Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Operational risk management and critical controls for interacting pit stages at Ok Tedi

    By J Isarua, R Mabiria

    The Ok Tedi copper and gold project, located in the Western Province of Papua New Guinea, commenced operations in 1983. The open cut mine has undergone several significant transformations throughout i

    May 5, 2022

  • AUSIMM
    Elasto-Plastic Finite Element Structural Stability Analysis of Room and Pillar Mine Workings

    By Porter I, Singh RN

    An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine struc

    Jan 1, 1992

  • AUSIMM
    Paper No. 158. Presidential Address. Ore Treatment at The Broken Hill Proprietary Mine.

    The treatment of the Broken Hill ores has,undergone many changes during the last ten years, and it may be of interest to some of the members to know what are the main lines on which the Proprietary Mi

    Jan 1, 1907

  • AUSIMM
    Blast Control in Small Scale Underground Mining

    By McKenzie C. K, Stewart R. S, Simpson J

    Blast control in small scale underground mining leads to improved fragmentation control, improved control over overbreak and dilution, and the optimisation of drilling and charging operations. Greatly

    Jan 1, 1993

  • AUSIMM
    Using SAP Business Objects to Deliver Actionable Information for Operators to Management

    Real-time data collection and plant historians are becoming common place in mining and processing plants. This vast quantity of data must be turned into easily accessible and actionable information fo

    Sep 26, 2011

  • AUSIMM
    Chemical Speciation in Hydrometallurgical Cyanide Solutions

    By May P. M

    The role of chemical speciation in alkaline cyanide solutions is discussed by reference to recent experimental data from the authors' laboratories. It is shown that serious gaps exist in our pr

    Jan 1, 1991

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • AUSIMM
    A New Technique for the Activation of Sphalerite

    The activiltion of sphalerite with electrolytically generated copper ions from a copper electrode instead of the usual practice of the addition of copper sulphate was studied in the laboratory. A larg

    Jan 1, 1973

  • AUSIMM
    Gas Phase Sulphation of Nickel Laterite Ores

    By Rankin W. J

    Increasing concern with the emission of sulphur dioxide from smelters and roasters has caused renewed interest in processes which can use waste sulphur dioxide, such as the sulphation of nickel late

    Jan 1, 1996

  • AUSIMM
    A Review of Geotechnical Considerations in Narrow Vein Mining in a High Stress Environment

    By Dight P. M

    The challenge of narrow vein mining is to produce ore with as little dilution as possible, at the least cost -commensurate with the increasing degrees of safety being demanded for mine workers by the

    Jan 1, 1993

  • AUSIMM
    Drainage Research at Mount Isa Mines Limited 1992 - 1997

    By Chend J

    Research conducted into backfill drainage at Mount Isa Mines since 1992 is described. Piping in draining backfilled scopes has been the primary cause of bulkhead failures and emphasis is placed on r

    Jan 1, 1998

  • AUSIMM
    The Mufultra Sandplant

    By Russell F. M

    Following the accident in the Peterson section of Mufulira mine in September, 1970, a method had to be found of extracting up to 300 000 tonnes of ore per month from this area without inducing cavin

    Jan 1, 1973

  • AUSIMM
    Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo

    By Wright R. J

    The Commission called tenders for a four boom hydraulic jumbo, plus basket, on an art- iculated carrier in Sept. 1977. Atlas Copco submitted the successful tender in Jan. 1978 for the supply of a th

    Jan 1, 1981

  • AUSIMM
    Sensitive dependence on initial conditions in resource estimation

    By D Kentwell

    This extended abstract and associated presentation provide a series of real examples of the complex interactions between the numerous input parameters, both geological and mathematical, that are requi

    Nov 21, 2018

  • AUSIMM
    Integrated Resource Asset Management - A Holistic Approach to Information Technology in Mining Operations

    Over the last ten years geological and mining software products have evolved greatly. Software companies developing such products have focussed almost exclusively on the development of technical aspec

    Jan 1, 1999

  • AUSIMM
    Design of a Large-Scale Concentrator for Treatment of a Copper Skarn Orebody

    By T Hayward, G Lane, M Phillips

    In December 2004 Phu Bia Mining Ltd commissioned Ausenco International Limited to conduct a feasibility study for its Phu Kham copper-gold project located in Laos. The feasibility study for a mining a

    Jan 1, 2007

  • AUSIMM
    Water Systems for Distributing Cooling in Deep South African Gold Mines

    By De Carvalho J

    The average installed refrigeration capacity on South African gold mines has increased by about eighteen per cent annually for the past 15 years; both the number of installations and their duties h

    Jan 1, 1988

  • AUSIMM
    Developments of the Mackie Vat Leaching Jig

    Traditional vat leaching has been done on a batch basis, which involves loading the vats, leaching, drainage, washing, draining again, and unloading. As a result of these many steps and the attenden

    Jan 1, 1991

  • AUSIMM
    Underground Hydraulic Filling Storage At North Broken Hill Limited

    An underground storage and filling distribution system is presently being established at North Broken Hill Limited in the No.3 Shaft area. This has been necessitat- ed by the dependence of the pres

    Jan 1, 1973

  • AUSIMM
    Stop investigating everything! How to classify events to maximise organisational learning and reduce systemic risk

    By M Alston

    Organisations’ incident classification processes are plagued by the overclassification of events, often leading to excessive workloads and suboptimal outcomes. This presentation addresses the pressing

    Apr 16, 2024