Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Ground Control Aspects of Mining Deep Remnant Panels at Falconbridge Lockerby Mine ? A Case Study

    By J. Ran

    There are challenges in mining deep tabular ore deposits using the open stoping method, particularly mining remnant panels towards the end of mine life. The remnant panels have experienced stress conc

    Apr 1, 2005

  • CIM
    Formability Improvment for AZ31 Magnesium Alloy Rolled at Wide Range of Rolling Speed and Reductions COM 2014 - 53rd Annual Conference of Metallurgists

    By H. Utsunomiya, J. Su, K. S. Tamimi, S. Yue, M. Sanjari, L. Kestens, Hara, A. S. Kabir, R. Petrov

    Manufacturing of thin sheet is difficult in industries. Some approaches, such as small-draft multi-pass rolling, intermediate annealing, isothermal rolling and high-speed rolling were proposed to over

    Jan 1, 2014

  • CIM
    Triboelectric Belt Separator for Beneficiation of Fine Minerals (b8c28651-e717-4f81-b978-f5aac17e36a1)

    By Stephen A. Gasiorowski, Frank J. Hrach, James D. Bittner

    Separation Technologies, LLC (ST) has developed a processing system based on triboelectric charging and electrostatic separation that provides the mineral processing industry a means to beneficiate fi

    Jan 1, 2012

  • CIM
    Les Mines Selbaie Story Geology

    By J. J. Bouillon

    "Located in the northwestern portion of the Abitibi greenstone belt, Les Mines Selbaie is a copper-zinc (silver and gold) producer. Felsic tuffs host three are zones. Composed of sulphide veins and br

    Jan 1, 1990

  • CIM
    Some Aspects of Industrial Safety and Accident Prevention in Coal Mines

    By V. A. Cooney

    Introduction For the compliment paid me by the Institute's kind invitation to speak this afternoon, I am very grateful. For the astuteness of your officers in determining that encouragement sh

    Jan 1, 1946

  • CIM
    The Application of the Marconaflo Slurry System to Mineral Processing and Extraction

    By N. W. Kirshenbaum

    "The Marconaflo slurry system was originally developed to reduce costs and solve technical problems in the marine transport of mineral cargoes. In the short time since its inception, it has been found

    Jan 1, 1973

  • CIM
    Characterization of Reference Gold Catalysts

    By Susumu Tsubota

    Three types of reference gold catalysts, i.e., 3wt%Au/TiO2 (Au-Ti: Type A), and 0.3wt%Au/Fe2O3 on alumina beads (AUS: Type B), and 5wt%Au/Fe2O3 (Au-Fe: Type C), were produced in a test plant scale by

    Oct 1, 2003

  • CIM
    Expert System Technology at the Polaris Mine

    By G. A. Kosick, C. A. Harris

    "Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr

    Jan 1, 1988

  • CIM
    Water Management and Effluent Treatment Practice

    By C. Larsen, E. Goodwin, E. Konigsmann

    "This paper describes the development of an innovative effluent treatment process for cyanide and heavy metal removal from tailings wastewaters at Hemlo Gold Mines Inc. Golden Giant operation.The impo

    Jan 1, 1989

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore (13a41608-dfe4-4266-9026-6b4afd0847bf)

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    Comparative View on the Metallurgy of the KIVCET-CS and Other Direct Lead Smelting Processes

    By K. B. Chaudhurl

    The thermodynamics of the reactions taking place are examined with the aid of equilibrium diagrams for the Pb-O-S system. Based on investigations of chemical, mineralogical and differential-thermo ana

    Jan 1, 1978

  • CIM
    Income taxes going up - and spending, too

    By Robert B. Parsons

    "Once all the hullabaloo about Finance Minister Wilson's April 27 budget died down (or was it an April 26 budget?), the pain of the budget papers began to sink in. Individuals and corporations wi

    Jan 1, 1989

  • CIM
    Hydrochloric acid leaching of an Elliot Lake uranium ore

    By G. M. Ritcey, K. E. Haque, S. H. Lucas

    "Laboratory-scale hydrochloric acid leach tests were conducted on an Elliot Lake uranium ore. Hydrochloric acid leaches without an oxidant or with molecular oxygen (i.e., air or pure oxygen gas) as an

    Jan 1, 1980

  • CIM
    Participative Management at the Golden Giant Mill, A Co-Ordinators Perspective

    By K. Barr, F. Grenier, J. Hettinger

    "To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build

    Jan 1, 1988

  • CIM
    Stereolithography—a rapid prototyping technique for orebody modelling and mine design

    By A. Akerman, C. P. O’Connor, N. Vayenas

    "Stereolithography is a well-known rapid prototyping technique in the manufacturing sector. Essentially, it is a three-dimensional printing process that produces plastic prototype parts from standard

    Jan 1, 2006

  • CIM
    Accurassay Laboratories: State-of-the-Art Automation of the TSMC Iron Ore Lab

    By Brad McBain

    Agenda ? Accurassay Laboratories and Automation ? History and experience ? Features and benefits of automation in the lab ? Tata Steel Minerals Canada (TSMC) Iron Ore Laboratory ? State-of-the a

    Aug 1, 2013

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    Analyzing Energy Consumption and Gas Emissions of Loading Equipment in Underground Mining

    "In an environment of rising energy prices and mining at greater depths, cost-efficient loading and hauling equipment is essential. Conducted at an underground mining operation, this study analyzes th

    Jan 1, 2015

  • CIM
    The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project Experience

    By Andy Fortin, Jeet Basi, Simon Hille

    Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,

    Jan 1, 2016