Search Documents

  • SME
    Evaluation Of The Drum Friction Test For Determining The Fire Resistance Of Conveyor Belts

    By J. H. Rowland

    The Mine Improvement and New Emergency Response Act of 2006 (MINER Act) amended the Federal Mine Safety and Health Act of 1977 to improve the safety of mines. The MINER Act established a Technical Stu

    Jan 1, 2011

  • DFI
    History Of Chicago Foundation Systems & Underground Construction ? Summary

    By Theodore R. Maynard

    The history of foundation engineering in Chicago is a tale of innovation, made necessary in order to keep pace with structural technology which allowed taller buildings with heavier bearing loads, to

    Jan 1, 1991

  • AIME
    The Behavior Of Calcium Sulphate At Elevated Temperatures With Some Fluxes

    By H. 0. HOFMAN AND W. MOSTOWITSCH

    I. INTRODUCTION. THE mineral gypsum, CaSO, + 2 H2O, has been used for many years as a sulphurizing and basic flux in several smelting¬operations. Thus, in smelting oxide nickel-ore in the blast furna

    Jan 1, 1909

  • DFI
    I-470 Mine Remediation

    By Sheryl D. Gallagher

    The project consisted of filling an abandoned underground limestone mine to facilitate construction of a new entrance ramp to I-470 in Lee?s Summit, Missouri. Due to collapse of mined areas near the

    Jan 1, 2009

  • SME
    Development described for fluidized bed combustion at TVA’s 20-MW pilot plant

    By James W. Bass

    Introduction Atmospheric fluidized bed combustion (AFBC) is an improvement over coal-fired boiler design. It offers several advantages over conventional boilers. AFBC can meet sulfur and nitrogen oxi

    Jan 4, 1986

  • ISEE
    Geotechnical Influences on Blast Induced Stress Wave Propagation, Copper Cliffs, Ontario

    By Roger S. Jackson

    "This study interprets vibrations produced by single underground shots, recorded on surface by 135 digital seismographs laid out in four linear arrays. Several vibration anomalies were observed and ar

    Jan 1, 2010

  • SME
    Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)

    By S. Ersayin

    In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im

    Jan 1, 2008

  • AUSIMM
    The Estimation of Gold and Tin Alluvials in Malaya

    The presence of gold or tin in a particular place in payable quantities may be suspected from geological and prospE;cting reports. It behoves the engineer by judiciously spaced boreholes or pits to es

    Jan 1, 1942

  • DFI
    Dynamic Stability Of An Axially Loaded Pile

    By S. S. Gajin

    The paper deals with parametric vibrations of an axially loaded pile. The dynamic model is derived by means of Hamilton's principle and reduced to a partial differen­tial equation with variable c

    Jan 1, 1989

  • DFI
    Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - Synopsis

    By A. R. Jambekar

    City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city

    Jan 1, 1996

  • CIM
    Effect of Environmental Conditions and Rock Properties on Adhesive Bond of Thin Spray-on Liners

    By Hasan Ozturk

    Laboratory testing examined the effect of a variety of intrinsic rock properties and environment conditions that influence the adhesive bond between rock and thin spray-on liners. The liner materials

    May 1, 2004

  • CIM
    Tendencies and Considerations for Energy Efficiency in Sag Mill Circuit Design from Recent Projects in Chile

    By C. Schuffeneger

    "The design of SAG milling circuits for mining projects requires the incorporation of the energy consumption considerations and the evaluation between different flexibility-adding options to absorb th

    Jan 1, 2012

  • SME
    Tunneling Safety -- Regulations And Rewards

    By Robert Vergie

    Like most of you, I would rather work on a job than talk about it. But it is fruitful to spend some time taking stock of important developments in the heavy construction field. One of the strongest

    Jan 1, 1974

  • CIM
    The Carbon Footprint of Grinding Media

    By Paul W. Shelley, Daniel J. Hodges

    The mining industry is undergoing a period of rapid transformative change.  This is the result of the social and financial accountabilities that the industry is faced with because of the world&rs

    May 4, 2025

  • SME
    Discussion - Lemniscate-guided powered roof supports adapted for proper operation with the roof on longwall faces (857baea3-2787-49de-993d-00b3908db795)

    By J. B. Gwiazda

    S.S. Peng The highlights of this paper are : • The shield supports with lemniscate links will exert a tangential force on the roof strata, causing unnecessary and harmful roof movements, thus dama

    Jan 12, 1986

  • DFI
    Secant Pile Walls - Design, Construction And Case History

    By Ketan H. Trivedi

    This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install

    Jan 1, 2006

  • SME
    Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs Extension

    By Mitchell L. Fong

    The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • CIM
    Improving Raisebore Stability Assessments and Risk

    By B. M. Coombes

    The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past

    May 1, 2011

  • AUSIMM
    Sub-Level Open Store Design on Northern Rhodesian Copperbelt

    The paper is a general review of practice in design of sub-level open stopes in Northern Rhodesian copper mines and gives examples of some interesting developments during the last five or six years. I