Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Delineation Of Abandoned Workings With An In-Seam Seismic Method

    By I. Geldmacher

    In-Seam Seismic (ISS) methods have been used extensively worldwide for the past 10 years to assist mine planning, espe¬cially longwall mining in coal seams. The technique is only starting to gain wide

    Jan 1, 1990

  • SME-ICGCM
    Numerical Modeling as a Tool to Predict Pillar Condition and Assist in Mining Sequencing

    By P. Palmer

    Using 3D numerical modeling as a tool to predict rock behavior during mining extraction is still an uncommon practice at many underground operations. This paper will discuss how 3D numerical models we

    Jan 1, 2005

  • SME-ICGCM
    Quality Management For Grouted Rockbolts

    By Dieter Wittenberg

    The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n

    Jan 1, 2000

  • SME-ICGCM
    Rockbolting For Highly Stressed Roadways

    By Holger Witthaus

    The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m

    Jan 1, 2000

  • SME-ICGCM
    Investigation Into Abnormal Surface Subsidence Above a Longwall Panel in the Southern Coalfield, Australia

    By Winton J. Gale

    The subsidence over a longwall panel at Tahmoor Mine in the Southern Coalfield of NSW, Australia, was found to be approximately twice the size it had been in previous measurements. An investigation in

    Jan 1, 2011

  • SME-ICGCM
    Pillarless Longwall Mining For Multiple Seams

    By Victor V. Nazimko

    Longwall mining technology without interpanel pillars is feasible from a geomechanical point of view. A set of pillarless longwall layouts are proposed including tailentry pillar recovery, headentry p

    Jan 1, 1994

  • SME-ICGCM
    Three Dimensional Numerical Modelling Of Effects Of Subsidence On Escarpments

    By Leigh J. Wardle

    Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri

    Jan 1, 1992

  • SME-ICGCM
    Control Technology For Roof Drill Operators

    By Bob Thomas

    The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont

    Jan 1, 1999

  • SME-ICGCM
    A Method for Quantitative Void/Fracture Detection and Estimation of Rock Strength for Underground Mine Roof

    By Syd Peng

    In designing a proper roof support system, one must know the features of roof geology in advance of mining. The drilling parameters obtained during normal roof bolt installation cycle can provide a l

    Jan 1, 2005

  • SME-ICGCM
    Detailed Underground Measurements Of Roof Deflection And Bed Separation

    By André Vervoort

    To learn more about the fundamental roof behaviour in South African coal mines, accurate underground measurements of roof deflection were conducted in bord and pillar panels during development and pil

    Jan 1, 1992

  • SME-ICGCM
    A New Method For Longwall Pillar Design

    By P. Tsang

    In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed

    Jan 1, 1993

  • SME-ICGCM
    Influence of a Coal Mine Subsidence on An Adjacent Dam

    By Nengxiong Xu

    The WTZ coal mine is located adjacent to an auxiliary dam in P. R. China. The mining-induced ground movements are calculated using a 3-D numerical procedure based on the finite difference method (FDM)

    Jan 1, 2013

  • SME-ICGCM
    Development of a Numerical Model for the Approximation of Stress Distribution for a Single Vertical Backfilled Stope

    By Christopher Newman, Zach Agioutantis, Gabriel S. Esterhuizen

    "As conventional underground deposits are continuing to be depleted, mining operations have been forced to produce at greater depths and in more geologically and geometrically challenging conditions.

    Jan 1, 2018

  • SME-ICGCM
    Considerations for Effective Ground Support in Evaporites

    By C. A. Vining, J. R. Nopola

    "Evaporites, such as salt and potash, pose unique problems to ground-support designs not encountered in other rock types. Evaporites are subject to continual creep and no amount of ground support can

    Jan 1, 2018

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    Remote Mining Using Water for Ground Support

    By Robert L. Schmidt

    The support of underground openings by water is a natural phenomenon. Surface sinkholes, such as those that occur with some frequency in Florida, are attributed to a lowering of the water table result

    Jan 1, 1986

  • SME-ICGCM
    Mobile Roof Supports For Pillar Retreat Mining

    By Robert P. Kudlawiec

    The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th

    Jan 1, 2000

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    3D FEM Simulation For Fully Grouted Bolts

    By Khaled Morsy

    Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh

    Jan 1, 2004

  • SME-ICGCM
    Aerostatic Support System For Underground Coal Mines

    By R. J. Morrell

    The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra

    Jan 1, 1988