Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Deep Foundation Support for the Iconic New York Wheel

    By Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran

    "This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor

    Jan 1, 2016

  • DFI
    TTMJ – The New System for Slurry (Diaphragm) Wall Joints

    By Maurizio Siepi, Paul van Horn, John Coupland, Julian Crawley

    "TTMJ is the acronym for the Slurry (Diaphragm) Wall Tension Track Milled Joint currently in development as part of the European Union's innovative and far-reaching Horizon 2020 initiative (FTI Pilot-

    Jan 1, 2017

  • DFI
    Soil Mixing for the LPV-111 Levee Improvements, New Orleans: A Case History

    By Filippo Maria Leoni, George Filz, Wesley Schmutzler, Matteo Bertoni

    "The US Army Corps of Engineers selected the Deep Mixing Method (DMM) for the required stabilization at the LPV 111 Project (New Orleans, USA). DMM was used for ground improvement/foundation strengthe

    Jan 1, 2015

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Ground Improvement for Reclaimed Landfills

    By Steven E. Darnell, William W. Haasz, Brandon T. Buschmeier, Frederic Masse

    "Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill propertie

    Jan 1, 2017

  • DFI
    Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)

    By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th

    Jan 1, 2016

  • DFI
    Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway Bridges

    By Reinaldo J. Villa, Joshua C. Adams

    The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac

    Sep 8, 2021

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019

  • DFI
    Solving Variable Bedrock Challenges With Ductile Iron Piles

    By Kevin R. Johnson, Matt Caskey, Bryan Plaskett

    Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si

    Oct 1, 2022

  • DFI
    The Need For Air Control In Down The Hole Hammer Casing Advancement Drilling

    By Frank J. Purcell

    “Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou

    Nov 1, 2022

  • DFI
    Jet Grouting for Strength in Marine Sediments with Hydrocarbons

    By Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston

    Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest

    Jan 1, 2019

  • DFI
    Cutter Soil Mixing Solutions at the Leixões Cruise Terminal

    By Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio

    "The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam

    Jan 1, 2015

  • DFI
    A Seepage Control Cutoff in an Extreme Saline Environment

    By Kevin Green, Iván Contreras, Aaron Grosser, Jon Ausdemore, Rachel Leier, Amr Ragy

    "Construction of a new tailings dam was required to increase tailings storage capacity at a trona mine near Green River, Wyoming. The new dam was founded on overburden soils underlain by both fracture

    Jan 1, 2016

  • DFI
    Friction Fatigue and Drivability Analysis of Open Ended Pipe Piles Based on Cone Penetration Testing Results

    By Frank Rausche, Scott D. Webster, Rozbeh B. Moghaddam

    "Pile foundation driveability is a function of several variables such as subsurface characteristics, hammer type, hammer efficiency, pile type, and plugging conditions. One important phenomenon occurr

    Jan 1, 2017

  • DFI
    A Resilience Approach for Design of Earth Retaining Systems with Application on MSE Walls

    By George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis

    "The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.

    Jan 1, 2016

  • DFI
    Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - Synopsis

    By Uwe Hess

    For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th

    Jan 1, 1996

  • DFI
    Westlink Projects – Geotechnical Challenges During The Execution Phase

    By Robert Thurner, Albin Norrman, Sami U. Raja

    The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s

    May 1, 2022

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term Exposure

    By D. Barber, A. D. Miller, P. A. Bray

    The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx

    Jan 1, 2017