New Technology Provides Expanded Mine Design Options

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 9
- File Size:
- 1752 KB
- Publication Date:
- Oct 1, 2010
Abstract
IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will review the highest capacity raise drill system ever built (Redbore 100); as well as the technical difficulties in a single pass boring a 2,773 ft x 20 ft to 22 ft diameter raise. The difficult ground conditions and associated problems will be reviewed, as well as the solutions to overcome them. Use of the RVDS drilling tool to achieve .04% accuracy (14.5?) and the Geotube® water filtration system will also be covered.
Citation
APA:
(2010) New Technology Provides Expanded Mine Design OptionsMLA: New Technology Provides Expanded Mine Design Options. Canadian Institute of Mining, Metallurgy and Petroleum, 2010.