosis of Vehicles with Diesel Hydraulic Drive Components Used in the Mining Industry

    By Streichfuss M, KeBler H-W, Burgwinkel P

    This paper describes the design of an expert system used as a part of a diagnostic system for diesel hydraulic drives. A PC-based diagnostic system ruDi (KeBler and Burgwinkel, 1993) was developed t

    Jan 1, 1995

  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • AUSIMM
    Simulation of Mine Fires

    By Trutwin W, Tracz J

    The outbreak of open fires underground cause disturbances to the conditions of the mine ventilation process. Thermal and chemical effects due to fire create unsteady, transient states in airflow a

    Jan 1, 1988

  • AUSIMM
    Viscosity Model in the Al<sub>2</sub>O<sub>3</sub>-CaO-æFeOÆ-SiO<sub>2</sub> System

    By E Jak

    A viscosity model has been developed for both completely liquid and heterogeneous, partly crystallised slags in the Al2O3-CaO-æFeOÆ-SiO2 system in equilibrium with metallic iron. The Urbain formalism

    Jan 1, 2000

  • AUSIMM
    Mine Planning and Scheduling at Ranger Uranium Mine-Environmental Requirements and Economics

    Ranger Uranium Mines (RUM) operates an open cut located in the Top End of the North- ern Territory. Strict environmental controls govern all operations and the water management requirements have th

    Jan 1, 1984

  • AUSIMM
    A One Step Method to Mass Balance Data and Fit Screen Models

    By Whiten WJ

    A method that allows data to be mass balanced and screen models to be fitted in a single step is described. The inclusion of several variables to describe the feed data in the fitting procedure al

    Jan 1, 1984