Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Bearing Capacity Of Rock Which Must Support Pit PropsBy Nicholas Chlumecky
A practical method is described for determining or checking whether underground supports such as props, posts and mechanized longwall supports have bearing areas of proper size in relation to the type
Jan 1, 1967
-
Experimental study on suppression of lithium-iron-phosphate battery firesBy Richard A. Thomas, Liming Yuan, Wei Tang, JOHN SOLES
Lithium-ion (Li-ion) battery applications are increasing for battery-powered vehicles because of their high energy density and expected long cycle life. With the development of battery-powered vehicle
Aug 1, 2024
-
Risk Management of Long and Deep Tunnels—The European ExperienceBy Yves Boissonnas, Marco Bettelini
"INTRODUCTION AND OBJECTIVES The operational safety of long and very long rail tunnels represents a key issue in all development stages, including design, construction, commissioning and operation. Th
Jan 1, 2016
-
Overcoming Underground Mining Space ConstraintsWhen most people think of coal mining, they envision men in soot-covered clothes and hard hats digging at deposits in deep underground caverns. These mental images commonly include coal cars rumbling
-
New Approaches and Technology for Tailings Pipeline Design and OperationBy J. Stowe
"While there has been continual improvement in the models for predicting deposition velocity and pipeline friction losses, the fundamental design philosophy for tailings pipelines has remained the sam
Jun 1, 2019
-
A Novel Computational Approach Towards The Mill Matrix Of Distributed Comminution ModelsBy R. K. Mehta
An accurate, efficient and stable computation of the mill matrix function (eAt) is needed where mill matrix (A) is a real general matrix. Two important modeling cases in comminution where such need ar
Jan 1, 1992
-
Bringing The Entrepreneurial Mindset Into Mining Engineering EducationBy Rudrajit Mitra, Erik Hulthen, AARTI SORENSEN, TOBIAS HARTMANN, ELISABETH CLAUSEN
There has been an ongoing debate on how to transform engineering education to better prepare students for today’s professional world that is characterized by increasingly complex problems and challeng
Sep 1, 2022
-
Optimization of Surface Mining Dig Limits with a PracticalHeuristic Algorithm Mining, Metallurgy and ExplorationBy Y. V. Vasylchuk
This paper presents an algorithm for optimizing the classification of surface mine material subject to excavating constraints. High-resolution expected profit models are input and optimized to classif
-
P3 Delivery for the I-75 Storage and Drainage Tunnel, Detroit, Michigan - NAT2024By Jerry Luttman, Mark Dubay, Anvesha Dogra, Elizabeth Dwyre, Wei Hu
The I-75 Modernization Project (Segment 3) just north of Detroit, MI is being delivered as a Design-Build-Finance-Maintain (DBFM), which is a Public Private Partnership (P3). The project includes desi
Jun 23, 2024
-
Controlling Open-Pit Slope Failures At Shirley Basin Mine ? IntroductionBy John T. Atkins
Utah International's Shirley Basin Mine is located in the Southeastern High Plains of Wyoming at an elevation of about 7,100 feet. The Shirley Basin area is a gently rolling semi-arid land. The u
Jan 1, 1973
-
Engineering of Cooks Lane Tunnel: An overview of challengesBy V. Nasri, S. Rashidi
The Baltimore Red Line Project is a proposed 22.7-km (14.1-mile) long east-west light rail transit (LRT) line envisioned to connect the areas of Woodlawn, Edmondson Village, West Baltimore, downtown B
Jan 1, 2014
-
Structural Design of Composite Shell LiningsBy Johannes Jäger
"A composite shell lining typically consists of an outer permanent sprayed concrete shell, a water proofing layer and an inner sprayed or cast concrete shell. Composite shell linings become more and m
Jan 1, 2016
-
Potash At Salt Springs New BrunswickBy John P. Anderle
A tectonically disturbed sequence of Mississippian age evaporites expressing a 5 milligal negative gravity anomaly near Sussex in southeastern New Brunswick, Canada, was investigated by a program of d
Jan 1, 1978
-
Evaluation of Engineering Controls at Bagging Operations to Reduce Exposures to Respirable Crystalline Silica Dust "Mining, Metallurgy & Exploration"By Justin R. Patts, Andrew B. Cecala, A. KYLE LOUK, Emily J. Haas
The National Institute for Occupational Safety and Health (NIOSH) and the former U.S. Bureau ofMines (USBM) have given a significant effort over the past four decades in researching and developing eng
Apr 3, 2020
-
Production Men And Operations Analysis: Two Strategies Of AcceptanceBy Gordon O. Prickett
In two case studies we look at strategies of acceptance that the analyst can employ to gain entrance and to see his problem solution out to use. The first example comes from metal mines. The problem a
Jan 1, 1978
-
Mechanical Versus Manual Shotcrete Application in Underground Construction - RETC2021By Lauro Lacerda
Shotcrete is a highly adaptable and widely used underground construction material at infrastructure and mining projects around the world. In fact, many projects could not have been completed without i
Jun 13, 2021
-
Loss Prevention In The Processing Of High-Value MaterialsBy Allen G. Taylor
High-value materials, such as gold, platinum and other precious metals, are subject to loss through unauthorized removal from mines, smelters, refiners and other places where such materials are proces
Jan 1, 2012
-
Cadril, The Introductory Cad Program For Minor Size MinesBy Zvonimir Jam?ek
In Rudarski Institut Ljubljana (RIL), i.e. Ljubljana Mining Institute, we have developed CADRIL, a smaller CAD package which purpose is to overcome the difficulties by introducing Computer Aided Desig
Jan 1, 1992
-
Effects of obstructions, sample size and sample rate on ultrasonic anemometer measurements underground - SME Transactions 2011By C. D. Taylor, A. L. Mazzella, A. L. Martikainen
In fluctuating airflow, continuous air velocity recording is the most reliable method of air velocity measurement. It allows for fast recognition of changes and the calculation of long-term averages.
Jan 1, 2011
-
Use of a GBR to Deliver Risk Management and Value— City Rail Link, Auckland - RETC2021By Tom Ireland, Sumi Eratne
The approach to Risk Management during the procurement of major projects often has a significant outcome on the ultimate successful delivery of a project. The $NZ4.4B Auckland City Rail Link project i
Jun 13, 2021