Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Reliability Of Pile Prediction Methods - Summary
By M. T. Davisson
Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)
Jan 1, 1991
-
Quality Control Of Augered Cast-In-Place And Displacement Piles ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and augered displacement (AD) piles since the pile is
Jan 1, 2002
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions
By John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Underpinning Atlanta International Airport Concourse E for APM Tunnel Extension
By Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith
"Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access
Jan 1, 2017
-
Micro-Biological Attack On Deep Foundation Concrete
By Piotr D. Moncarz
As major urban areas begin to run out of "good-terrain" for their expansion, they begin to claim high water-table areas within or adjacent to water fronts or swamps. Similarly, major infrastructure pr
Jan 1, 2002
-
Augered Cast-In-Place Pile Manual (Model Specification with Commentary)
"Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst
Jan 1, 2016
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project
By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary Foundations
By Brian D. Barkauskas, Terence P. Holman
A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr
Jan 1, 2017
-
Lateral Load Tests On Drilled Piers In San Diego Area Residual And Formational Soils
By Kul Bhushan
This paper presents the results of lateral load tests on 0.61-m to 1.27-m (24 to 50-inch) diameter drilled and cast-in-place piers in San Diego area residual/formational soils. The test piers were ins
Jan 1, 2002
-
The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the Netherlands
By Paul M. C. B. M. Cools, Martin Th. van Staveren
In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i
Jan 1, 2017
-
Large Diameter Helical Piles for Refinery Expansion
By Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
1785 Massachusetts Ave. NW, Washington, D.C.
By Daniel Stevenson, Richard Guenther
"The preservation of historic buildings is not only essential to the understanding of our national heritage, but it is also environmentally responsible to adapt existing buildings to compatible new us
Jan 1, 2017
-
Numerical Study On Uplift Capacity Of Helical Pile Embedded In Clay
By Muttharam M, Karthick Kumar V
Helical piles foundation systems have been extensively used in engineering application. It is commonly adopted to resist the compression, uplift force, overturning moment and lateral forces. Helical p
Nov 1, 2022
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile Method
By Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017
-
Hydraulic Drive Head Performance Curves for Prediction of Helical Pile Capacity (2653dc4c-cfa1-4dd3-965e-5e0ef0346ada)
By Donald Deardorff
"Helical piles often rely on the final installation torque for ultimate capacity verification. When helical piles are designed using traditional bearing capacity equations for deep foundations and fie
Jan 1, 2017
-
Hydraulic Drive Head Performance Curves For Prediction Of Helical Pile Capacity
By Donald Deardorff
Helical piles often rely on the final installation torque for ultimate capacity verification. When helical piles are designed using traditional bearing capacity equations for deep foundations and fie
-
Innovative Non Encroaching Retaining Wall
By Dino Kartofilis, Rick Deschamps, Giovanni (John) Bonita
"Anew condominium complex in Arlington, Va., presented some formidable constraints. One was the requirement for a permanent retaining wall to support a 48.5-ft (15-m) cut and an existing 16- story bui
Jan 1, 2009
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology
By Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method
By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019