Availability and Utilisation
 
    
    - Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 25
- File Size:
- 1012 KB
- Publication Date:
- Jan 1, 1981
Abstract
Excavator output rates given in Makers'  catalogues are sometimes based on favourable  operating conditions. Mine operators and  planners are more interested in the Effective  Hourly Output in normal operation (Qe) a plant  system can give hour by hour and year after year  in a particular application. The number of hours mining plant will be  available for normal operation will be less  than the annual total of 8760 h. The number of  the available hours which can be utilised at  Qe will depend largely on the number and types  of units in the plant system, the manners in  which they are applied and the nature of the  deposit in which they work. The emphasis herein is on continuous  systems for deep stripping with BWE's as the  primary excavator. Examples and suggestions  are given for the annual hours at Qe for some  BWE systems.
Citation
APA: (1981) Availability and Utilisation
MLA: Availability and Utilisation. The Australasian Institute of Mining and Metallurgy, 1981.
