Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Colorimetric Determination of Tungsten in Soils, Sediments, and Rocks by Zinc Dithiol

    Samples weighing O·25 g are fused with 1 g potassium hydrogen sulphate, leached with 5 ml. of hydrochloric acid, and then diluted with another 5 ml. of acid. After settling, an aliquot of the cle

    Jan 1, 1970

  • AUSIMM
    Rethinking Merit for a Sustainable Mining Industry

    By K Hobbs

    Mining is experiencing a difficult period of low profitability and declining productivity. To achieve sustainability, mining companies are challenged with improving output, quality and safety while de

    Jun 22, 2016

  • AUSIMM
    Geophysical blasthole sampling

    By C Simpson, J Market

    The process of sampling blasthole cones utilising personnel to manually shovel material into sample bags is a long-standing industry accepted process. However, this method has several drawbacks, inclu

    Nov 8, 2021

  • AUSIMM
    Vibration energy harvesting for self-powered sensors at mine sites

    By H Zhang, M Karimi, M Hassan, S Saydam, B Li

    With the prevalence of Mine Internet of Things (MIoT), different types of sensors have been widely deployed in mine sites for environmental monitoring and operational management. Currently, sensors in

    Sep 1, 2024

  • AUSIMM
    The challenges of the reuse of tailings and overburden

    By E M. Gama, L Resende

    The tailings are waste from mineral processing operations. The type of tailings of iron ore processing are classified into sandy tailings and mud. Already the overburden are showing significant levels

    Jul 23, 2018

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast

    By Kleine T. H

    Blast design involves many engineering constraints and objectives. Some of the more important include the implementation costs, the desired fragmentation and shape of the muckpile. A spreadsheet has b

    Jan 1, 1992

  • AUSIMM
    Recovery of Berryllia from Beryl

    By Lawrie DC

    Finely ground beryl was decomposed by mixing with ground limestone and soda ash andheating at 900¦C for,4-6, hours.The sintered material was then crushed and leached by boiling under reflux with 5N su

    Jan 1, 1963

  • AUSIMM
    Filtration Test Work – Extracting the Whole Story for Studies and Design

    By G Bickert

    Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a

    Aug 8, 2011

  • AUSIMM
    Leaching of Sulfidic Backfill at the Thalanga Copper-Lead-Zinc Mine, Queensland, Australia

    By B G. Lottermoser

    The placement of sulfidic waste below the groundwater table ensures limited interaction with the hydrosphere and suppression of sulfide oxidation. However, if sulfidic waste is placed above the ground

    Jan 1, 2003

  • AUSIMM
    The Problem of Increasing Coal Output from the Southern Mining District of New South Wales

    This problem is seen as being central to a number of peripheral problems. Of these, the following are considered to be of major importance: 1. Reserves. Changes in Quality. Depths at which they occ

    Jan 1, 1976

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Chalcocite Oxidation and its Influence on Fine Copper Recovery at the Ok Tedi Concentrator Papua New Guinea

    By Grano S. R, Lauder D. W

    Investigations on the oxidation behaviour of chalcocite and its rejuvenation by hydrogen sulphide ion have been undertaken. Chalcocite oxidation was measured using X-ray photoelectron spectroscopy (

    Jan 1, 1997

  • AUSIMM
    Project Selection and Process Development for Mining Juniors

    By L Lorenzen, H Muller

    "Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th

    May 24, 2012

  • AUSIMM
    Sustainability of the Flooding of Lignite Mining Lakes as a Remediation Technique Against Acidification in the Lusatian Mining District, Germany

    By W Uhlmann, U Grnnewald, B Nixdorf

    Flooding with surface water is the preferred technique for the abatement of acidification from pyrite oxidation in the lakes of abandoned Lusatian lignite mines. However, water resources of the region

    Jan 1, 2003

  • AUSIMM
    Investigations on Fume Losses at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    The paper continues an account, begun in a previous paper, of experimental work carried out by the author whilst a member of the metallurgical staff at the Cockle Creek Works. The general method of th

    Jan 1, 1925

  • AUSIMM
    The Application of Measurement and Modelling of Sulfidic Coal Wastes at Pacific Coal's Kestrel Mine for Use in Development of a Closure Plan

    By T A. Short, P L. Brown

    Kestrel Mine co-disposes around 1.5 Mt of fine (2SO4/t and to date around 9 Mt has been deposited. The mine plans to co-dispose of approximately 39 Mt of material, creating a dump with a maximum heigh

    Jan 1, 2003

  • AUSIMM
    A Second Derwent Crossing for Hobart

    Proposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai

    Jan 1, 1977

  • AUSIMM
    Ground support rationalisation at Golden Grove

    By R Varden

    This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications

    Mar 29, 2023

  • AUSIMM
    High temperature characteristics of different types of blast furnace ferrous materials

    By S Hapugoda, A Edenton, L Lu

    The blast furnace cohesive zone has a profound impact on hot metal productivity and quality, fuel consumption, operational stability and the lining life of the blast furnace. The high temperature prop

    Nov 8, 2021