Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Bolt Load Changes During Initial Face Advance And Cross-Cut Breakthrough

    By Steve Signer

    The San Juan Mine and the National Institute for Occupational Safety and Health conducted a study to measure how development mining effected bolt loads. Twelve fully grouted, instrumented roof bolts w

    Jan 1, 2004

  • SME-ICGCM
    Floor Heave Control Outby the Seal Line in No. 11 West Kentucky Seam

    By Joel Bradley, Kot Unrug, Kyle Perry, Mark Klimek

    "A West Kentucky mine operation in No. 11 seam, encountered floor heave, due to the localized increase of the thickness in the fireclay mine floor. Floor heave has overridden seals installed in two mi

    Jan 1, 2015

  • SME-ICGCM
    Engineering Methods For The Design And Employment Of Wood Cribs

    By Thomas M. Barczak

    Wood cribs are used extensively to stabilize mine openings by providing resistance to deflections of the immediate roof and floor and by supporting the weight of unstable rock masses. While the unit c

    Jan 1, 1993

  • SME-ICGCM
    Investigation Into Cutting Characteristics Of Indian Coal Seams (bf5c67f9-81c7-4039-8f47-cd39420e2b8e)

    By T. N. Singh

    With a view to producing increased target output every year, Indian coal mining industry is fast moving towards mechanisation but the present approach of mechanisation suffers from lack of standardisa

    Jan 1, 1992

  • SME-ICGCM
    The Stress Measurement and Underground Engineering

    By Ding Xu Chu

    There are many methods developed for measuring the crustal stress in China. Among them only two methods have been adopted in practice, i.e., overcoring method (for which the sensors include: Piezo-mag

    Jan 1, 1987

  • SME-ICGCM
    Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone Strata

    By J. R. Koehler

    The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f

    Jan 1, 1995

  • SME-ICGCM
    Case Study of Roof Behaviour and Conditions for Longwall Face Recoveries at Beltana No. 1 Mine, Australia

    By David Hill

    Over the last decade, Beltana No.1 Mine has generally been Australia?s most productive longwall operation, with a ROM output of 7.2 Mt in YEJ2007. Characteristically favorable roof conditions and low

    Jan 1, 2011

  • SME-ICGCM
    Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine

    In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,

    Jan 1, 1997

  • SME-ICGCM
    Greater Safety With Increased Productivity Coal Mining Operations

    By William B. Beerbower

    When full length resin grouted bolts were introduced into U. S. coal mines some 11 years ago, it was assumed that safety would be the primary benefit. There is ample testimony to substantiate the safe

    Jan 1, 1982

  • SME-ICGCM
    Evaluation Of Low-Coal ATRS Systems

    By M. Terry Hoch

    This paper presents information on low-coal ATRS systems that are now in use. A study was conducted consisting of an in-mine evaluation of ATRS- equipped roof bolters capable of bolting in seams below

    Jan 1, 1988

  • SME-ICGCM
    Intersection Stability and Tensioned Bolting

    By Yunqing Zhang

    Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt

    Jan 1, 2003

  • SME-ICGCM
    Subsidence Prediction Influence Assessment and Damage Control

    By Y. Luo

    An extensive subsidence research program conducted by the authors has greatly improved the accuracy and the capabilities of subsidence prediction under complicated mining and surface conditions. The t

    Jan 1, 1997

  • SME-ICGCM
    A Design Approach For A Swelling Rock In An Underground Mine In Türkîye

    By A. G. Pasamehmetoglu

    The swelling process is an important problem causing damages to the structures in or on swelling rocks, both during construction and operating life. To understand swelling problem, a number of testing

    Jan 1, 1992

  • SME-ICGCM
    Methods Of Controlling Thick And Strong Roof In Longwall Mining

    By Deren Zhu

    The principle of roof control in longwall mining is to control main roof fractures so as to reduce roof weighting, plus reasonable and effective design of supports to reduce the convergence and premat

    Jan 1, 1990

  • SME-ICGCM
    Full-face Pressure Monitoring in Medium-Weak Roof Condition

    By Syd S. Peng

    Full-face shield leg pressures in a longwall panel for a three-month period were collected and analyzed. The pressure data were presented in the following forms: full- panel full-face shield pressure,

    Jan 1, 1997

  • SME-ICGCM
    The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in China

    By Jiacheng Wang

    The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la

    Jan 1, 2011

  • SME-ICGCM
    Modelling Of Pillar Stability In Room And Pillar Mines

    By Douglas Morrison

    By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o

    Jan 1, 2003

  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Automated Temporary Roof Support Systems: An Update

    By William Gray

    It has been ten years since the Mine Safety and Health Administration (MSHA) promulgated a safety standard requiring the use of Automated Temporary Roof Support (ATRS) systems in underground coal mine

    Jan 1, 1998