Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Friction bolt performance over the past ten years in Australian mines

    By T M. Nester, D J. Reardon, A N. Page, B J. Barsanti

    The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have obser

    Nov 29, 2022

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    Gas Evolution Trends for Coal from Two Different Areas at Clarence Colliery

    By J Sargeant, T Levi, J Theiler, B Beamish

    Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper

    Aug 31, 2015

  • AUSIMM
    Extending mine life through application of an in situ recovery approach

    By D J. Robinson, L L. Kuhar

    In-situ recovery (ISR) is accepted and applied across many geographies, and approximately 50% of the world’s uranium is currently extracted by using an ISR method (World Nuclear Association, 2014). T

    Jul 25, 2018

  • AUSIMM
    Multisource rock characterisation at microscale for a better understanding of processing characteristics

    By B Bonfils, P Lois Morales, C Evans

    One of the main challenges for current and future mining and processing methodologies is to understand the characteristics of the rock so that its behaviour in one or more parts of the mining process

    Nov 21, 2018

  • AUSIMM
    Goodbye from the Argyle diamond deposit – insights from deep mining of the world’s largest diamond deposit

    By C B. Smith, G L. Boxer, S W. Moss, A L. Jaques, V Lorenz, M J. Rayner

    The Ernest Henry Iron Oxide Copper Gold deposit is hosted in a large dilation between two moderately dipping shear zones found in the footwall and hanging wall of the deposit. These shears are control

    Mar 22, 2022

  • AUSIMM
    An investigative study on the interfacial behaviour of waste graphite resource with liquid iron

    By S Udayakumar, S Biswal, N Sarmadi, V Sahajwalla, F Pahlevani

    Recent times have witnessed a notable momentum in the interest surrounding technology dedicated to harnessing waste as valuable resources, prompted by the mounting challenges posed by waste accumulati

    Jun 19, 2024

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014

  • AUSIMM
    Measuring the recovery of coal mine rehabilitation following fire in Queensland using remote sensing and ground surveys

    By S Phinn, V Glenn, P McKenna, P D. Erskine, D Doley

    The key goals for mine site rehabilitation require mine managers to demonstrate that rehabilitation is safe, stable, self-sustainable and non-polluting. Within this context, it is reasonable for stake

    Jul 25, 2018

  • AUSIMM
    A review of dynamic energy-absorbing cable bolts

    By P Craig, M Holden, C Zhang, D Foster, J Oh, S Saydam, J Liu, H L. Ramandi, S Akdag

    High stress in rock masses can cause significant instability problems such as squeezing deformation in soft rock and rock bursts in hard rock. The support system applied in burst-prone areas in high-s

    Nov 29, 2022

  • AUSIMM
    Availability and Utilisation

    Excavator output rates given in Makers' catalogues are sometimes based on favourable operating conditions. Mine operators and planners are more interested in the Effective Hourly Output in no

    Jan 1, 1981

  • AUSIMM
    Understanding the causes of dilution in narrow vein stopes

    By S Thomas, S Ricketts, R Hassell

    Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d

    Mar 15, 2021

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Minimising cost of rheology control additives for iron ore slurries/tailings for enhancing processing performance

    By Y K. Leong

    Occasionally additives are used in the wet processing of iron ore tailings and slurries, for examples, in the thickening of tailings with flocculant to recover process water, and in the smooth pumping

    Sep 18, 2023

  • AUSIMM
    Experience with FloCEP® Slurry Flow Conditioning at Evolution Mining’s Edna May Operation

    By S H. Algie, D P. Taplin, S G. Doig

    "Suboptimal performance of clusters of hydrocyclones (cyclones), relative to the performance of the individual cyclones that comprise the cluster, is a common phenomenon. The primary cause is well kno

    Oct 10, 2016

  • AUSIMM
    Separation Of Magnetic Minerals By A Linear Motor Device (550d76f3-26bc-4160-b0b2-e11bb8a40ec4)

    By Grader F. E

    A linear motor properly wound can serve as a mechanism for separating paramagnetic sulphide minerals, like pyrrhotite, from other sulphides and associated gangue minerals. The effective- ness of se

    Jan 1, 1980

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Initiating-Systems for Underground Mass Firings Using Large Diameter Blastholes

    By Rashleigh C

    The selection and application of an effect- ive firing system first require a clear under- standing of the initiating abilities of the com- ponents in such systems. The conditions under which charges

    Jan 1, 1978

  • AUSIMM
    The Geology of the Latrobe Valley Coalfields

    The continued exploration of the major brown coal deposits of the Latrobe Valley has resulted not only in the discovery of huge additional reserves, but also in new concepts of the stratigraphy and st

    Jan 1, 1960