Search Documents

  • DFI
    The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge Piers

    By Leonardo Massone

    The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r

    Jan 1, 2012

  • CIM
    Adjunct Chemical Dust Control Strategies for High Tonnage Mining Operations

    By Brian Danyliw

    "Dust control is an increasingly important consideration for all mining operations from a health, safety, environmental and maintenance perspective. Modern mining operations incorporate a variety of m

    Jan 1, 2015

  • NIOSH
    RI 7732 Removing Pyrite From Coal By Dry-Separation Methods

    By W. T. Abel

    The difficulties associated with wet-processing fine size coal led the Bureau of Mines to investigate a dry process for removing pyrite from coal pulverized to powerplant fineness. The dry process tha

    Jan 1, 1973

  • ISEE
    Guidelines of Overburden Casting

    Since the ecrly 1970's several factcrs have changed. In the East the larger tracts of coal mined with large eauipment are being dePleted, The cost of moving the larger equipment from small tract to s

    Jan 1, 1989

  • AUSIMM
    A Convenient Index for the Assessment of Coal Cleaning Processes

    By Nicol S. K, Firth B. A

    Much effort over the years has been put into the task of devising parameters which adequately assess the metallurgical efficiency of mineral processmg operations. One of the most celebrated of these m

    Jan 1, 1978

  • SME
    Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel

    By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith

    Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East

    Jan 1, 2007

  • AUSIMM
    Environmental Costs (and benefits) of Planning and Developing Mines and Quarries

    The consideration of environmental constraints and issues is a fundamental component of all stages of planning, development, operation and decommissioning mining and quarrying projects. Provision n

    Jan 1, 1990

  • SME
    Analysis of significant mineral discoveries in the last 40 years and future trends

    By Douglas R. Cook

    Exploration record In preparing this paper, a list of world class discoveries prepared in 1983 has been updated. In both surveys, the following criteria were used in the definition of world class dis

    Jan 2, 1986

  • SAIMM
    The Proposed 2016 SAMREC Code

    By Steven Rupprecht

    "The South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves (the SAMREC Code or the Code) sets out minimum standards, recommendations and guidelines for pu

    Jan 1, 2015

  • ISEE
    Journal: Junction Chamber Blasting November 22,1999

    By Edward Walter

    Rock excavation for tunneling projects occurs on a regular basis in the Cleveland area. These tunnels are being constructed to increase the capacity of the sanitary sewer system. Controlled blasting m

    Jan 1, 2001

  • METSOC
    Risk Weighted Cash Flow, A Communication Tool For Engineers And Financial Professionals On New Technology Projects (d41d36b5-72c1-4d61-8c6a-fe26069e74d8)

    By Mark Kennedy

    New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological

    Jan 1, 2013

  • ISEE
    Advanced Blast Modeling for Mining Steeply Dipping Coal Seams

    By Dan L'Heureux, Joe Haid, Stephen H. Chung

    Most coal deposits in Western Canada involve steeply dipping multiple seams. An efficient way to recover coal seams would be to drill through the seams and blast both the overlying and underlying wast

    Jan 1, 1998

  • ISEE
    An Automated Approach to Blast Optimization Through Performance Monitoring of Blast Hole Drills and Mining Shovels

    By M Scoble

    This paper will report on the application of data collected through the performance monitoring of large diameter surface rotary blasthole drii and electric mining shovels, in an integrated approach to

    Jan 1, 1992

  • AUSIMM
    A Guide to the Understanding of Ore Reserve Estimation

    By Bujtor G. J, McMahon D. W

    This guide to the understanding of ore reserve estimation is the revised version of a report with a similar title circulated within the CRA Limited (CRA) group of companies in mid-1980. It is the prin

    Jan 1, 1982

  • NIOSH
    OFR-62-78 Automated Continuous Miner Preliminary Design - Section I - Introduction

    By K. C. McMahon

    This report is the result of the engineering efforts performed by the Mining Equipment Operations of FMC to develop methods of automating a continuous miner. This work was done as part of modification

    Jan 1, 1975

  • DFI
    Evaluating Geotechnical Resiliency Solutions in New York City

    By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith

    When selecting a solution for improving resiliency at facilities, such as airports, utility and transit sites, there are many options to protect structures and equipment against potential flooding. Ea

    Jan 1, 2018

  • IIMP
    Depósitos de plomo y zinc de la cordillera negra, Dpto. de Ancash, Perú (II)

    By Alfred Bodenlos

    El presente artículo describe la historia geológica pre-cretácica de la Cordillera Negra. En algunos intervalos predominaron los pantanos que dieron lugar a la formación de carbones. Luego, en el Vala

    Jul 1, 1957

  • NIOSH
    IC 7929 Open-Pit Copper Mining Methods And Costs At The Bagdad Mine, Bagdad Copper Corp., Yavapai County, Ariz. - Summary

    By W. R. Hardwick

    This information circular describes open-pit mining methods and practices of the Bagdad Copper Corp., Yavapai County, Ariz. It is one of a series being prepared by the Federal Bureau of Mines on minin

    Jan 1, 1959

  • SME
    Multi method approach to heavy mineral exploration: Miocene of Denmark

    By T. Rasmussen, T. G. Jørgensen, T. Fischer, R. K. McLimans, C. Knudsen, D. Frei

    Ilmenite-bearing paleo-beach deposits were discovered in Jylland, Denmark using a combination of Ground Penetrating Radar (GPR), portable X-ray fluorescence (XMET), bulk XRF analyses, Computer Control

    Jan 1, 2005

  • SAIMM
    Net Present Value Maximization Model For Optimum Cut-Off Grade Policy Of Open Pit Mining Operations ? Synopsis

    The optimum cut-off grade policy maximizes the net present value (NPV) of an open pit mining operation subject to the mining, processing, and refining capacity constraints. The traditional approaches

    Jan 1, 2011