Blast Design for Fragmentation of Anisotropic Rock Mass in Surface MinesBy K Ramachandra Rao
Joints, fractures and other structural defects bring anisotropic character Into a rock mass. Conventional methods of blast design In a rock mass consisting phyllites, mica schist etc., which are chara
Jan 1, 1995
-
Pattern Expansion Optimization Model Based on Fragmentation Analysis With Drone TechnologyBy Francisco Sena Leite, Thomas Palangio, Vinicius Miranda
With an increasing pressure to find efficiencies in the mining industry, operations are looking for continuous improvement tools to validate blasting procedures, a crucial and often overlooked area of
Jan 1, 2018
-
Large Cast Blasting Programs Require Design FlexibilityBy Jeff Wachendorf
As the title implies, this paper details the start of a cast blasting and the design flexibility required to satisfy different parameters encountered on a large coal mine employing cast blasting as th
Jan 1, 2015
-
Blast Induced Vibrations in MalmbergetBy Anders Nordqvist
LKAB operates an underground iron ore mine in Malmberget in the northern part of Sweden. Twelve different orebodies are mined today using both longitudinal and transversal sublevel caving as mining me
Jan 1, 2018
-
Application of 3-D Plots and Regressions to Blast Vibration Analysis - Defining a Site-Specific Form of the Charge Weight Scaled DistanceBy Ruilin Lang
This paper presents an application of 3-D plots and non-linear regressions to define a sitespecific form of the charge weight scaled distance. The PPV (PPA) of single hole blasts is normally considere
Jan 1, 2006
-
Underwater Blast Pressure Monitoring for the Columbia River Channel Improvement ProjectBy Cathy Aimone-Martin, Kristin Dunlap Kolden
Blasting was conducted for the Army Corps of Engineers (Corps) in the Columbia River near Saint Helens, Oregon during 2009 and 2010 to deepen the navigation channel as a final phase of a dredging proj
Jan 1, 2014
-
The Bubble MysteryBy Richard Dooley
This paper is one sided because it presents the problem, but not the solution. The problem of blisters (bubbles) and occasional tears in caisson liners occurred when blasting and we have not found a c
Jan 1, 1983
-
New Aspects of Shock Waves in Underwater BlastingBy Zoltan Susanszky
The total available energy in an explosive charge is seldom fully utilized in industrial operations. For this reason more explosive is normally used to perform a job than we would calculate. In an exp
Jan 1, 1976
-
A Rational Method for Predicting Damage to Historical Structures Subjected to Blasting VibrationsBy Kenneth Medearis
The accurate prediction of possible damage to historic structures subjected to blasting-related ground motions is not infrequently the dominant factor in whether or not a mining or quarrying operation
Jan 1, 1993
-
Various Methods of the Ground Vibration AssessmentBy Dworzak, Andrzej Biessikirski, Jozef Pyra
During the detonation process 20-30% of the energy is being consumed only on the quarrying pro-cess. The remaining amount of the energy generates harmful effects such as: shock wave, acoustic wave, fl
Jan 1, 2015
-
The Hercudet Nonelectric Delay Blasting Cap System New Developments in Field UsageBy Robert B. Hopler
The Hercudet ? Nonelectric Delay Blasting Cap System has undergone significant changes since the last paper on the subject was presented at the 1978 S.E.E. Conference. The changes have been made to im
Jan 1, 1980
-
Removal of the Top of an Aged Water Supply Reservoir By ExplosivesBy Chuck Kliche, Bill Clements
This project involved the removal of the top of an old water supply reservoir tank for the City of Lead, SD by explosives. The general contract called for the removal of the concrete top without damag
Jan 1, 2007
-
E7B Sector Drilling and Blasting Challenges and LearningsBy Robert Jacob Cefalo, Rio Tinto Kennecott
At the end of 2016, the Mine started a new ore phase in the section of the pit located on the East Wall. The East Wall geological structures required controlled blasting for peak particle velocity (PP
Jan 1, 2019
-
Experiences and Applications with Wassara Water Hydraulic Down Hole Drilling SystemsBy Graeme Exelby
The 4" Wassara water hammer was originally developed by G-Drill AB together with Swedish Mining Company LKAB for their underground long hole production drilling. Sandvik Rock Tools AB is responsible f
Jan 1, 1998
-
Bingham Canyon Mine-Blasting Through and Next to Active UndergroundBy Robert Cefalo
Drill and Blast Engineer Abstract In 2019, the Bingham Canyon Mine, owned by Rio Tinto Kennecott Utah Copper Company, mined through the active underground that dewaters the pit. The active underground
-
Design Criteria for Sequential BlastingBy A B. Andrews
The use of sequential blasting techniques that combine surface and in-thehole delays has provided blasters with increased flexibility in blast design to promote good rock fragmentation and displacemen
Jan 1, 1981
-
Splitting Granite Using PyrodexBy G Dean Barrett
Just one year ago at the 1986 Annual Meeting of the Society of Explosives Engineers, Dr. Calvin J. Konya presented a paper entitled "Presplitting Granite Using Pyrodex, A Propellant.'' Since that tim
Jan 1, 1987
-
Port of Miami Project – Protecting Marine Species During Underwater BlastingBy Terri Jordan, Kenneth Hollingshead, Mary Jo Barkaszi
The Port of Miami, Miami-Dade County, Florida (Port) is the largest container port in the State of Florida. However, it is located in the center of a diverse ecosystem. Biscayne Bay surrounds the Port
Jan 1, 2007
-
Reducing a Quarry Global Carbon Footprint through Blast OptimizationBy Pierre DePasquale, Ricardo Chavez
Lowering of quarry energy consumption participates to answer both environmental and financial issues. The “EE-Quarry” European project, supported by the European Commission (EE stands for Energy Effic
Jan 1, 2015
-
Iron Ore Company of Canada (IOCC) Blast Optimization with Emulsion ExplosivesBy M Lemieux, R Mason
The SABREX blast modeling program was introduced to I.O.C.C.'s Carol Lake Iron Ore Project in December 1987. As part of CIL's Technical Services, SABREX was used to implement an optimization program d
Jan 1, 1989