Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development Of A High Blow Energy Hydraulic ImpactorBy Wm. Ross Wayment, Innes P. Grantmyre
INTRODUCTION It has been recognized for some time that major changes in mining methods will be required in the near future. Two types of factors contribute to this need for change. Intrinsic factor
Jan 1, 1976
-
Using GIS To Identify High Value Areas In Large Coal ResourcesBy J. Kern, T. F. Torries
Identifying high value areas of unmined coal when large quantities of coal are available relative to annual markets is difficult because of the uncertainty of when the coal is to be mined. A GIS based
Jan 1, 1999
-
Effect of Energy Input in a Ball Mill on Dimensional Properties of Grinding Products Mining, Metallurgy and Exploration (ae8cfff1-b751-4d86-abdc-8b6709becb73)By Evangelos Petrakis, Kostas Komnitsas
This study investigates the evolution of dimensional properties of grinding products, namely, the mass, the surface area, the length, and the number of particle distributions with the energy input in
-
Effect of Energy Input in a Ball Mill on Dimensional Properties of Grinding Products Mining, Metallurgy and ExplorationBy Evangelos Petrakis, Kostas Komnitsas
This study investigates the evolution of dimensional properties of grinding products, namely, the mass, the surface area, the length, and the number of particle distributions with the energy input in
-
New Developments In Flow And Pipe Management Capabilities Through New Velocity Profile Measurement And Pipe Wall Wear Monitoring Instrumentation - Preprint 09-006New developments in the non-invasive and real-time measurement of the velocity profile of slurry flow in horizontal pipes will be described. This information can be used to determine the approach and
Jan 1, 2009
-
Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New ZealandBy Don F. Macfarlane
This paper describes the field application of the NTH fracture classification to rock encountered in the construction of the 9.6 km long, 10m diameter, Second Manapouri Tailrace Tunnel. Excavation of
Jan 1, 2008
-
Engineering Geology and Cavern Design for New York CityBy Christopher Snee
??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999
Jan 1, 2008
-
Analysis Of A Dense-Medium Separator For Coarse Coal Separation Using Computational Fluid DynamicsBy F. F. Peng
The raw-coal feeding system and the upward medium current flow in a dense-medium vessel (DMV) are, in addition to the residence time of particles in the separator, important factors for efficient coar
Jan 1, 2007
-
Benefits of Early Collaboration Between Designers and Suppliers in Tunnel DesignBy Günther M. Volkmann
Continuous developments in tunneling require knowledge transfer between designers and suppliers to optimize the application of support systems. This collaboration allows the designer access to the lat
Jan 1, 2008
-
Numerical Investigation of the Effect of a Novel Wet Scrubber on Dust Reduction in an Underground Coal Mine Mining, Metallurgy and Exploration (330345b3-631c-4721-bb65-792de9742b60)By Thomas Novak, Sampurna Arya
Controlling dust generation and keeping it below permissible limits to meet federal dust standards at the working face of a roomand-pillar coal mine is a challenge for a mine operator. With the recent
-
Lyon–Turin Long and Deep Railway Tunnel ProjectBy P. Fauvel, V. Nasri
In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over
Jan 1, 2005
-
IH-635 (LBJ Freeway) Corridor Section 4-West Traffic TunnelsBy Matthew E. MacGregor, Hugh T. Kelly
I.H. 635 (LBJ Freeway) was constructed as a loop freeway around the city of Dallas in the late 1960s and early 1970s with a design capacity of 160,000 vehicles per day (vpd). Today’s facility is carry
Jan 1, 2005
-
Application of Ground Freezing for Underground ConstructionBy Helmut Hass, Michael S. Shultz
For many tunneling, deep shaft and deep excavation projects ground freezing is one of the best if not the only technique available to create a watertight and load bearing temporary support system in s
Jan 1, 2005
-
Structural Geologic Mapping to Identify Controls on Ground Instability in Surface and Underground Limestone MinesBy S. E. Phillipson
During the course of evaluations by the Mine Safety and Health Administration’s Roof Control Division, the controls on ground instability were investigated at surface and underground limestone mines t
Jan 1, 2006
-
Rapid Excavation Using Trackless TechniqueBy S. P. Lewis, R. L. Sundeen
Most of us are aware of the ever increasing use of underground space. At the Advisory Conference on tunneling in Washington, D. C. in June of 1970, the demand for construction oriented tunneling durin
Jan 1, 1974
-
St. Cloud Mining Company’s Stone House Zeolite Mine And New Uses For ClinoptiloliteBy G. S. Austin
The St. Cloud Mining Company extracts clinoptilolite about 6.5 km south of Winston, Sierra County, New Mexico. Production is about 18,000 mt/year. Natural zeolites are good adsorbents for positively c
Jan 1, 2002
-
Reliability of Conventional Ground SupportBy Davorin Kolic, Harald Wagner
Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar
Jan 1, 2001
-
Alternative Contracting Methods?An UpdateBy John Reilly
The author?s paper at RETC 2007, ?Alternative Contracting Methods? addressed strengths and weaknesses of DBB+DB and introduced Construction Manager/General Contractor (Portland model) and Alliancing (
Jan 1, 2008
-
NATM/SEM Analyses for San Francisco?s Transbay Extension TunnelBy Steve Klein
The Transbay Downtown Extension (DTX) in San Francisco involves the construction of a large-span tunnel with a width ranging from 43 to over 60 feet. The tunnel will be excavated using the New Austria
Jan 1, 2008
-
Northeast Interceptor Sewer Case HistoryBy Brett Zernich, Michael Krulc, Brett Robinson
This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade
Jan 1, 2005