Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
NonDestructive Testing (NDT) of Winder Ropes in Western AustraliaThe paper reviews winder rope inspection procedures at the Non Destructive Testing (NDT) Unit of Western Australian School of Mines (WASM) and outlines measures taken to adopt the world's best
Jan 1, 1995
-
Plant and Process Design Improvements to Increase the Efficiency of Nickel Reduction at QNIBy R Piper
The Yabulu Nickel Refinery commissioned in 1974, processes lateritic ore via a modified Caron process to produce high quality nickel and cobalt products. The Greenvale orebody provided the sole source
Jan 1, 2002
-
Voorspoed Diamond Mine - Challenges of Re-Opening a Historical Mine with an Inferred ResourceThe pyroclastic-filled Voorspoed kimberlite pipe has a low grade due to significant internal dilution which translates to a marginal business case. The site, with excavations, tailings dumps and build
Jan 1, 2009
-
Frasers Underground - From Technical Study to ProductionOceana Gold CorporationÆs (OGC) Frasers underground (FRUG) transitioned into production in early 2008. The mine uses a relatively unique yielding pillars mining method that takes its lessons from empi
Jan 1, 2009
-
Production Schedule Optimisation in Underground Hard Rock Mining Using Mixed Integer ProgrammingBy E Topal
There are presently no suitable underground mine production scheduling optimisation models available for application to sublevel stope mining. Scheduling underground production for maximum return is t
Jan 1, 2007
-
An Integrated Approach to Optimising All Concentrator Products, Including TailingsBy A Riles
"Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o
Jun 15, 2016
-
Resource Modelling in an Evolving Mine - CSA Mine, Cobar, New South WalesBy E Haren, A Winchester
The CSA Mine has a long and varied history from initial discovery in 1871 through to the present. Lead-zinc mineralisation was mined historically near the surface. Today copper and silver are extracte
Jan 1, 2006
-
Significance of in Situ Strength Measurements for Prediction of Outburst Hazard in coal Mines of Lower SilesiaLower Silesia Coal Basin/SW Poland/ is adjacent to highly gas saturated igneous massiv and since the beginning of this century more than 1500 outbursts have occurred in four existing mines, includi
Jan 1, 1980
-
The Application of a Computerized Coal Inventory in the Formulation on an energy Policy for South AfricaA Presidential Commission of Enquiry into the conservation of South Africa's coal resources was appointed in 1970. This Commission, in co-operation with the Chamber of Mines of South Africa,
Jan 1, 1977
-
A Review of Models for the Steering Characteristics of Mining Machines: Drills, Continuos Miners and Tunnelling MachinesBy Mazandarani M, Chabot L, Vichion K
Pitch-steering models have been developed for discretely advanced mining machines (such as heading machines and coal shearers) using small-angle geometry and there are illustrative examples of simulat
Jan 1, 1991
-
Cover Design of a Backfilled Open Pit Based on a Systems Approach for a Uranium Mining SiteBy R Kahnt, S Jahn, D Baacke, M Eckart
Relocation into the Lichtenberg open pit mine of about 110 million m3 of sulfide-bearing and ARD-generating waste rock piled up on the surface is the most important and cost-intensive single surface r
Jan 1, 2003
-
A Column Bioleaching Model for Chalcocite ù An Investigation of Oxygen Limitation and Bacterial Inoculation on LeachingBy M R. Davidson, M P. Schwarz
A model for column bioleaching is investigated to identify and understand aspects of bacteria in bioleaching applications, which have implications in heap bioleaching operations. The model is used to
Jan 1, 2004
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount IsaBy K Kuganathan, Y Potvin
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the deepe
Jan 1, 1998
-
Spot Imagery for the Detection of Anomalous and Stressed Vegetation Over Mineral Deposits in Semi Arid TerrainSPOT imagery acquired in May 1986 of the areas that include the Dugald River lead-zinc lode, northwest Queensland, Australia and the Ngwenalekau copper deposit, Botswana has been evaluated and comp
Jan 1, 1988
-
Use of Advanced Oxidation Systems for Cost-Effective Emissions Reductions in the Metal Casting Industry and BeyondBy J C. Furness, F S. Cannon
Metal casting operations are a significant source of hazardous air pollutants. In particular, high production iron foundries emit significant quantities of volatile organic compounds (VOCs) during pou
Jan 1, 2002
-
Experiences n the Development of an Operaor Guidance System for On-Line Process Control and Fault DiagnosisBy Jelenich L, Murray J. Rantanen J
The experience gained in the development of an Operator Guidance System (OGS) for on-line process control and fault diagnosis in a commercial scale sintering process will be discussed in this paper.
Jan 1, 1995
-
The Role of the Consulting Engineer in the Design and Construction of Projects for the Minerals IndustryBy Woods PW
Consulting Engineers have been used in the mining and metallurgical industries for many years. The traditional role of the consultant overseas has been one of assisting with conceptual design right
Jan 1, 1975
-
Pilot Plant Objectives and Considerations for Evaluating the Waste Disposal of High Slimes Heavy Mineral Sand DepositsBy N Ross, N Goldup
In recent years the heavy mineral mining industry has started to look more closely at the feasibility of mining moderate to high slimes deposits. During the initial stages of orebody evaluation the pr
Jan 1, 2001
-
Activated Basket Anodes from Nickel Powder IV Evaluation of Production Parameters for Scaling-up the LPS ProcessBy McDonald K. J, Flann R. C
A liquid phase sintering (LPS) process for preparing basket anodes from nickel powder has been scaled-up and the innuence of compact green density and sulphur content, as well as sintering conditions
Jan 1, 1993
-
Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop ProjectBy Smith G. A
The scope and complexity of the Melbourne Underground Rail Loop Project and the budget restraints on the planning, design and construction of the works necessitated sound manage- ment procedures fo
Jan 1, 1981