This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile installation, plan alignment and verticality tolerance, methods of drilling (auger, wash boring, cased and open holes), lateral bracing for secant piles, cutting of keys in secant pile walls for the connection of permanent floor slabs, sealing of water leaks and waterproofing. The paper concludes with a brief case history of a secant pile wall project recently constructed in New York City.