The Mufultra Sandplant

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 9
- File Size:
- 719 KB
- Publication Date:
- Jan 1, 1973
Abstract
Following the accident in the Peterson section of Mufulira mine in September, 1970, a method had to be found of extracting up to 300 000 tonnes of ore per month from this area without inducing caving. Sandfill mining methods were chosen, necessitating a plant capable of producing both cemented and uncemented fill on a large scale. The paper covers the design and construction of this sandplant which is thought to be unique for its size, as it incorporates three 3 000 tonne capacity settled storage silos, a 500 tonne capacity cement silo, mixing tanks and a control room situated underground. The plant is designed to handle an aver- age of 440 tonnes per hour with a maximum of 660 tonnes per hour for limited periods, delivering either uncemented fill or cemented fill in proportions varying from 1:6 to 1:30. The instrumentation and equipment necessary to give one man operation of the plant is described and the fill mining methods now in use at Mufulira are briefly outlined.
Citation
APA:
(1973) The Mufultra SandplantMLA: The Mufultra Sandplant. The Australasian Institute of Mining and Metallurgy, 1973.