Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Quality Assurance in the Processing of Mining-Induced Subsidences and Research Work Into Mining Subsidence Engineering in the German Hard Coal Industry

    By Peter Fischer

    Between 45,000 and 50,000 claims for subsidence are submitted each year to the German hard coal industry. In order to improve the service to claimants a quality management was established in 2005. Thi

    Jan 1, 2006

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • SME-ICGCM
    Practical Strata Management, Beltana No. 1 Mine, Australia

    By Shane McDonald

    Australia produces approximately 84 million tonnes of coal per annum from 30 longwalls in New South Wales and Queensland, operating at an average depth of around 300m. Industry trends and expectations

    Jan 1, 2008

  • SME-ICGCM
    The Evolution of Intelligent Coal Pillar Design: 1981-2006 (550072c4-5cb4-4845-a20b-da35141e93d6)

    By Christopher Mark

    The first International Conference on Ground Control in Mining opened with the topic of pillar design. Two classic papers were presented, one by Bieniwski and the other by Wilson. Unfortunately, the

    Jan 1, 2006

  • SME-ICGCM
    Strata Movement of Protective Seam Mining with Large Interburden ?? A Case Study

    By Changsheng Song

    With increasing depth of coal mining in China, the number of coal and gas outbursts has been increasing for years. By means of destressing the protective seam, the gas in the protected seam is drained

    Jan 1, 2008

  • SME-ICGCM
    Empirical Mine Design for Western Underground Metal Mines

    By Thomas M. Brady

    The Spokane Research Laboratory/NIOSH and the University of British Columbia (UBC) geomechanics group are focusing on the development of safe and cost-effective underground design guidelines for weak

    Jan 1, 2006

  • SME-ICGCM
    A Review of Effective Parameters on Roof Fall During Retreat Mining in Room and Pillar Coal Mines

    By Ebrahim Ghasemi

    Problem statement: One of the most challenging safety problems in room-and-pillar coalmines is controlling roof falls during retreat mining. Roof falls not only cause both fatal and non-fatal injuries

    Jan 1, 2012

  • SME-ICGCM
    Behavior of Welded Wire Mesh Used for Skin Control in Underground Coal Mines

    By Murali M. Gadde

    Welded wire mesh is the most commonly used skin control technique in the United States underground coal mines. Currently, selection of the mesh is based on trial and error rather than any rigorous des

    Jan 1, 2006

  • SME-ICGCM
    Calibrating the Lamodel Program for Site Specific Conditions

    By Keith A. Heasley

    The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine

    Jan 1, 2012

  • SME-ICGCM
    Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study (d1d3dd49-2f0a-44af-8ddf-69de3f441c2d)

    By Anthony Iannacchione

    A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990?s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outbur

    Jan 1, 2007

  • SME-ICGCM
    Overmining In Kailuan, China Mining Area (d9eb7d79-18c1-4a77-a59a-53706a90764b)

    By Jun Han

    Coal has been mined in the Kailuan mining area for more than 130 years. The remaining reserves consist of, in large part, coals that would have been considered economically unminable or technically no

    Jan 1, 2009

  • SME-ICGCM
    An Innovated Self-Screwed Tube Bolting System(STBS) To Reinforce Stability Of Mine Entries (b3995592-5744-4f95-89d6-4030a00b69b4)

    By Xingtian Hui

    Due to variation in the geological natures of underground coal mines, especially when the entry?s roof/floor are soft and weak, it is vital to select an appropriate roof bolting system to ensure entry

    Jan 1, 2009

  • SME-ICGCM
    Multiple Seam Interactions of Relatively Shallow, High Seam Shortwalls in South Africa

    By John Latilla

    Exxaro Mining?s Matla Coal situated in Mpumalanga, South Africa operates two shortwall faces on the No 4 and No 2 seam while the No 5 seam has also been longwalled in the past. Severe strata loading e

    Jan 1, 2007

  • SME-ICGCM
    Extraction of Hard Coal Close to a Shaft

    By Peter Fischer

    Reducing mining costs has become such an important factor in the German coal industry that operators are forced to work only those areas where production costs can be kept low. These areas will normal

    Jan 1, 2007

  • SME-ICGCM
    Proposed Laboratory Quality Control Test Method for Resin Capsules Used in Underground Mines in South Africa

    By Dave Minney

    The South African mines health and safety regulations require that mine management establish a quality management system for rock support material. Quality control of resin capsules used as a support

    Jan 1, 2007

  • SME-ICGCM
    Mine Seals ? A Rational Base for Design and Construction

    By Kot Unrug

    Mine seals are necessary in nearly every mine to isolate mined-out areas from the ventilation network. There is a large number of seals in active mines and that number continually increases as the de

    Jan 1, 2008

  • SME-ICGCM
    A First Step in Developing Standing Roof Support Design Criteria Based on Ground Reaction Data for Pittsburgh Seam Longwall Tailgate Support

    By Thomas Barczak

    Roof support systems are designed for roof control to prevent unplanned falls. It sounds logical and has been the conventional thinking in support design since supports were first installed. In orde

    Jan 1, 2008

  • SME-ICGCM
    Overburden Subsidence Characteristics When Mining in Weak Rocks and Subject to Special Mining Conditions

    By Wenquan Zhang

    Based on the mining and geological conditions of Wadong Mine, Longkou City, Shandong Province, China, a viscoelastic model with proper creep parameters was established. The 3-D ANSYS was used to simul

    Jan 1, 2006

  • SME-ICGCM
    25 Years of Ground Control Developments, Practices, and Issues in Australia

    By Bruce Hebblewhite

    This paper recognises the 25th year of the Morgantown International Ground Control in Mining Conference, by offering a twenty five year review of ground control in the Australian mining industry ? pri

    Jan 1, 2006

  • SME-ICGCM
    Numerical Simulation of Reinforced Concrete Mine Seal Subjected to Explosion Loading

    By Khaled Morsy

    The tragic incidents at Sago and Darby coal mines in 2006 pointed out the need for stronger seals to resist the blast effects of violent gob explosions. Mine Safety and Health Administration (MSHA) ha

    Jan 1, 2008