Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Modern Seafloor Hydrothermal Deposits - Volcanic Island Arcs - Geochemistry Of Shallow Submarine Hydrothermal Fluids From Paleohori Bay, Milos, Aegean Sea

    By D. Stüben, G. P. Glasby

    "Abstract - Shallow submarine hydrothermal fluids from Paleohori Bay off the Greek Island of Milos have been investigated in detail. The extensive gas and warm (max. 93°C) water vents are enriched in

    Jan 1, 1999

  • CIM
    A Fluid Inclusion and Stable Isotopic Investigation of the Boston Lode-Gold Deposit, Hope Bay Volcanic Belt, Nunavut

    By K. Muehlenbachs, J. U. Stemler

    "Abstract - The Boston deposit is a recently discovered Archean lode-gold deposit located approximately 700 km northeast of Yellowknife, in the southern portion of the Hope Bay volcanic belt. Primary

    Jan 1, 2006

  • CIM
    A Novel AG-Crusher-HPGR Circuit for Hard, Weathered Ores Containing Clays

    By P. P. Rosario

    A research project was conducted at the University of British Columbia (UBC) resulting in the development and evaluation of a novel comminution circuit incorporating autogenous grinding and parallel t

    Jan 1, 2012

  • CIM
    Stabilization and regeneration of Ce02 and Ce02/Zr02 based Pt catalyst for the water gas shift reaction

    By R. M. S. Häggblad

    The article deals with stabilisation and regeneration of Ce02 and Ce02/Zr02 based Pt water gas shift catalysts, subject to high initial deactivation. The reaction gas species effect on the catalyst de

    Jan 1, 2005

  • CIM
    Geological Environments for PGE-Cu-Ni Mineralization in the East Bull Lake Gabbro-Anorthosite Intrusion, Ontario

    By D. C. Peck, James. R. S., Chubb. P. T.

    "Abstract -The East Bull Lake gabbro-anorthosite intrusion is one of several Early Proterozoic layered matie intrusions occurring along the Southern Province - Superior Province boundary in the Ellio

    Jan 1, 1993

  • CIM
    Host-rock geochemistry and massive volcanogenic sulphide ores

    By J. S. Fox

    Major-element data for unaltered, unmineralized felsic host rocks from a number of stratigraphically simple, massive volcanogenic Zn-Cu(-Pb) sulphide deposits of low metamorphic grade have been compil

    Jan 1, 1979

  • CIM
    Two-Stage Tungsten (Ferberite)-Copper Ore Processing Using Gravity and Leaching Approaches

    By P. Karimi, G. Mollataheri, A. Amini, H. Abdollahi, A. Mirzaeian

    "Chah-Palang tungsten deposit is one of the two tungsten indexes in Iran. Based on ore characterization techniques (including optical mineralogy and XRD analysis), quartz, chlorite, atacamite, azurite

    Jan 1, 2016

  • CIM
    Examples of Mineral Beneficiation by Colour Sorting

    The Industrial Minerals Milling Section of the Mineral Processing Division has been engaged for the past three years in a study of the separation of minerals, by means of electronic sorting equipment,

    Jan 1, 1965

  • CIM
    Improving Energy Efficiency in Barrick Grinding Circuits

    By Lloyd Buckingham

    Barrick Gold Corporation (Barrick) has undertaken innovative methods of evaluating and improving the performance of grinding mills in several of its operations around the world. The results have been

    Jan 1, 2012

  • CIM
    The Rexspar fluorite and uranium deposits

    By Jean Descarreaux

    "The Rexspar uranium deposits are located near Birch Island in central British Columbia. The property lies within the Omineca crystalline belt of the Cordilleran Orogen. Gneiss, schist, tuffaceous and

    Jan 1, 1986

  • CIM
    Research on Mineral Processing Technology and Production Adjustment for Seyrigite Ore

    By Tong Guan, Guangqin Fu, Lihong Deng, Yuanlin Chen, Xiaotong Zhou

    "In natural world, some kinds of scheelite minerals are rich in molybdenum. Molybdenum exists in the crystal lattice of scheelite in the form of isomorphism, and the content of MoO3 varies from 2% to

    Jan 1, 2016

  • CIM
    Project Environmental Approval

    By B. R. Boardman

    Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar

    Jan 1, 1978

  • CIM
    An overview of gold deposits in the eastern Abitibi sub province

    By François Robert

    "The Eastern Abitibi Sub province (Quebec segment), contains two main types of gold deposits: the common quartz-vein type and the rare pyritic type. Both occur in areas dominated by volcanic rocks and

    Jan 1, 1990

  • CIM
    The Mobilization and Potential “In-Autoclave” Recovery of Gold during Pressure Oxidation and Leaching of Auriferous Sulfide Materials

    By J. -C. Parisien-La Salle, D. Blais, G. P. Demopoulos

    "In this work the dissolution, precipitation and adsorption behaviour of gold in acidic iron sulphate media containing small amounts of chloride ions is investigated via batch laboratory tests and OLI

    Jan 1, 2012

  • CIM
    Mill Tailing Disposal at Hollinger

    By The Mill Staff

    Introduction The Hollinger cyanidation mill commenced operating in June, 1912, and 49,779,978 tons of solids had been discarded by the end of 1950. The present tailing disposal plant has been in oper

    Jan 1, 1951

  • CIM
    An evaluation of genetic models for gold deposits of the Bousquet District, Quebec, based on their mineralogic, geochemical, and structural characteristics

    By Claude Hubert, Alex C. Brown, Pascal Marquis, D. M. Rigg

    "Numerous studies of the Bousquet mining district, Abitibi, Quebec, mainly following the successive discoveries of new gold deposits over the past two decades, have led to a broad range of genetic hyp

    Jan 1, 1990

  • CIM
    Improvements to Production Planning in Oil Sands Mining Through Analysis and Simulation of Truck Cycle Times

    By E. Goris Cervantes

    "A theoretical framework based on a detailed analysis of mine operations data from an oil sands mine in northern Alberta and the static simulation of truck cycle times are developed, verified, and val

    Jan 1, 2019

  • CIM
    Planning and construction of the Tumbler Ridge Branch Line

    By V. W. Shtenko, B. J. Ennis, P. H. Bridge

    "The northeastern region of British Columbia contains large quantities of high-quality metallurgical coal. To market the coal, it was necessary to provide the required infrastructure which included ra

    Jan 1, 1983

  • CIM
    Impurity Disposition and Control in the Ravensthorpe Acid Leaching Process

    By D. T. White

    Pressure acid leaching of nickel laterite ores typically involves the production of an intermediate product that is releached and refined to pure nickel and cobalt products. BHP Billiton is developing

    Jan 1, 2006

  • CIM
    WMCR - Kalgoorlie Nickel Smelter Operations Overview 1972 - 2005

    By J. Malone, D. Loth, J. Palmer

    WMC Resources' Kalgoorlie Nickel Smelter was commissioned in 1972 at a design capacity of 30,000 tpa of contained Nickel in matte. A series of upgrades and progressive improvements have resulted

    Jan 1, 2005