Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Monitoring Railroad Response To Mining Subsidence And Assessment Of Subsidence Effects On On Railroad - A Case StudyBy Yi Luo
The responses of a section of railroad to ground subsidence process was monitored as it was undermined by a longwall panel. The subsidence data collected and the observations made through this monitor
Jan 1, 1994
-
The Introduction of Roof Bolting to U.S. Underground Coal Mines (1948-1960): A Cautionary Tale (fc50b3c4-830d-49aa-a1be-7477dcdf44ae)By Chris Mark
Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940's and 1950's. From an engineering stand
Jan 1, 2002
-
Introducing the New Windows ARMPS-LAM ProgramBy Keith Heasley, Christopher Newman, Zach Agioutantis
"Previously, in 2013, a laboratory version of the computer code ARMPS-LAM, introduced at the 32""d International Conference of Ground Control in Mining, successfully integrated the laminated overburde
Jan 1, 2016
-
Determination Of Basis For The Double Use Of Rectangular Rockbolted Roadways In The D/C Seam At The Auguste Victoria MineBy Karl H. Brandt
In the Auguste Victoria mine a bolted rectangular roadway has been kept open for the first time in the seam D/C after retreat. The target of the project was to gain a basis for planning and experie
Jan 1, 2001
-
Flexibolt Flexible Roof Bolts: A New Concept For Strata ControlA high strength steel strand bolt has been developed by Barrett, Fuller & Partners as a replacement for conventional rigid bars for primary roof support in coal mines. It is based on a 23mm diameter m
Jan 1, 1993
-
Application Of Ground Penetrating Radar To Evaluate The Extent Of Polyurethane Grout Infiltration For Mine Roof Control - A Case StudyBy William Monaghan
Over the period 2000 to 2003, roof falls have accounted for 4 to 14% of the fatalities in underground mining operations. The National Institute for Occupational Safety and Health (NIOSH) is conducting
Jan 1, 2004
-
Characterization Of Overburden Response To Longwall Mining In The Western United StatesBy Khamis Y. Haramy
The U.S. Bureau of Mines installed surface and subsurface instruments at a mine site in Colorado to monitor and characterize the overburden response to longwall mining. Instrumentation included a time
Jan 1, 1992
-
Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NMBy P. E. Christensen
Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f
Jan 1, 1998
-
Implementation and Evaluation of Roof Bolting in MICARE Mine IIBy Gustavo Herrera Rico
As part of a general effort to increase safety, efficiency, and profitability of its mining operations, MICARE personnel with the support of NorWest Mine Services, Inc. determined that the key to impr
Jan 1, 1997
-
Rock Mechanics and the Analysis of Underground Mine Stability Adjacent to Coal Refuse ImpoundmentsBy David Newman
Coal refuse impoundments and underground mines are frequently sited in close vertical and horizontal proximity in the valleys of the Southern Appalachian coalfield. The steep V-shaped valleys provide
Jan 1, 2003
-
Manifestation Of Mine Pressure And Its Relations To Overlying Strata MovementsBy Z. C. Song
[THIS PAPER WAS TRANSLATED FROM CHINESE TO ENGLISH BY S. S. PENG, WEST VIRGINIA UNIVERSITY] Immediately after coal extraction, the pressure that causes the movement of the surrounding strata is c
Jan 1, 1982
-
Pillar Design In Bump-Prone Deep Western U.S. Coal Mines (e849bf38-924c-4a19-8729-5910f69616a3)By N. P. Kripakov
This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north-central Utah coalfiel
Jan 1, 1992
-
Engineering Methods For The Design And Employment Of Wood CribsBy Thomas M. Barczak
Wood cribs are used extensively to stabilize mine openings by providing resistance to deflections of the immediate roof and floor and by supporting the weight of unstable rock masses. While the unit c
Jan 1, 1993
-
Methods To Determine Pillar Stress Distribution And Its Effect On StabilityBy David P. Conover
The effects of stress distribution on pillar stability were evaluated through rock mechanics studies conducted in three underground room-and-pillar coal mines. Results of the three field instrumentati
Jan 1, 1989
-
Evaluation of Instrumented Cable and Rebar Bolts as Ground Support at a Trona Mine (958ba3b7-4ed1-4b81-9815-5e4d6ebd9ea2)By Lewis A. Martin
Instrumented cable bolts developed at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health were used in conjunction with existing ground control systems to moni
Jan 1, 2001
-
New Methods and Technologies of Roofbolting in Australia Coal MinesBy Mictck Rataj
Methods of rock reinforcement in Australian coal mines are being advanced progressively through the better understanding of rock failure mechanisms around roadways and the-development of improved bolt
Jan 1, 1997
-
Aerostatic Support System For Underground Coal MinesBy R. J. Morrell
The Bureau of Mines developed a ground support system for use with an underground coal auger. The system consists of inflatable airbags that are inserted in the holes as they are drilled, and then gra
Jan 1, 1988
-
Pillar Collapse at Welgedacht Colliery, South Africa: A Case StudyBy J. Nielen van der Merwe
During the process of pillar extraction at the Welgedacht Colliery, an unexpected pillar collapse resulted in the entrapment of equipment. The area was visited soon after the event to evaluate the sta
Jan 1, 1999
-
Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)By Marc T. Filigenzi
Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can
Jan 1, 1997
-
Formation of Face Headings Using Stress Relief at Asfordby MineBy John Cassie
The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la
Jan 1, 1997