Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines LimitedBy Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD
This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the
Jan 1, 1985
-
Assessment of Mill-Feed Sampling Strategies Based on a Variographic ExperimentBy K L. Olzard
At the WMC Resources Phosphate Hill operation, monitoring the quality of the ore delivered by the mine to the beneficiation plant is of prime importance to ensure the fertilizer is produced cost-effec
Jan 1, 2005
-
Effect of mud farming on the dewatering of bauxite residueBy D J. Williams, C Zhang, F E. Herrera Cabrera
Farming on bauxite residue using screw propelled equipment (SPE) has been commonly practised to accelerate dewatering and as it promotes consolidation and enhances storage capacity. However, it is unc
Jul 1, 2021
-
Possible Future Applications of Biotechnologies in the Gold Industry - A Prospective ApproachBy C M. Zammit, N Cook, F Reith, C L. Ciobanu, J Brugger
The role of biological agents in the gold mining industry is currently limited to the use of microorganisms in bioleaching and bioremediation. However, there is a variety of possibilities in which bio
Sep 26, 2013
-
Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head GradeBy K Jupp, T J. Howard
Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled
Jan 1, 2009
-
Lessons for the safe implementation of automation in miningBy R Burgess-Limerick, J Haight
A review of mining automation experiences was undertaken on behalf of the National Institute for Occupational Safety and Health (NIOSH). The research included a review of literature and guidance mater
Apr 16, 2024
-
Development of Newmont's Minahasa Gold Mine in IndonesiaThe green field discovery of a two million ounce high-grade refractory gold ore deposit in the Indonesian Province of Sulawesi Utara, led Newmont to utilise its proven technical expertise in dry grind
Jan 1, 1997
-
Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western AustraliaBy F Clark, J T. Carswell
Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an
Aug 18, 2014
-
Critical and Deleterious Metal Deportment in Sulfidic Waste Rocks, Baal Gammon, North QueenslandBy A Parbhakar-Fox, B G. Lottermoser, N Fox
"Determining the deportment of economic and environmentally significant elements in sulfidic mine materials (eg ore, gangue and waste) requires the use of advanced microanalytical techniques, includin
Jun 15, 2016
-
Challenges and solutions for deformation management of Cannington’s hoisting shaftBy A Clarkson
Cannington Mine is an underground silver lead zinc operation located in north-west Queensland which has been in production since 1997. Ore is primarily moved through an underground material handling s
Mar 29, 2023
-
Studies on the Effect of Burden on Blast Damage and the Inplementation of New Blasting Practices to Improve Productivity at KCGMÆs Fimiston MineBy G E. Smith, G N. Lye
Wall control blasting practices are necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional
Jan 1, 2001
-
Petrographic and Mineralogical Factors Affecting Gold Recovery at Macraes Flat, Eastern Otago, New ZealandBy D Craw, P V. Angus
Gold mineralisation at Macraes occurs as late quartz-carbonate veins within a body of sheared and hydrothermally altered Otago Schist, the Intrashear Schist. The alteration is characterised by the pre
Jan 1, 1999
-
Characterisation of Gold Ores by X-Ray Computed Tomography – Part 2: Applications to the Determination of Gold Particle Size and DistributionBy S C. Dominy
For any gold deposit-based geometallurgical study, the collection and processing of representative samples for gold grade and recovery tests is critical. Sampling protocols should be designed to suit
Sep 5, 2011
-
An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating OperationsBy S Q. Liu, E Kozan
This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is
Nov 24, 2014
-
The Foreign Investment Climate for Mining and Exploration in Indonesia and Papua New Guinea from an Australian PerspectiveBy Gillies A. D S
The active history of foreign investment in the mining industry has resulted in Australia emerging as a major world producer of a range of mineral commodities. The current contribution to the nation
Jan 1, 1994
-
Super-Scavenging of zinc Residue by the FASTFLOT Process at Pasmico Mining, Broken HillBy Fickera M. A, Marshall S, Burgeese F. L, Burgees J, Estrina H
A new high intensity flotation process FASTFLOT was deployed to recover residual zinc from the zinc circuit tailings at Pasminco Mining's Concentrator, Broken Hill. Performance of the FASTFLOT
Jan 1, 1995
-
The Influence of Energy Policy and Security Energy Supply Policy of Indonesia to Asia-Pacific Coal Distribution in 2025By A P. Wibowo
Indonesia holds a significant role in the utilisation of coal resources in the world. Although the number of Indonesian coal resources and reserves do not fall into the world’s top ten, according to 2
Nov 22, 2011
-
Re-defining Compliance Planning through data integration and ultra-short-term schedulingBy C Fong
Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i
Jun 22, 2022
-
A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operationsBy M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh
A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det
Nov 10, 2020
-
A Simultaneous Optimisation Tool for Open Pit Mine SchedulingBy Y Ren
The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents
Sep 26, 2013