Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Precise Timing Influence on Fragmentation Distribution by New Modelling ProcessBy C. Partouche, T. Bernard
Blasting engineers are mainly concerned about fragmentation issues. Even further, this is the final goal of using explosives. A lot of models have been developed for controlling fragmentation distribu
Jan 1, 2002
-
A Study on the Correlation Between Delay Time and FragmentationBy Yeon-Ho Jin, Eui-Haeng Heo, Yun-Seok Park, Sung-Oong Choi, Hyung-Dong Min, Min-Su Jeong, Seung-Joong Lee
As rock fragmentation in bench blasting can affect the following process such as loading, hauling and crushing, its good control is essential for assessment of blasting efficiency and production cost.
Jan 1, 2015
-
Blast Segmentation for Vibration ManagementBy Lee Julian
Ground vibrations generated by mine blasting must be controlled to comply with legislation and to protect sensitive local or site infrastructure. The consequences of exceeding imposed limits can range
Jan 1, 2014
-
Reduction of Air Blast and FlyrockBy Don Rapp, Rufus Flinchum
Air blast and flyrock are two of the most critical concerns facing the blaster of today. This paper will provide the blaster with proven procedures for recognizing open face and bench surface problems
Jan 1, 1993
-
48 Inch Production Blast Holes in OilsandsBy Michael McDougall
"Suncor Inc. Oilsands Group, Mining Operation in Northern Alberta, Canada, has beenblasting to loosen the oilsands to increase production and decrease maintenance of the hugebucketwheel excavators for
Jan 1, 1993
-
2D versus 2D fragmentation analysis: preliminary findingsBy Michael Noy
Current image based systems used to measure fragmentation are measuring the two dimensional presentation of a set of three dimensional objects. A two dimensional measurement of fragmentation restricts
Jan 1, 1997
-
Working With Explosives Suppliers to Optimize Pit Productivity and CostsBy Thomas J. Snyder
Modern quarry management should be alert to every opportunity to improve productivity and reduce operating costs. In this paper, the author outlines areas in which explosives suppliers should be encou
Jan 1, 1988
-
Quantification of Production Quarry Blasting - the Search for the Most Effective Blasting TechnologiesBy S C. Brashear, D A. Anderson, A P. Ritter, S R. Winzer, R Broughton
Results of quarry blasts can be quantified to show the effects of controlled variables. Two studies have been carried out: one to document the effect of delay on fragmentation and the other to show th
Jan 1, 1985
-
Practical Aspects of Cast Blasting at Bulga Coal AustraliaBy Tapan Goswami, Geoff Keith
"At Bulga Coal, the objectives of drilling and blasting are to maximise safety and to minimise the totalcost of mining. A recent audit of two overburden blasts established that the standard of drillin
Jan 1, 1999
-
Vibration Monitoring and Control of Blasting Associated with the Construction of a Highway Next to a Show CaveBy Paul Worsey, Gerald Rupert, Mark Kirkbride
The realignment of Highway H in the proximity of Crystal Cave (Springfield MO.) required the development of a blasting program that was both economical and efficient for construction, yet ecologically
Jan 1, 1997
-
Vibration prediction from controlled blast testsBy Nadir Plasencia, Rogerio: Neves Mota
The evaluation of vibrations induced to build structures is one of the main concerns when dealing with blast works. EDP, the main Portuguese producer of electricity is presently incrementing energy pr
Jan 1, 2008
-
Improved Stability Through Optimized Rock BlastingBy R Holmberg, C Sjoberg, B Larsson
This paper describes the excavation of an underground naphta storage facility at Stenungsund in Sweden. The main purpose with this paper is to give an overall view of how the excavation was carried ou
Jan 1, 1984
-
Testing of Emulsion Explosive Efficiences at Different RocksBy D Vrkljan, Z Ester
There was no use of emulsion explosive at Croatia till 1997. Several attempts have been done to bear out the economical and technological affordability of applying the emulsion explosive for open pits
Jan 1, 1999
-
Improved Fragmentation and Safety with Proper Borehole Loading TechniquesBy Lars Osen
Both fragmentation and safety can be improved by following proper procedures in loading boreholes. Proper loading procedures such as primer location, borehole sealing, decking, and stemming along with
Jan 1, 1985
-
Safe, Easier, Economican - SEEBy John C. Didlinger
How do you measure the highwall? Why do you even need to know the highwall measurement? Why is it important? The importance of this measurement is to help keep a level floor and to help control vibrat
Jan 1, 1997
-
Explosives Camp – Insanity or Cold Calculation?By Paul Worsey, Barbara Robertson
In June 2007, Missouri Science & Technology (formally UMR) successfully held its 5th and 6th Explosives Summer Camps. The camps, which include substantial industry participation, have been an outstand
Jan 1, 2008
-
Pre-Blast Surveys and the Importance of Photographic TechniqueBy James Ballard, Charles H. Dowding
Recent Office of Surface Mining regulations have called for pre-blast surveys of residences within one-half mile of blasting. Unless lighting effects and the multiple origins of cracks are recognized,
Jan 1, 1979
-
Analysis of Recent Mine Blasting AccidentsBy Larry R. Fletcher
The Bureau of Mines obtained blasting accident data from the Mine Safety ant Health Administration (MSHA), U. S. Department of Labor. These data were analyzed to determine the most frequent causes of
Jan 1, 1983
-
Rock Removal Utilizing Ice Bridges in the Mackenzie River Northwest Territories, for Pipeline Trenches to Man-Made Islands a Deepening Shipping ChannelsBy William A. Travnik
For more than 60 years, ESSO RESOURCES CANADA LIMITED has been producing and refining oil at a small refinery in Norman Wells, Northwest Territories, and supplying diesel fuel and other oil products
Jan 1, 1986
-
Seismic Monitoring During Blastings of Building Pit for WTC at RijekaBy D Vrkljan, Z Ester
Excavating the building pit for the World Trade Center at Rijeka, it was necessary to blast over 160000 m3 of hard mass in fused condition. The building pit is located at a densely populated residenti
Jan 1, 1999