Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Process Circuit Developments-Wet High Intensity Magnetic Separator Plant, Hamersley Iron Pty. Limited Mount Tom Price

    As part of its Concentrator operation Hamersley Iron Pty. Limited uses wet high intensity magnetic separation to upgrade shaley low grade ore in the minus 0.5mm size range. Materials handling probl

    Jan 1, 1978

  • AUSIMM
    Biomineralisation ù A Novel Approach for Immobilising Toxic Metals in the Environment

    By L C. Thompson

    Biomineralisation is the process by which microorganisms mediate and catalyse inorganic reactions so as to form new mineral assemblages. The goal of biomineralisation as a remediation tool is to contr

    Jan 1, 2004

  • AUSIMM
    Recent Enrichment Events in the Sources of Philippine Arc Magmas: Sr and Nd Isotopic Evidence

    By Raczej I, Defant M

    Pre-Miocene igneous rocks from the Phili pine island arc are characterised by 87Sr/86Sr and 143Nd/144Nd ratios typical for intra-oceanic island arcs where sediment involvement in the magma genesis

    Jan 1, 1987

  • AUSIMM
    The Application of Production Testing to the Assessment of Potential Water Flows in Coal Seams

    By Forster I, Thilo A, Dean AK

    A prototype production tool capable of operation in the hole sizes (

    Jan 1, 1988

  • AUSIMM
    Subsidence Prediction from the Beginning - Collie Coal Basin(Western Australia)

    By Evans A, Jones O

    Surface subsidence resulting from "total extraction" of coal in the Collie Basin first occured in 1987 when Western Collieries Ltd trialled the Wongawilli mining method. Because very little quantit

    Jan 1, 1992

  • AUSIMM
    Prediction of Rock Cutting Performance using Fracture Mechanics Principles - A review

    By Waller M. D, Whittaker B. N, Singh R. N

    This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process

    Jan 1, 1992

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: III. Engineering Design and Erection

    A contract for three 20 ft diameter vertically mounted axial flow fans of the same aerodynamic design, was placed by Mount ]sa Mines Limited in 1963. The hydraulic blade pitch changing mechanism, the

    Jan 1, 1967

  • AUSIMM
    The Application of Nueral Networks to Size Analysis of Material on Conveyors

    By Denby B, Miles N. J

    The underlying theory behind the construction of an on-line size analysis system is described together with an introduction to the Artificial Intelligent techniques that it is founded on. Previous s

    Jan 1, 1995

  • AUSIMM
    Prevention and Suppression of Gas Explosions in Mines

    Since 1958 there have been 16 major coal mine explosions in the U.S. claiming 323 lives. Whilst the exact cause of a number of these incidents has not been determined, the majority has involved gas

    Jan 1, 1981

  • AUSIMM
    Investigation and Analyses of Sudden Outbursts of Gas during Driving of Mine Roadways

    By Likar J, Janexic S, Zigman F

    When driving mine roadways in the vicinity of tectonic disturbances and fault zones, sudden outbursts of gas, along with ejections of fine coal, occur. Substantial dynamic changes occur around the

    Jan 1, 1992

  • AUSIMM
    Hydrothermal Mineral Deposits and their Association with Granitoids in the Cullen Mineral Field, Northern Territory

    By Needham RS

    Hydrothermal mineral deposits are the dominant mineral deposit type in the Cullen Mineral Field, and have been important sources of tin, tungsten gold, silver-lead, zinc and copper. The deposits a

    Jan 1, 1984

  • AUSIMM
    Modern Blast-Furnace Practice

    By Irving R. C

    THE objective of the iron smelter is naturally the production of high quality iron at the lowest practicable cost. To enable this, large tonnages are put through the blast furnace, and, at the same ti

    Jan 1, 1930

  • AUSIMM
    Recent Developments in Blast Furnace Practice (c2d107f7-9e36-42a5-af20-345e4b5b7ab3)

    The approach to this subject is a very general one, but an attempt has been made to cover briefly a very wide field in the nationally important job of manufacturing iron for the iron and steel industr

    Jan 1, 1947

  • AUSIMM
    Excavation Engineering - The Integration of Excavation Design, Blast Design and Reinforcement Design

    By Chitombo G. P, Thompson A. G

    Excavation engineering involves three key design processes; excavation design, blast design and reinforcement design. An excavation engineering methodology is proposed in an attempt to promote integ

    Jan 1, 1995

  • AUSIMM
    Stability Control and Monitoring in Deep Latrobe Valley Open Cuts

    By Fraser CJ

    Stability control plays a prominent part in the planning and execution of coal winning in the deep open cuts in the Latrobe Valley operated by the State Electricity Commission of Victoria (SECV). D

    Jan 1, 1982

  • AUSIMM
    Igneous Procsses in Sills

    Establishing the link between the solid, cold rock of dikes, sills, plutons, and lavas and hot, active magma chambers is the quest of igneous petrology. Differentiation of Earth, the diversity of the

    Jan 1, 1990

  • AUSIMM
    Volcanic Stratigraphy, Structure and Controls on Mineralization, Golden Cross Mine, New Zealand.

    By McOnie A. W, Rutherford PG

    A volcanic sequence is described from the Golden Cross Mine, Waihi, New Zealand. The sequence includes seven lithostratigraphic units comprising flow and pyroclastic units of Coromandel Group andesit

    Jan 1, 1995

  • AUSIMM
    Site Investigation Drilling on the Derwent River

    By Billingham R

    The Department of Mines Tasmania employs a Drilling Section for specialised drilling re- quired by government and semi-government bodies. The section has a complement of nine crews oper- ating auger

    Jan 1, 1977

  • AUSIMM
    Operating a Continous Haulage System at United Colliery

    By Boyling A

    United Collieries Pty Limited is an Australian mining company operating one underground coal mine, United Colliery at Warkworth in the Hunter Valley district of New South Wales. Centrally positioned,

    Jan 1, 1998

  • AUSIMM
    Utilising New Technology

    Over the longer term, the adoption of new technology is an essential component in the endless tasks of reducing mining costs, improving safety and improving environmental standards. However the cho

    Jan 1, 1997