Search Documents

  • CIM
    Project Execution & Cost Escalation in the Mining Industry

    By John A. Wells, Leticia Conca, Kenneth G. Thomas

    "Since about 2002 there has been significant capital cost escalation, not inflation, in the mining industry causing turmoil for successful project completion. Project capital costs have more than doub

    Jan 1, 2014

  • DFI
    "Value Engineering" In United States Of America

    By Maral Papazian Bedian

    Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng

    Jan 1, 2002

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • AIME
    Report Of Committee On Uniform Mining Laws For Prevention Of Mine Accidents.

    By AIME AIME

    TO THE AMERICAN MINING CONGRESS. AMERICAN INSTITUTE OE MINING ENGINEERS. MINING AND METALLURGICAL SOCIETY OF AMERICA. The committee that makes this report was appointed at the meeting of the Americ

    Jan 10, 1910

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • AUSIMM
    Geotechnical Challenges in Cave Monitoring – a Modern Approach

    By A Jäger, J L. Lett, J Rachocki and B Mobilio

    The Newcrest Mining Limited Cadia East Panel Cave mines near Orange, New South Wales, Australia commenced production 1200 m below the surface in May 2014. Understanding the mine-wide impact caving had

    May 9, 2016

  • AUSIMM
    Environmentally and Publicly Acceptable Options for Remediation at Tui Mine Site, Te Aroha

    By J Webster-Brown

    The Tui Mine is an abandoned Pb-Zn mine giving rise to water quality problems in the Te Aroha region of Coromandel, New Zealand. When sampled in September 2002, for example, both the Tui and Tunakohoi

    Jan 1, 2003

  • NIOSH
    Review Of Mining Technology (1dc40e31-63f9-4092-a148-2e045745fedc)

    By James E. Hill

    Tremendous improvements in mining technology have been witnessed during the past 100 years. For example, before 1860 all blastholes were drilled manually and blasting was done with low-energy black-po

    Jan 1, 1966

  • IOM3
    Damage to underground excavations from open-pit blasting

    By A. M. Tunstall

    Aspects of blast vibrations, damage mechanisms and the influence of rock quality on damage severity are reviewed and results presented from a monitoring programme in which the rock mass rating for six

    Jun 19, 1905

  • AUSIMM
    Regional and Tectonical Geology in Relation to Australian Ore Deposits

    The extent of regional stratigraphic and structural geological mapping so far carried out in Australia is likely to be greatly overestimated by uncritical inspection of the latest authoritative geolog

    Jan 1, 1950

  • SAIMM
    Casting And Cooling/Crushing Of Silicon Metal And Silicon Alloy At Bécancour Silicon Inc.

    By D. Ksinsik, R. Boisvert, D. Leblanc

    Casting, cooling and crushing/sieving of ferroalloys has followed a well-established pattern in the whole ferroalloys industry for many years. Usually liquid metal or alloys are cast into flat open m

    Jan 1, 2004

  • NIOSH
    Bulletin 158 Cost Accounting for Oil Producers

    By CLARENCE G. SMITH

    Prior to the actual development of an oil property it is difficult to determine the quantity of oil under the property and the rate at which this oil can be brought to the surface-factors that determi

    Jan 1, 1917

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • AIME
    Forthcoming Meetings Of Societies (07c0cebd-a4de-4342-9a59-c5b0002b89af)

    Organization Place Date 1919 American Chemical Society Philadelphia, Pa. Sept. 2-6 National Assn. of Stationary Engineers Huntington, W. Va. Sept. 8 American Peat Society Minneapolis, Minn. Se

    Jan 9, 1919

  • AIME
    Institute of Metals Division - Thermal Expansion of CdS from 26° to 1000°K

    By B. A. Kulp, R. R. Reeber

    Lattice parameters for the wurtzite form of' CdS mere measured by powder X-ray diffraction techniques over the temperature range 26° to 1000 K'. A negative thermal -expansion coefficient was

    Jan 1, 1965

  • CIM
    The Milling Operation at McArthur River

    "The McArthur River uranium deposit is the single richest uranium ore body developed in the world to date. The ore body’s average grade is 15% U3O8. Proven reserves are in excess of 450 million pounds

    Jan 1, 2001

  • CIM
    A Novel Synthesis Route for the Preparation of Supported Gold Catalysts for Low-Temperature CO Oxidation

    By Gaby Steinbach

    A novel synthesis is described for the preparation of supported gold catalysts for low-temperature CO oxidation. The novel route is a variation of the inverse co-precipitation method and requires amph

    Oct 1, 2003

  • AIME
    Authors' Replies To Discussion Of Papers Presented At Recent Meetings

    Discussion of the paper of R. J. COLONY, presented at the New York Meeting, February, 1921, and issued With MINING AND METALLURGY No. 169, January, 1921. R. J. COLONY (author's reply to discussi

    Jan 8, 1921

  • AUSIMM
    Maximising the Operational Benefit of Capital Investment Via Computer Simulation

    In the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its

    Jan 1, 1990