Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Power23.1-SOURCE, POWER-SYSTEM ELEMENTS A. J. T HUM Basic considerations in providing power for mine production and collateral operations are: 1. Mining operations of any size normally use electric m
Jan 1, 1973
 - 
                    
                Molybdenite Polytypism and its Implications for Processing and Recovery: A Geometallurgical-Based Case Study from the Bingham Canyon Mine, UtahBy C. R. McClung
"Molybdenum, in the form of molybdenite, is a common byproduct of many copper mining and concentrating operations. Contrary to most copper sulfide minerals where recovery is principally liberation con
Jan 1, 2016
 - 
                    
                Statistical Analysis Of Results On Miners’ ExposureBy M. Tirmarche, J. Brenot, J. W. Piechowski
INTRODUCTION Statistical analysis of results obtained by workers survey is very often limited to the determination of the collective dose and mean annual values. This information is not sufficent b
Jan 1, 1981
 - 
                    
                Interaction Between Iron Oxides and Olivine in Magnetite Pellets During Reduction at 500°-1,300° CBy P. Semberg, B. Bjorkman, C. Andersson
"In this study, the interaction between magnetite and the additive olivine was studied after oxidation as well as after isothermal reduction at temperatures in the 500º-1,300º C range. In the olivine
Jan 1, 2015
 - 
                    
                Outlook For Graphite And Graphite TechnologyBy Gerard P. Hand
The use of graphite in industrial applications is one of the oldest in the world. Yet, it is one of the fastest-changing technologies today. Graphite was first used centuries ago in developing writing
Jan 1, 1997
 - 
                    
                Development of a Computational Fluid Dynamics Model for the Design of Pneumatic Dust Sampling DeviceBy V. Duddempudi, B. Goertz, J. Brune, G. Bogin, F. S. Barreto
"INTRODUCTION In designing a new pneumatic Dust Sampling Device (DSD) for coal mines, it was essential to analyze the air and particle flow inside the device in detail using Computational Fluid Dynami
Jan 1, 2016
 - 
                    
                Using Tracers To Evaluate The Design Of An In-Situ Leach Cell In Abandoned Mine And Mill Wastes At The Kellogg, Idaho Superfund SiteBy Jr. Kirschner
An abandoned waste impoundment located within a portion of the Kellogg, Idaho Superfund site constitutes a field research area for studying the feasibility of recovering heavy metals in-situ from unsa
Jan 1, 1993
 - 
                    
                North Auckland Line—Tunnel Refurbishment - RETC2021By Shu Fan Chau, Innes Duncan, Harry Asche, Bill Newns
The North Auckland Line (NAL) in Northland, New Zealand, is being upgraded to pass Hi-Cube containers. The line includes many tunnels and bridges which need to be refurbished to improve structural cle
Jun 13, 2021
 - 
                    
                Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024By Rob Herr, Irwan Halim, Heather Marsh
This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap
Jun 23, 2024
 - 
                    
                Amtrak East River Tunnels Structural Repairs and Reconstructions - NAT2022By Daniel McNamee, Wern-ping N. Chen
The Amtrak East River Tunnels include four tunnels, Line 1 to Line 4, which extend from New York Penn Station in Manhattan, under the East River to Sunnyside Yard in Long Island City. Since fall 2015,
Dec 1, 2022
 - 
                    
                Long Distance Tunnelling: Challenges and Trends - NAT2022By Karin Bäppler
Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct
Dec 1, 2022
 - 
                    
                Tunneling to Manage Construction Impacts for Albany’s Beaver Creek Clean River Project, Albany, New York - RETC 2021By Greg Bold, Mahmood Khwaja, Yuannian (Jerry) Wan, Michael S. Schultz, William Simcoe
Beaver Creek Clean River Project will satisfy the consent decree requirements by capturing and treating combined sewage overflows. The project consists of, approximately, 2,700 feet of 30-inch trenchl
Jun 13, 2021
 - 
                    
                Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022By John Newby, Edward Kennedy, Ulf Gwildis
Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi
Dec 1, 2022
 - 
                    
                Newmont Gold Company Refractory Ore Plant Selection of a Dry Grinding ProcessBy Trent A. Tempel
In 1989 Newmont Gold company initiated a project to develop a treatment process for higher grade refractory gold ores to be mined from deposits along the Carlin Trend in Nevada. Extensive laboratory a
Jan 1, 1993
 - 
                    
                Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe
Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon
Dec 1, 2022
 - 
                    
                TBM Tunneling Between the Westridge Marine Terminal and the Burnaby Terminal in British Columbia - NAT2024By Jeff Reid, Mohamed Maghari, Nicholas Joens
The Burnaby Mountain Tunnel was an integral part of the Trans Mountain Expansion Project. General Contractor, Kiewit Ledcor TMEP Partnership (KLTP), contracted with McNally Construction to build an un
Jun 23, 2024
 - 
                    
                Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023By Jacob L. Mathis, Todd Tharpe, Jonathan Steflik, R. M. True
In June 2022, Louisville MSD completed a 6.5 km (4-mile), 6.1 m (20-foot) finisheddiameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. Durin
Jun 13, 2023
 - 
                    
                Underground Precautionary BulkheadsBy T. L. Heisler
The Cigar Lake project, located in northern Saskatchewan (Figure 1), is one of the world?s largest high grade uranium deposits, with reserves of 150 million kilograms of uranium in a deposit averaging
Jan 1, 1992
 - 
                    
                Innovative TBM Launching in Urban Areas - RETC2023By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023
 - 
                    
                A Mining Safety And Health Program In China: An ILO PerspectiveBy T. B. Szwilski
The paper gives an account of the development of a mine health and safety program in China from 1987 to 1996. The project was funded by the United Nations Development Program and managed by the Intern
Jan 1, 1998