Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 189 KB
- Publication Date:
- Jun 13, 2023
Abstract
In June 2022, Louisville MSD completed a 6.5 km (4-mile), 6.1 m (20-foot) finisheddiameter
CSO conveyance and storage tunnel system located along the Ohio River in
downtown Louisville, Kentucky. During construction, the Ohio River Tunnel alignment
was expanded 2.4 km (1.5 miles) into areas where natural gas was detected. Without
delaying construction, the project team developed and implemented a natural gas risk
mitigation strategy to safely excavate the tunnel via TBM and install concrete lining.
The risk mitigation strategy included the installation of gas-vent borings, increased
tunnel ventilation, retrofitting tunneling equipment for “gassy” operations, and modifying
the project specific HASP.
Citation
APA:
(2023) Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023MLA: Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023. Society for Mining, Metallurgy & Exploration, 2023.