Removal of the Top of an Aged Water Supply Reservoir By Explosives

International Society of Explosives Engineers
Bill Clements Chuck Kliche
Organization:
International Society of Explosives Engineers
Pages:
10
File Size:
736 KB
Publication Date:
Jan 1, 2007

Abstract

This project involved the removal of the top of an old water supply reservoir tank for the City of Lead, SD by explosives. The general contract called for the removal of the concrete top without damaging the sides or floor of the reservoir. The option of a rock hammer was eliminated, due to the possibility of an unpredictable collapse damaging the sides or floor of the reservoir. Different blasting options were discussed between the primary contractor and the blasting contractor, along with the pros and cons of each. The primary contractor settled on the option of drilling the structure for blasting versus using shaped charges
Citation

APA: Bill Clements Chuck Kliche  (2007)  Removal of the Top of an Aged Water Supply Reservoir By Explosives

MLA: Bill Clements Chuck Kliche Removal of the Top of an Aged Water Supply Reservoir By Explosives. International Society of Explosives Engineers, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account