A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 755 KB
- Publication Date:
- Sep 26, 2013
Abstract
The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents a new scheduling algorithm that incorporates with a novel stockpile configuration system, an improved algorithm on multiple processes and a mixed-integer linear programming (MILP) global optimisation model. It can simultaneously optimise stockpiles, blending, multiple processes as well as multiple mines. In addition, it allows the user to interact with the solution to adjust the solution to be practical and desirable.CITATION:Ren, Y, 2013. A simultaneous optimisation tool for open pit mine scheduling, in Proceedings World Gold 2013 , pp 427-432 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation
APA:
(2013) A Simultaneous Optimisation Tool for Open Pit Mine SchedulingMLA: A Simultaneous Optimisation Tool for Open Pit Mine Scheduling. The Australasian Institute of Mining and Metallurgy, 2013.