NATM/SEM Analyses for San Francisco?s Transbay Extension Tunnel

Society for Mining, Metallurgy & Exploration
Steve Klein
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
636 KB
Publication Date:
Jan 1, 2008

Abstract

The Transbay Downtown Extension (DTX) in San Francisco involves the construction of a large-span tunnel with a width ranging from 43 to over 60 feet. The tunnel will be excavated using the New Austrian Tunneling Method (NATM), also known as the Sequential Excavation Method (SEM), in highly fractured and sheared rock. This paper discusses the FLAC (Fast Lagrangian Analysis of Continua) analyses that were completed for conceptual design of the tunnel support system and to develop surface settlement estimates for the evaluation of measures to protect existing buildings located above the tunnel from damage.
Citation

APA: Steve Klein  (2008)  NATM/SEM Analyses for San Francisco?s Transbay Extension Tunnel

MLA: Steve Klein NATM/SEM Analyses for San Francisco?s Transbay Extension Tunnel. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account