Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Multiple Controls to attenuate damage in Final Pit Walls

    By Daniel Vargas Quispe, Yorhinio León Robles, Marco Jauregui Vargas, Helen Espinoza Bailon, Oshin Quispe Luya

    This project describes the methodology applied during the execution of tests to determine the multiple controls that mitigate damage to the final walls of the pit. The different tests were executed on

    Jan 21, 2025

  • ISEE
    Blast Vibration Monitoring & Calibration in the 21st Century

    By W. J. Birch, R. Farnfield

    Nuisance caused by perceived high vibration levels as a result of blasting on quarries and opencast coal mine is now the number one environmental concern of residents living adjacent to such operation

    Jan 1, 2014

  • ISEE
    Sequence of Events During a Blast

    By Favreau R. F. Ph. D, Favreau Patrice

    The article explains that the way to achieve a successful blast is by insuring that the explosive energy divides properly into the weakening action of the shock wave which is necessary to prevent larg

    Feb 1, 2020

  • ISEE
    Dynamic Mud Flow Effects on Emulsion Explosives in Indonesia

    By Garfiansyah Rayes

    In 2023, an Indonesian coal mine experienced significant contamination of an emulsion blend explosive by dynamic mud and water flow, triggered by flooding due to exceptionally high rainfall. This intr

    Jan 21, 2025

  • ISEE
    Blasting In Close Proximity to Densely Populated Communities

    By Radhe Krishna, Mutale William Chanda, Timothy Mwale

    Blasting as a process is the emplacement of industrial explosives into blast holes suitably located to a free surface and detonated. Every blast hole containing a certain amount of explosive charge un

    Jan 1, 2015

  • ISEE
    A powder factor build-up model to quantify most common influencing factors at the Serra Sul mine

    By L. Chaves

    In rock blasting, due to numerous factors, both controllable and uncontrollable, the execution rarely meets the planning. The powder factor is an important KPI for blasting since it represents the amo

    Jan 1, 2024

  • ISEE
    Numerical Investigation of Blasting Fume Characteristics in a Block Caving Mine

    By Yong Pan, Purushotham Tukkaraja

    Block caving is a preferred underground mining technique due to its high production rate and low operation cost. Before its final step into a mature caving system using gravity to break rock, drilling

  • ISEE
    Numerical Investigation of Blasting Fume Characteristics in a Block Caving Mine

    By Yong Pan, Purushotham Tukkaraja

    In this paper, CFD was used to investigate the blasting toxic fume characteristics under different entrapping percentages and under changing muck pile properties like broken rock size and porosity. It

    Feb 1, 2020

  • ISEE
    Density Monitoring of Bulk Emulsion Explosives in Confined Boreholes

    By Felipe França Sitonio

    Parameter’s control of explosives used in blasting operations have become more relevant over the years, bringing a better understanding of detonation performance. Giving into consideration that bulk e

    Feb 2, 2020

  • ISEE
    The Hercudet System of Initiation

    By Robert B. Hopler

    Hercules Incorporated has designed, developed, and begun introducing a new non-electric delay blasting cap system which is radically different from anything presently available. This system, called He

    Jan 1, 1975

  • ISEE
    Defining and controlling the environmental impacts of blasting at a major opencast coal mine

    By D. Mason, W. J. Birch

    Blasting operations are arguably one of the most contentious areas of surface mining.Many operators carry out outine monitoring as required by Mineral Planning Authorities. However in so doing they on

    Jan 1, 2011

  • ISEE
    Application Electronic Initiation System in Hot and Reactive Ground Conditions

    By Muhammad Yamani, Marsell Riviera, Herry Saputra, Rizky Amin

    Drill and Blast processes in hot and reactive ground conditions are a severe challenge in mining, especially in the blasting process. Our main objective is safety issues without compromising the blast

    Feb 6, 2023

  • ISEE
    Stealing Thor's Thunder Lightening: Myth vs. Reality

    By C W. "Mickey" Bradley

    Thunder strikes terror in the hearts of man and has since the advent of time. We all fear the unknown; even the Greeks created a god, THOR, to be responsible for the thunder and rain. Thunder, by itse

    Jan 1, 1992

  • ISEE
    Blast Optimization Using both the Multiple Blasthole Fragmentation (MBF)and Multiple Seed Waveforms (MSW)Models at an Open Pit Metal Mine

    By J. P. Proulx, Richard O’Meara, Ruilin Yang

    A blast optimization project was carried out at an Open Pit Metal Mine using the Multiple Blasthole Fragmentation (MBF) Model and the Multiple Seed Waveform (MSW) blast vibration model. The aim of the

  • ISEE
    NOx Detection in Video Data Based on Ensemble Machine Learning

    By Emmett J. Ientilucci, Martin Held, Xuesong Liu

    Mining is crucial for advancing technology and science by providing essential resources and materials. Quarry blasting, a necessary process in mining, releases these resources and chemicals, driving r

    Jan 21, 2025

  • ISEE
    Explosive Avalanche Control

    By Braden Schmidt

    The following full paper will go into the products, techniques and people who work in the avalanche control industry giving insight to the other members of the ISEE an overview of the niche blasting t

    Feb 1, 2020

  • ISEE
    Pump Protection Systems on Mobile Equipment

    By Tom Watts

    This paper will focus on the design, manufacture and use of pump safety systems on MMUs (Mobile Manufacturing Units – Bulk Trucks) with progressive cavity pumps. The practice of pumping bulk blasting

    Jan 1, 2009

  • ISEE
    Designing Blasts by Simulation Rather than Solely by Trial/Error

    By Roger Favreau, Patrice Favreau

    Without blasting there can be no roads, no hospitals, no factories, not even foundations for homes. Yet in 1960 the only way to design a blast was by trial/error. By comparison, bridges were already d

    Jan 1, 2013

  • ISEE
    New Development of Emulsion Explosive: Emulsion Powder and Granule Explosive

    By Wang Xuguang, Kang Tingzhang, Zhang Xiaozhi, Wang Guoli, Li Ziqianga

    Emulsion powder and granule explosive is produced through airflow fluidization technology by using W/O emulsion. Maintaining the microstructure of W/O emulsion, it has the advantages of both emulsion

    Jan 1, 2000

  • ISEE
    Target Loading from a Submerged Explosion

    By Ulrich Leiste, Andrew Wardlaw, William Fourney

    This paper describes the loading on a plate suspended directly over an explosive charge submerged in water. This problem is of interest because it yields results similar to those obtained in the deton

    Jan 1, 2008